Industrial Aluminium Profile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Kilograms pc
- Supply Capability:
- 150000 Tons per Year pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Features:
1)Material : 6063 6061 6060 and different aluminium alloy
2)Status:T4 T5 T6 or other special status
3)Surface treatment: mill finish, anodized sliver ,anodized bronze, anodized champagne, anodized black pearl, various power coating color, electrostatic sliver, electrostatic champagne, electrostatic golden, electrostatic titanium , machine polish sliver, machine polish bronze, wooden grain color, and Fluorocarbon spraying.
4)Annual capacity : 120000TON
5)Quality : China Nation Standard GB/T 5237 – 2004 (advanced class)
6)Use: can be widely using aluminium window, door, curtain wall, hand railing , normal aluminium profile, decorative and industrial aluminium profile
7)Advantage: Famous Brand reasonable&market price, soonest delivery and good after sale- service
8)Type of package:protection foam+heat contracted plastic film. / wooden packing / Metal pallet or depand on client’special requirement.
9)Payment term:
T/T:30% of total value as deposite should paid by T/T within 3 days when confirmation ,and the remaining sum should be paid by T/T before delivery.
L/C: 100% at sight
10)Delivery Day: 15-30days
- Q:Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- If the transformer is not calculated, the loss is the same. If the calculation is the latter, save electricity.
- Q:The transformer zero line has broken, has the result to the household illumination circuit?
- The power supply system in three-phase four line zero line is broken, the breakpoint of the single-phase circuit (220V) electrical burn by voltage to 380V. I met, the incandescent lamp suddenly particularly bright then the blow up of internal fuse TV has burned out. So in the three-phase four wire power supply system zero line asked to do repeat grounding in households is the reason.
- Q:1000 square meters low voltage.36 volts lighting power supply with multiple transformers and wires
- To 30VA/ square meters, the transformer needs 30KVA, with two 120 square copper wire. Specific should be used to determine the total power of the lighting transformer.
- Q:How to calculate the rated capacity of small transformers for lighting purposes?
- But in fact, consider the total load, the importance, the location of the machine, and the future additional plan, according to the following order.
- Q:Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- It is not easy to control, the power and lighting and electricity; if the transformer capacity is small, and relatively large power equipment start frequently, voltage stability will be poor, the lamp brightness will fluctuate dramatically, have effect on visual acuity. But as long as the design is reasonable, it has little effect.
- Q:How many can you bring with 220V? How many can you bring with 380V? There are 3 terminals on the transformer. There are 220V, 380V, 0, three terminals. 220V is the 220V terminal and the 0 connection. How can the 380V be connected? Is it 380V and 0 or 380V and 220V?
- Voltage x current = power, in general we are using the total power of 2/3, you can press this type of calculation, if the installation of electrodeless lights, the line should be separated,
- Q:How is the lighting power of the 380V transformer calculated?
- With a light bulb with 4KVA load, the premise of the distance can be Mrs. face light bulb, dark can light the best load, 3KVA bulb brightness
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Pe=19.5KW, installed capacityKx=1 coefficient of demandPjs=KxPe=19.5KW, calculated loadCOS, phi, =0.85, power factorIjs=KxPe/3/220/cos phi (Ijs calculates current, voltage, 380V/220V, three-phase)=1*19.5*1000/3/220/0.85=34.76A
- Q:Can the 500 volt lighting transformer be changed into an electric welder?
- The structure of the electric welding machine is different from that of the transformer, and the magnetic gap of the iron core can be adjusted so that the welding current can be changed. In addition, the output voltage of the welder is also soft
- Q:Why the 21 lighting transformer must double winding type safety isolating transformers, prohibited the use of autotransformer.
- So, safety regulations: lighting transformer must double winding type safety isolating transformer, prohibited the use of autotransformer.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2001 |
Annual Output Value | Above US$100 Million |
Main Markets | South America 0.59% Eastern Europe 0.38% Southeast Asia 0.50% Africa 3.30% Oceania 0.07% Mid East 0.50% Eastern Asia 0.62% Western Europe 0.50% Southern Europe 0.27% South Asia 0.75% Domestic Market 92.52% |
Company Certifications | Guangdong Well-known Brand; Guangdong Famous Trademark Certificate; Tax Payment exxceed 10 million RMB/y; ISO9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Guangzhou |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | |
b)Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | High and/or Average |
Send your message to us
Industrial Aluminium Profile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Kilograms pc
- Supply Capability:
- 150000 Tons per Year pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products