• High-strength non shrinkage grouting material of pisolite System 1
  • High-strength non shrinkage grouting material of pisolite System 2
  • High-strength non shrinkage grouting material of pisolite System 3
High-strength non shrinkage grouting material of pisolite

High-strength non shrinkage grouting material of pisolite

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000吨 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

A, grouting material product introduction:

Grouting material with special cement as binder, selected high strength materials as aggregates, with high flow, micro expansion, anti segregation and other material prepared.

The product has good gravity flow, rapid hardening, early strength, no shrinkage, expansive; non-toxic, harmless, non aging, on water quality and no pollution to the surrounding environment, self sealing good, rust and other characteristics. In the construction aspect with reliable quality, reduce the cost, shorten the construction period and convenient advantages. To fundamentally change the equipment base force, so that the whole load uniformly bear device, so as to satisfy all kinds of machinery, electrical equipment (heavy equipment of high precision grinder) installation requirements, is the ideal filling material without pad mounted era.

Two, the scope of application:

Grouting material is mainly used for: the anchor bolt anchor, runway repair, nuclear power equipment, Luqiao fixed reinforcement engineering, machine base, steel structure and foundation with export, equipment foundation grouting, planted two times buried reinforced, concrete structure reinforcement and reconstruction of old concrete structure, crack control, electrical and mechanical equipment installation, track and installation of steel structure, static pressure pile engineering piles, structure of the wall thickening and repair the leakage, all kinds of foundation engineering collapse grouting and various repair engineering etc..

Three, the conventional physical properties of grouting material:
Model No.
Compressive strength(MPa)

Vertical expansion rate

(%)
Fluidity

Grip strength

Round steel.

MPa
The bleeding rate(%)
Remarks
6h
1d
3d
28d
1d

The initial fluidity

30min Fluidity retention value
28d
Universal type
--
≥15
≥30
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

High strength

--
≥30
≥40
≥70
≥0.02
≥260
≥230
≥4.0
≤1.0

Early strength type

≥20
≥30
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0
High early type
≥22
≥30
≥40
≥70
≥0.02
≥260
--
≥4.0
≤1.0

Super flow type

--
≥15
≥25
≥50
≥0.025
≥300
≥250
≥3.5
≤1.0
High temperature resistant type
--
≥22
≥40
≥60
≥0.02
≥260
≥230
≥4.0
≤1.0

The engineering design reference: anchor bolts for anchoring cement

380
340
290
270
The maximum set size(mm)
≤4.75
>4.75and≤16
Fluidity(mm)

The initial flow

≥380
≥340
≥290
≥270*
≥650**
30min retention value
≥340
≥310
≥260
≥240*
≥550**

Vertical expansion rate

(%)
3h
0.1~3.5
24h and 3H expansion difference
0.02~0.5
Compressive strength(Mpa)
1d
≥20
2d
≥40
28d
≥60
There is no corrosion of reinforced
NO

Qinshui rate

(%)
0



The engineering design reference

Cement based grouting material choice for anchoring bolt anchor

The spacing of the surface of the bolt and the hole wall(mm)

Cement based grouting material categories
15~50

340、290

50~100
290、270
>100
270

Cement based grouting material selection with two grouting:

Filling layer thickness(mm)

Cement based grouting material categories
5~50
380
20~100
340
80~200
290
>200
270



Four, product characteristics

"Pour 1-3 days after high early strength was as high as 30Mpa, shorten the construction period.

Since the flow field - just add water, stir, direct filling equipment foundation, mortar self construction, free vibration, ensure the grouting construction of long distance without vibration.

Casting body is used for a long time without shrinkage / micro expansion, to ensure that equipment and basic close contact, no shrinkage between the foundation and foundation, and appropriate expansion of the compressive stress to ensure the long-term safe operation of equipment.

* anti oil leakage after 30 days soaking its strength in the oil increased by more than 10%, molding, compacting, impermeability, adapt to the base oil of environmental protection. * durability 2000000 times fatigue test, 50 times freeze-thaw environment test strength has no obvious change.

"Good weather -40 to 600 DEG C is safe for long-term use

* low alkali corrosion resistance of the strict control of raw material of alkali content, suitable for alkali aggregate reaction inhibiting requirements engineering.

Five, the use of methods

1 Foundation Treatment

Cleaning equipment based on the surface, there shall be no stone, laitance, dust, dirt and other debris demoulding agent. Before grouting 24h, fully moisten the surface of equipment foundation. Before grouting 1H, should be sucked up water.

2 determine the grouting method

According to the actual situation of equipment base, selection of grouting method of corresponding flow, because of its good performance, in general, with "weight grouting" can, will paste directly from template export poured into slurry, completely rely on the self weight to leveling and filling the whole filling space; if a large area, especially the complex structure of perfusion or a very small space and distance, can use "high funnel method grouting" or "pressure grouting, grouting method" to ensure that the slurry can be fully filled every corner.

3 formwork

According to the grouting and grouting construction diagram determined by the way of support design templates, template location elevation should be higher than the equipment on the base surface of at least 50mm, template must support of a tight, firm, to prevent loosening, leakage.

The 4 stirring grouting material

According to the water feed products recommended certificate than the amount of water, mixing water should be used to drinking water, the water temperature to 5 ~ 40 degrees is appropriate, can use mechanical or manual stirring. By mechanical mixing, stirring time is generally 1 to 2 minutes. The use of artificial mixing, should first join 2/3 with water and stir for 2 minutes, then add the remaining water to continue to stir until evenly, standard consistency water volume is 12%-14%.

5 grouting

Grouting construction should meet the following requirements:

(1). The slurry should be poured into the side, until the other side overflow until, in order to facilitate the discharge between the device frame and concrete foundation of air, so that the filling, not from the four sides of the grouting.

(2). The grouting after the start, must be continuous, not interrupted, and should be possible to shorten the filling time.

(3). During the grouting process should not be vibrated, when necessary, available bamboo laths were pulling the diversion.

(4). Each filling layer thickness should not exceed 100mm.

(5). The grouting long equipment or track foundation, should use the segmental construction. The length of each section is appropriate in 10m.

(6). The grouting process such as the discovery of surface bleeding phenomenon, can dispenser a small amount of dry material, sucking up water.

(7) for the foundation of equipment grouting layer thickness is greater than 1000mm in large volume, stirring grouting material according to total ratio 1:1 join 0.5mm stones, but the required test for determining the groutability can not meet the requirement.

(8). The equipment foundation grouting is completed, should be removed part shall be treated in the grouting layer before the final setting.

(9). In the grouting construction process should be avoided until the mold, filling layer by vibration and collision, so as not to damage the pending grouting hard layer.

(10) the horizontal distance between the template and the equipment of the base should be controlled at around 100mm, in order to facilitate the grouting construction.

(11) slurry filling in phenomena such as appearance, should be timely treatment.

(12) when the equipment foundation grouting amount is larger, should adopt mechanical agitation mode, in order to ensure grouting construction.

6, maintenance

(1) after grouting is finished. In 30 minutes, immediately spray curing agent or covered with plastic film and affix rockwool were maintenance, or in the grouting layer after the final set immediately sprinkler wet maintenance.

(2) in winter construction, conservation measures shall be in accordance with the "reinforced concrete construction acceptance norms" (GB50204) the relevant provisions.

(3) at different temperature curing time and removal time schedule

Daily minimum temperature (c) time of stripping (H) curing time (d)

         -10 - 0                96                    14

0 -5                             72                    10

5- 15                            48                     7

15                              24                    7


Q: 1 square mull retaining wall is equal to how many square stone
Need to block 1.02 square bar, plus loss, budget fixed injury is the case
Q: Whether the mortar waterproofing agent needs to be sampled for inspection
The format of the power of attorney for each place is different, but the main content is basically the same
Q: Recently to do the concrete (texture) model, probably a flower pot size, to find the next material, only to find mortar, mortar, yellow sand and the like, cement, then it seems to sell a few bags of white water Danti orange Li Li mat Dead mud, or white portland cement. What I want to do is the kind of concrete that is gray. Do not know what materials I want to stir or mortar mixing directly to the abrasive on the like? If you want to use the mortar, then, is to buy rigid or flexible? More
Directly on the mold on the line, buy a good good
Q: The use of cinder and other waste slag production of brick materials to enjoy what preferential policies
Construction materials, refers to the brick (excluding sintered ordinary brick), blocks, ceramic, wall, pipe, concrete, mortar, road covers, road fence, fireproof materials, refractory materials, insulation materials , Waste residue refers to mineral processing waste residue, smelting waste residue, chemical waste residue and other waste residue The proportion of slag and the proportion of raw materials used in the production of raw materials, shall be calculated in terms of weight, shall not be calculated in terms of volume
Q: Construction site masonry mortar requirements M5 should be how to configure how the calculation is very urgent Thank you, ah
Cement 32.5 (general) M5 mix ratio (weight ratio): cement: sand = 1: 5.23. Each cubic meter of brick masonry, the need for M5 cement mortar is 0.238m. of which 67.59Kg cement; sand 354Kg (0.26m3).
Q: Waterproof coating type Ⅰ and Ⅱ What is the difference between ah?
A lot of waterproof materials, including coatings and coils, are divided into type I and type II or even type III, mainly physical properties of the distinction between the distinction that some of the mechanical properties of the level, and some only show the performance difference, for different Waterproof selection of parts. Such as "JS" waterproof coating type Ⅰ strength and elongation were 1.2MPa / 200%, Ⅱ type were 1.8MPa / 80%, one is low strength and high extension, the other is high strength and low extension, suitable for different waterproof parts The Another example is the infiltration of crystalline waterproof material Ⅰ and Ⅱ type that impermeability level, Ⅱ type impermeability better. Also used in class I and class II, this distinction is mainly to indicate the material morphology or material composition of the different, such as polymer cement waterproof mortar Class I and II said emulsion type and dry powder type. What is the specific performance of the waterproof coating may look at the corresponding waterproof material standards, such as polyurethane waterproof coating is GBT "polyurethane waterproof coating"
Q: What waterproof material can be combined with cement mortar to play a waterproof effect?
If the use of flexible waterproof coating to do the bottom, the flexible features of the tensile effect is also good waterproof, mortar waterproof waterproof surface to do, both play a waterproof and protection to serve two purposes
Q: How to install squatting pan? Need to pay attention to what matters?
1. Installation of stainless steel Squatting pan Common tools: tape measure, the level of two. Installation of stainless steel squatting pan Common materials: raw material belt, glass glue or sludge 3. Installation of stainless steel squatting pan program 1. According to the installed product of the sewage outfall , Reserve the sewer at the proper location from the wall, and determine the distance from the ground plane of the sewer inlet. 2. Under the ground reserved for the installation of stainless steel Squat pan pit depth is greater than the height of the toilet. 3. Insert the coupling plug into the inlet of the stainless steel squatting pan. Apply a layer of glass glue or putty to the outer edge of the stainless steel squatting pan inlet hole, insert the inlet pipe into the plug into the water hole, so that it is sealed with the rubber stopper to prevent leakage.
Q: Bags of dry powder polymer cracking mortar a cubic of the number of kilograms
EVB insulation particles is an inorganic vitreous mineral material, is the highest quality volcanic rocks (pine rock ore) after multi-stage silicon carbide heating tube expansion of the production of glass furnace technology from processing, was irregular spherical particles , The internal porous cavity structure, the surface of the glass closed, shiny smooth, physical and chemical properties and stability, with light, adiabatic, fire, high and low temperature resistance, anti-aging, water absorption and other excellent features, is a high-performance environmentally friendly new inorganic Light insulation material
Q: The external walls of the mortar in the insulation mortar need to do what anti-test materials? Can I provide detailed check-in format, please send to my mailbox @
The original strength, water resistance, resistance to freeze-thaw, flexibility, compressive strength / flexural strength,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords