HDG Painted Q235 steel high loads carrying capacity Cup Lock Scaffolding

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:


cup lock scaffoldings:

mobile scaffold

Packaging & Delivery

Packaging Detail:cup lock scaffoldings pallet
Delivery Detail:cup lock scaffoldings 30days


cup lock scaffolding 
Characteristic:Simple structure,Safety and Steady, High loading, Re-used



cup lock scaffolding 
Characteristic:Simple structure,Safety and Steady, High loading, Re-used 


cup lock scaffolding

cup lock scaffolding


  1. Simple structure: The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

  2. Safety and Steady: The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.

  3. Multi using: According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.

  4. High loading: The standard actuates axially, this makes the scaffolding in the three-dimensional space, high strength and steady of the structure. The cross plate is good at axial shearing resistant, and makes the axis of each pipe in one plate, so it improves 15% strength and steady performance.

  5. Re-used: Luowen scaffoldings are made by high grade steel, they are not easy to damage or out of shape, so it could be used repeatedly

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:Scaffolding stuck, need ideas for removing.?
WD 40, angle grind off what you can.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:Are Nuclear Matrix and Nuclear Scaffold the same thing?
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:What's the difference between scaffold and industrial piercing?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q:Scaffolding/industrial piercing?
Scaffold/Industrial piercings definately hurt more than a regular lobe piercings because it's in the cartilage area and its pierced at a larger gauge but the pain is bareable. On a scale of 1 to 10 (10 being the worst pain) I would say an Industrial would be anywhere from a 4-6 depending on your pain threshold. Freezing it probably wouldn't be nessesssary. I got a 14g Industrial pierced on one ear and a 16g helix on the other both on the same day (the industrial was done first) and in my opinion the 16g helix hurt more. So it really depends on how well you tolerate pain
Q:Can you do the outer scaffolding?
(2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm
Q:What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q:Scaffolding Piercing Help?!?
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range