• Frequency Conversion Building Lift Elevator with Double Cage System 1
  • Frequency Conversion Building Lift Elevator with Double Cage System 2
  • Frequency Conversion Building Lift Elevator with Double Cage System 3
  • Frequency Conversion Building Lift Elevator with Double Cage System 4
  • Frequency Conversion Building Lift Elevator with Double Cage System 5
Frequency Conversion Building Lift Elevator with Double Cage

Frequency Conversion Building Lift Elevator with Double Cage

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
3000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

SC200/200 3*2*11kw building electric hoist


Descriptions of our building hoist:

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance, the gering adopts imported bearing, enameled cable, and oil seal, the electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG, the racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers, the surface of the structure can apply paint-spray, Parkerizing baking finish or hot galvanizing processing according to users requirements, the cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Material Hoist 

1.      the recommended cage dimension(LXWXH):2.0X1.0X2.5, 2.5X1.0X2.5, 2.5X1.3X2.5, 3.0X1.5X2.5, 3.2X1.5X2.5, 3.8X1.5X2.5, 4.0X1.5X2.5, 4.2X1.5X2.5 etc, we can also manufacture cages of other size according to the user.

2.      The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to your requirements.

3.      The mast and the tie-in surface can adopt paint-spray, or hot galvanizeing processing.

 

Advantage of our building hoist:

1. Our own systems of production engineering.

2. Production design from the concept to the engineering details.

3. Technical experts with great experience in the sector.

4. Continuous development of new solutions and products adapted to the requirements of our clients.

5. Methodology and project procedure administration in compliance with current guidelines.

6. Extensive worldwide commercial network

 

Specification of our building hoist:

 

ModelSC200/200G
Playload capacitykg2000/2000
Erection load capacitykg1000/1000
Lifting device capacitykg300
Maximum lifting heightm450
Speed (50Hz/380V)m/min0~63
Safety deviceSAJ50-2.0
Cage platform dimension (L×W×H)m3.2×1.5×2.5
Mast section type (L×W×H)mm650×650×1508
Motor power (bevel wheel)kw2×3×11
Inverter Powerkw2×75
Enclosure weightkg1480
Cage weightkg2×1500
Driving machine weight (bevel wheel)kg800
Mast section weightkg150 (δ=4.5)
170 (δ=6.3)
190 (δ=8.0)

 

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

Production line 

 

 

 FAQ

  1. 1.      why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 



 

Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
There is no technical requirement, usually to see party a's request, want to be with party a the ground level that finish finished decorate just like, can,
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
The inspection, inspection, inspection and acceptance of the inspection station shall not be put into operation
Q:Can a construction elevator use a single cage
Can use single hanging cage, an accident is a management issue could not be struck down so many people, if such construction lifter dual-use goods elevator belongs to the people, 19 people find this elder brothers say batter to death then top with manned elevator nor safe, in fact is a regular inspection, site do not have an accident can only say that the site is too lax
Q:What is the main function of elevator motherboard?
A control system includes light, machine, electric, calculate, calculate the mainboard is mainly responsible for, the equivalent of the human brain, it gathers the elevator running status, corresponding analog signal output, control of elevator running properly and safely.
Q:How does the construction lift fall without electricity
The lockers are finished with the report, unless there is a problem
Q:Can construction elevators be taken by people or by goods
According to GB 26557-2011, "a vertical guide for people with vertical navigation". 5.6 lift cage 5.6.1 general When the maximum number of passengers can be carried, the maximum amount of the ceiling shall be calculated according to the area of 0.2 square meters per person, and the weight should be calculated at 75 kg per person.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
In ten days: installation company qualification (including business license, qualification certificate, safety production license, organization code certificate and company performance, etc.), installation personnel qualifications (including the principal, special operations personnel, etc.), installation construction scheme (including the construction organization design, safety and civilized construction scheme, construction progress) The installation process: in materials to submit for approval (material inspection report, certificate, etc.), play equipment to submit for approval (mechanical factory qualified certificate, safe use license, etc.) After the construction is completed, the certificate of safety inspection (which needs to be provided by the special security agency)
Q:Gear rack driven
The driver of the elevator ladder cage is driven by two or three worm gear reducers, which carry heavy lifting parts, and gravity is carried by the rack. At rest, the force point is in the meshing of the gear and rack. It is the main balance between the rewire rope and the ladder cage and the relative motion. For heavy can improve dynamic performance, a heavy on the ladder cage running more smoothly, when a fall, fall of heavy can slow down the ladder cage speed, it should be said that safety performance is better.
Q:Construction elevator positioning should consider which problems
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content. Based on past accidents and on-site inspections, we often find topics that we think should be examined in a critical area
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords