Formwork Ductile Iron tie rod for construction

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

usage: be used with wing nut Process: cold rolled Tensile strength: more than 190KN
type: formwork accessories Item: Formwork Ductile Iron tie rod for construction finish: black,electroplate
weight: as your size Size: 1m,2m,3m,4m,5m,6m etc Material: 45# steel
color: white,yellow

Product Description:

Formwork Ductile Iron  tie rod for construction

Product Description


Commodity name

Formwork Ductile Iron  tie rod for construction

Usage

be used with wing nut 

Origin

China Mainland

Material

Q235 or 45#steel

Process

cold rolled

Surface

Electro-galvanized,natural,HDG

M.O.Q

2000PCS

Packing

steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS

Advantage

1.High Quality  2.Professional service 3.Competitive price

Notes

Special marks can be made according to customers requirements;


It is available to produce by customer drawing.

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System,

 Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories

Formwork Ductile Iron tie rod for construction

Formwork Ductile Iron tie rod for construction

Formwork Ductile Iron tie rod for construction

                                    Formwork Ductile Iron  tie rod for construction Formwork Ductile Iron tie rod for construction

.jpg

 

Company Information

 

Our Services

Formwork Ductile Iron tie rod for construction 

Production processes

Formwork Ductile Iron tie rod for construction 

Packaging & Shipping

Formwork Ductile Iron tie rod for construction

Certificates

3 (1)



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q:What are the requirements for the sampling inspection of scaffolding?
Quality specification for the cantilever support1 the material of the suspension bearing frame should have the certificate of quality and quality inspection report;2 the height and length of the weld shall meet the design requirements, and shall not have any defects such as welding cracks, structural deformation, corrosion and so on;3 the production quality of the suspension frame shall be in conformity with the provisions of appendix D table D.1.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
i sharted. PS: please purchase my new toilet hawaii chair
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:Scaffold removal should comply with those requirements......
3 removal of safety technical measures should be made clear to each operator. 4 removal of the scaffolding materials, debris and ground obstacles, and will be affected by the mechanical and electrical equipment and other pipelines, such as removal or protection.
Q:The relevant provisions of the demolition of the external wall scaffold:
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:How badly does getting an industrial/scaffolding piercing hurt?
Well of course it depends on the person. Some people say the piercing isn't bad at all, while some say it is really painful. Some people say the healing process is absolute hell, but for some people it's a breeze. I got an industrial 3 months ago, and i would rate the actual piercing process as a 8/10 (10 being the most painful). It was pretty painful in my opinion, but the good thing is that the pain doesn't last long at all. Most people i know who have industrials say that the healing process is more painful than getting the piercing, but for me it was the complete opposite. Immediately after the piercing it throbbed and was a tiny bit sore for about an hour, then for the next 2 days it was completely painless. But after that, it was pretty sore for about 2-3 weeks, but it wasn't that bad. Now after having it 3 months, it still feels a bit uncomfortable when i sleep on it, sometimes it's a tad bit sore, but no big deal at all :)
Q:What's the film where gene Kelly dances on scaffolding?
I think it's Living in a Big Way.... I could be wrong...
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
York Minster Scaffolding
Q:scaffold, where to buy?
heres okorder.com there are many different sizes and kinds of scaffolding , buy what best suits your needs...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range