FS Solar Mounting System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Solar Mounting System

Die Schletter Freilandsysteme zeichnen sich durch minimale Montagezeit,

lange Lebensdauer und hohe Wirtschaftlichkeit aus. Anhand vorgegebener Projektdaten - länderspezifischer Normen und Vorgaben - berechnen wir für Sie die komplette Statik und

erstellen einen lückenlosen Projektplan. Dies garantiert eine verlässliche Standsicherheit und

hohe Ausfallsicherheit.

  • Maximaler Vorfertigungsgrad

  • Keine Bodenversiegelung

  • Schnelle und einfache Montage

  • Perfekt aufeinander abgestimmte Systemkomponenten

  • Hohe Wirtschaftlichkeit

  • System mit Rammfundamentierung

  • Optimierte projektbezogene Planung

  • Ausgezeichnete Materialeffizienz, bis ins Detail optimierte Systemanschlüsse

  • Systemkomponenten aus Stahl

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,
Q:What is the solar stent system?
Concept: In order to maximize the power output of the entire photovoltaic power generation system, combined with the geographical, climatic and solar resource conditions of the construction site, the support structure of the solar modules in a certain orientation, arrangement and spacing is usually a steel structure and an aluminum alloy
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:What is the metal material for the RESOLUTE bracket?
drugs need to be lipophilic in order to pass through the fat Cell membrane, to inhibit the role of smooth muscle hyperplasia.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:What are the characteristics of the hydraulic support hydraulic system?
Third, the hydraulic support can be replaced lines and substitutability must be strong, that is, after the failure, can be replaced in the shortest possible time and maintenance, thereby reducing the loss and protect the safety of workers!
Q:What is the support frame at the bottom of the car?
When the frame is subjected to an impact spring deformation, the distance between the two ears is likely to change
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range