  • Description of Hot Dip Galvanized Steel Plank  Metal Planks 210*45*1.2*2000

  • Material :Q195 (Carbon 195 Steel)

  • Size :210*45*1.2*2000mm(or customized)

  • Surface treatment :galvanized

  • Color : silver

  • ​Hot Dip Galvanized Steel Plank Metal Planks 210*45*1.2*2000 CNBM

  • ​Hot Dip Galvanized Steel Plank Metal Planks 210*45*1.2*2000 CNBM

  • Hot Dip Galvanized Steel Plank  Metal Planks 210*45*1.2*2000


  • Hot dip galvanized steel plank is an ideal Economical & Eco-friendly scaffolding solution for Scaffolding system and Formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
  • Even load capacity: >7kN/ m2  

  • Max span < 2m & Recommended span between 1.2-1.5m.

  • Side box design with better anti - deforming capability

  • 3 strengthen support designs with much stronger support force

  • 500mm support spacing with better anti - deforming capability

  • hot dip galvanizing surface & lifespan > 5 years

  • Punching design to anti-skid & lighten weight

  • Stiffener design with reinforced the load bearing capacity

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:Getting my scaffold (industrial piercing) done tomorrow. Tips?
You should keep your breathing calm so you don't freak out, haha. If you're very terrified of needles, have one of your friends hold your hand while doing it and talk to them while doing this to keep your mind off of the piercing. It should be done very quickly though, so don't work yourself up too much :)
Q:Standard Specification for bowl buckle scaffold
A new type of scaffold developed in China
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?
Hello friends, NG2K said the weight of the standard parts of the standard value of the axial forceNG2K (kN) formula: NG2K = NG2+NG3+NG4 = 3.094 kN; NG2 and NG3, respectively, NG4(2) scaffolding deadweight standard value (kN/m2); the bamboo scaffold board, the standard value of 0.30NG2= 0.300 x 7 x 1.500 x (1.050+0.3) /2 = kN = 2.126;
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:Info on scaffold piercing?
a million. there is a few discomfort in touch. in simple terms relies upon on the way you cope with it. 2. there is new information that even after years of having the piercing it could nonetheless substitute into contaminated =/ 3. It has a bent emigrate because of the fact of ear strengthen (your ears in no way particularly provide up growing to be). 4. Dont over sparkling it. 5. Its executed with a medium gauge needle. 6. i comprehend in the States that many piercing places won't touch everybody under sixteen inspite of parental consent. there is likewise a many greater that isn't touch a minor (everybody under 18). So i could call around and notice.
Q:Scaffolding Piercing Help?!?
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range