• H Frame Steel Scafolding For African Market System 1
H Frame Steel Scafolding For African Market

H Frame Steel Scafolding For African Market

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

specifications:  

1) material:Q235

2)dia:42x2.3mm

3)surface treatment: painting /powder  coated /electro-plate

4)standard :en74/bs1139/iso9001:2008

5)oem service is available

 

H Frame Steel Scafolding For African Market

 

Q: i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q: What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q: What are the main safety problems when dismantling the scaffold
5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
Q: ..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Execution by hanging.
Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q: along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q: Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
Q: Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords