Elevator air virus Filter Freshener for air purifier, virus Filter, sterilization, freshener
- Loading Port:
- Shanghai
- Payment Terms:
- TT
- Min Order Qty:
- 10 set
- Supply Capability:
- 50000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Warranty: 1 YEAR
After-sale Service: Online Technical Support
Project Solution Capability: Others
Place of Origin: Shanghai, China
Brand Name: CMAX
Model Number: BUNN016
Warranty Time: 12 Months
Payment: Union.Paypal TT
Delivery Time: 3-7Days
Supply Ability
Supply Ability:5000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details:Carton box/wodden box
Port:Shanghai
Lead Time :
Quantity(Pieces) | 1 - 100 | >100 |
Est. Time(days) | 7-10 | To be negotiated |
Product Description
The ravage of virus estranges people from elevators or even scares them a lot.
However, in fast-paced metropolises, elevator is inevitable for the majority..
People still feel unassured and reluctant to take elevators even if they are disinfected every day.
The intelligent elevator air disinfection and purification system newly launched by CNBM can safeguard your health by wiping out terrible virus, bacteria and aerosol.
The intelligent elevator air purifier
Applied to elevator cabins with small space.
CNBM Elevator Air Disinfection and Purification System, with double technology in disinfection with high performance, is especially developed for the ambience of elevator, which can effectively disinfect air and cabin walls inside as well as maintain hygiene and environmental protection.
The elevator air filter are used for Wuhan , Shanghai, Shenzen, Suzhou, Beijing in hospital, Office, School, Subway and other public buildings.
1 . The elevator air sterilizer has Ultraviolet (uv)+ GERMAGIC chlorine dioxide sustained-release molecular material + Chlorine dioxide slow-release molecular material
2. The killing rate of viruses and bacteria is over 99
Fully closed uv catalyst sterilization, sterilization rate of more than 99%, deep sterilization to reduce droplet infection, aerosol transmission
3. It supports real-time disinfection alternating air every five minutes.
Car CFD airflow simulation
4. The output air volume is 60m3 /h, which can be calculated according to the general specifications of the elevator: 1.5mx1.5mx2.3m. Indoor disinfection and ventilation can be completed more than 11 times per hour.
5. Authoritative Certification report
Project case-some public buildings and hospitals
- Q: What is the basic structure of the cabinet?
- Cabinet according to the components of the load-bearing, materials and manufacturing processes of different, can be divided into two basic structure of profiles and thin plate.
- Q: The technical requirements of the cabinet
- should be standardized, standardized, serialized requirements lor coordination
- Q: Data room with the cabinet U from the bottom up, or from the top down there are a unified standard?
- so that users in the final installation of the correct installation and quick installation. Not only practical, but also has a modern science and technology atmosphere.
- Q: How to install a variety of equipment and cabinets?
- equipment more server room recommended column head cabinet way, so that integrated wiring cable pool to the column cabinet, rather than the core cabinet, thus saving twisted pair and fiber.
- Q: Why the data room requires the total current of each cabinet does not exceed 13A
- when all the way out of power, the load will cut to another way. This server is supposed to add up to 13A, then it can not be placed (the energy saving mode has changed to normal mode).
- Q: How are the different grades of cabinets differentiated?
- so the more expensive routers, firewalls are generally placed in such a cabinet inside.
- Q: How does the cabinet cooler solve local overheating problems inside the cabinet?
- Air conditioning large volume, difficult to install and to regular maintenance, high operating costs
- Q: What is the goal of the forward line?
- At the bottom of each module, the twisted pair corresponding to the module is withdrawn from the bottom of the harness, which is fixed on the carrier frame of the module or into the module hole of the patch panel.
- Q: What is the problem with the cable? I
- , a large number of redundant accessories (such as Foshan electrical appliances, storage arrays, etc.), cabinet equipment configuration changes frequently
- Q: Cabinet 1U and 2U difference, there are familiar with the details of the next good
- Thickness to 4.445cm as the basic unit. 1U is 4.445cm, 2U is 1U 2 times to 8.89cm. That is the so-called "1U PC server", is the shape to meet the EIA specifications
Send your message to us
Elevator air virus Filter Freshener for air purifier, virus Filter, sterilization, freshener
- Loading Port:
- Shanghai
- Payment Terms:
- TT
- Min Order Qty:
- 10 set
- Supply Capability:
- 50000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords