​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
30000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Description of Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4

  • Material :Q235 (Carbon 235 Steel)

  • Size : 1219*1930*42*2.4

  • Surface treatment :galvanized

  • Color : silver

  • Standard: BS1139

    Package: By pallet


​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

​Hot Dip Galvanized H Frame Scaffolding 1219*1930*42*2.4 CNBM

  • Hot Dip Galvanized H Frame Scaffolding 1219*1219*42*2.0 Futures:

  • A Light & Safe Frame Scaffolding System with low cost.

  • Integrated with the formwork, Toe-board, the cross diagonal tie pole, steel plank, and adjustable support base.

  • The scissors-style push-pull prop designs ensure the high-performance stiffness & load-carrying property

  • The φ36 connecting rods exert an equal pressure.

  • The Surface galvanized plug-pin firmly connected the pull prop & main frame.

  • Adopt the CO2 gas protection welding technology ensures the superior corrosion & oxidation resistance.With Universal wheel (scaffolding wheel).



  • What are your products' advantages?

  • Experience: over ten years in scaffolding manufacturing.

  • Quality: Certified by SGS, BS1139, EN74, Local Test Report.

  • Price: Moderate, Reasonable.

  • Service: Friendly and Responsible. OEM service is available.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:scaffold, where to buy?
Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
Q:Do you have to have a certain ear shape for Industrial/Scaffold Piercings?
your okorder.com/... and they usually cost about 40$
Q:Specific specification for erection of civil scaffold
Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:What are the functions and requirements of the masonry wall
4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q:opinions on scaffolding piercing and how to hide it from school :)?
Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
When the double row scaffolding longitudinal distance 1.5m, horizontal distance 1.2m, step 1.8m, as per 100 square meters of double row scaffolding rod parts
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
Disc scaffolding systemIs a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range