• Leaking Stoppage Agent System 1
Leaking Stoppage Agent

Leaking Stoppage Agent

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Leaking Stoppage Agent

Usage
The product is a new high-tech products developed by our company, its feature is quick setting and hardening, high minute strength and can produce micro expansion and can be used extensively in the urgent leaking stoppage and repairs of funnels, mines, culverts, water pools, basements, roof coverings and military projects, fit for use in large volume dry basis leaking stoppage, high speed jet and anchoring as well as special projects in winter construction and water proof and leaking stoppage agent, etc.

Technical Requirements
1 Executive standards: Q/XBN06-2000 high efficiency leaking stoppage
2 Grade: leaking stoppage-10
3 Specific surface area: more than 500m2/kg
4 Coagulation time and net liquid strength:

Coagulation time (min)

Mortar compression strength (MPa)

Initial coagulation

Final coagulation

15 min

1 hour

1 day

1-4

3- 6

>=10

>=20

>=25


Directions
1. Before using, cut the leaking point or seam into the shape of bell mouthing or wedge, clear away the scraps and prepare suitable tools and measuring instruments.
2. Put 1kg of the leaking stoppage into the pot, adding 0.30 -0.36kg of water, quickly mixing it into fluids. In winter construction warm water should be used, and in summer construction cold water is used. Excessive or lack of water all affects the construction quality. Too much water make the fluids too thin and reduces its strength while the lack of water makes the fluids dry and hard, sample can be used if the conditions permit.
3. Quickly press the mixed thick fluid against the direction of leaking, until the thick fluid is hardened. Generally within 10 minutes water leaking can be stopped, then apply mortar mixed with expansive agent or ordinary cement mortar to the surface and curing for 3 days.
4. For the serious water-leaking seam, method of drainage is adopted. First stop the upper seam and then the lower seam, and at last stop the drainage hole.
5. For large area leaking, find out the leaking point, first stop leaking with the leaking stoppage king then apply cement mortar with expansive agent.
6. Generally speaking, it is not suitable to use the powder directly to stop leaking. Under urgent circumstances (such as water pool or cabin leaking),powder can be applied directly to the leaking point or water pit and press it with hands or feet until it is hardened.
7. The leaking stoppage can be very hot after water is put into it, when used in large volume, care should be taken to cool it and prevent splitting and cracking.
8. If it is necessary to prolong construction period, retarding agent can be mixed.

Package, Storage & Handling
The cement is packed in two ways: paper cartoons and packages. When packed in cartoons, the net weight of each is 20kg (containing 10 packages);damp pro of package is adopted in packaging with a net weight of 25kg each, and not less than 98% of the marked weight other forms of packaging to be decided by the supply and requisitioning parties. In transport and storage special attention should be paid to guard against dampness and not to be mixed with other miscellaneous articles. The period of storage cannot be more than 3 months, if the time limit is exceeded, or is dampened and caked, it can be used only after being rechecked to see if it is qualified.

Q: Does anyone know the purpose and standards of all dry mortar? To mark the mortar (such as DPRMDM) behind the mark use Thank you
Is a dry powder-like building aggregate, binder and additives, according to a certain percentage, prior to the factory accurate, uniform, special mixture of a granular or powder mixture, in the form of bags or bulk sent to Construction site, add water after mixing can be directly used mortar building materials
Q: Waterproof engineering should be arranged at what time to do the best?
If it is interior decoration, in the indoor civil engineering and buried after the completion of the dark tube, began to carry out the best.
Q: JS waterproof paint what is the composition of what the characteristics of the product, how the construction principle, and other waterproof material What is the difference? What are the advantages and disadvantages of the problem? Thank you heroes! More
Polymeric waterproof coating abbreviation (JS waterproof coating) is a rigid and flexible Tongji two-component waterproof material, such materials environmental protection, and the base surface of a strong bond, fast drying, harmless color products. Home waterproof paint preferred beauty Paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint, paint,
Q: Promise insulation mortar and hollow glass beads non-polar insulation mortar What is the difference
Glassy beads is a kind of environmentally friendly new type of inorganic light insulation material, in addition to a light weight, insulation, insulation, fire excellent performance, but also has not burned, high strength, low water absorption, easy and good life Long advantage
Q: Waterproof coating type Ⅰ and Ⅱ What is the difference between ah?
A lot of waterproof materials, including coatings and coils, are divided into type I and type II or even type III, mainly physical properties of the distinction between the distinction that some of the mechanical properties of the level, and some only show the performance difference, for different Waterproof selection of parts. Such as "JS" waterproof coating type Ⅰ strength and elongation were 1.2MPa / 200%, Ⅱ type were 1.8MPa / 80%, one is low strength and high extension, the other is high strength and low extension, suitable for different waterproof parts The Another example is the infiltration of crystalline waterproof material Ⅰ and Ⅱ type that impermeability level, Ⅱ type impermeability better. Also used in class I and class II, this distinction is mainly to indicate the material morphology or material composition of the different, such as polymer cement waterproof mortar Class I and II said emulsion type and dry powder type. What is the specific performance of the waterproof coating may look at the corresponding waterproof material standards, such as polyurethane waterproof coating is GBT "polyurethane waterproof coating"
Q: Is the cement-based waterproof coating the same as the cement-based infiltration crystal?
A class, the latter is only one of the class
Q: 1 ton of inorganic insulation mortar is equal to how many cubic
insulation mortar is a variety of lightweight materials for the aggregate, cement as cement, mixed with some modified additives, mixed by the production and mixing made of a pre-mixed dry mortar
Q: Building materials after the test is how to deal with? So much of the steel and other materials, the detection mechanism is how to deal with these materials?
Project Comprehensive Grade A Comprehensive Grade B Comprehensive Grade C Traffic Engineering Special Bridge Tunnel Engineering Special Test Test Personnel Certificate Total Number ≥ 32 people ≥16 people ≥7 people ≥22 people ≥25 people holding test test engineer certificate number ≥12 people ≥6 People ≥ 3 people ≥ 10 people ≥ 12 people Certified engineers professional configuration materials, highway professional ≥ 3 people, bridges, tunnels, pay security professional ≥ 2 people material professional ≥ 3 people, highway professional ≥ 2 people, bridge professional ≥ 1 people materials, highways, bridges, respectively, ≥ 1 people mechanical and electrical engineering professional ≥ 6 people, safety facilities professional ≥ 4 material professional ≥ 2 people, bridges, tunnels, respectively, ≥ 5 people related professional senior title number ≥ 6 people ≥ 1 people - ≥ 4 people ≥ 6 people in charge of technical person 1.
Q: Are those materials in the construction project required to be tested?
As long as you are on the use of materials on the site need to do experiments, such as concrete, sand, stone, cement should be sent to the laboratory to do experiments, the laboratory will be out of concrete mix, if you need to use steel bars, Room to do the experiment, after the completion of the information inside to pay the experimental data, if not the experimental data convulsions Emperor Chi Gao gambling astronomical performance, the Audit Bureau will not recognize.
Q: I expect a correct answer, not guess, the answer is best to have some evidence of the source, thank you
I expect a correct answer, not guess, the answer is best to have some evidence of the source, thank you learn trace Yang asked you: 1: 1: 6 cement mortar concrete? Is not the word wrong, there is this? (In the end is mortar or concrete) Question is wrong, is 1: 1: 6 cement mortar A: 1: 1: 6 is mixed mortar, is the volume ratio

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches