Formwork Ductile Iron tie rod for construction
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Formwork Ductile Iron tie rod for construction
Product Description
Commodity name | Formwork Ductile Iron tie rod for construction |
Usage | be used with wing nut |
Origin | China Mainland |
Material | Q235 or 45#steel |
Process | cold rolled |
Surface | Electro-galvanized,natural,HDG |
M.O.Q | 2000PCS |
Packing | steel pallet |
Delivery time | 20-25 days after order confirmation |
Payment term | T/T, L/C, Western Union |
Business type | Manufacturer and exporter |
Certifications | SGS |
Advantage | 1.High Quality 2.Professional service 3.Competitive price |
Notes | Special marks can be made according to customers requirements; |
It is available to produce by customer drawing. | |
Main products | Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding system, shoring prop, formwork system, frame system, Accessories |
Formwork Ductile Iron tie rod for construction
Company Information
Our Services
Production processes
Packaging & Shipping
Certificates
- Q:opinions on scaffolding piercing and how to hide it from school :)?
- While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
- Q:I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
- I agree with A Silent Reminder - They're the same thing, just called something different in different places. I find that people in the U.S call it an Industrial, and those in England call it a Scaffold.
- Q:would a scaffold piercing look gay on a guy?
- i guess it depends on what you look like.
- Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q:Cantilever scaffold technical disclosure
- Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
- Q:Scaffolding installation and precautions?
- The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
- Q:Also what 2 cell populations in the body that don't routinely undergo cell division
- The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
- Q:Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
- According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
- Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- Is to produce weight between each vertical rod scaffolding force
- Q:I couldn't believe it, but yes it happened...
- Yes I can. Did you hear about that drunk guy who survived a 17 story hotel fall. I think he ended up having a broken foot.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Formwork Ductile Iron tie rod for construction
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords