• Door Frame Scaffolding with Hot Dip Galv System 1
  • Door Frame Scaffolding with Hot Dip Galv System 2
  • Door Frame Scaffolding with Hot Dip Galv System 3
Door Frame Scaffolding with Hot Dip Galv

Door Frame Scaffolding with Hot Dip Galv

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

3.Frame Scaffolding product pictures:

 

Door Frame Scaffolding with Hot Dip GalvDoor Frame Scaffolding with Hot Dip GalvDoor Frame Scaffolding with Hot Dip Galv

 

 5.FAQ

 

Presented like a shape of doorFrame-connected Scaffolding includes main framehorizontal framecross bracestage board and adjustable base. In order to display frame with coupler system enough,good performance of stability,firm structure of the whole,easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

 We have organized several common questions for our clientsmay help you sincerely

1How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.

Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
Tip: don't have it done.
Q:Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
i'm no longer saying you're too youthful. yet a place that pierces with out I.D. oftentimes isn't very sparkling. i could purely ask your mothers and dads to take you to get 2 cartilege piercings (in view that it somewhat is particularly what it is). as quickly because it heals, you are able to placed a bar in it later. i do no longer see why a parent could techniques extra ear piercings on their infant. If it somewhat comes right down to it, you're able to do it your self. purely verify which you do purchase a piercing needle on line (new and interior the equipment) and be sterile approximately it. Use wiped sparkling rings.
Q:What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
Q:Construction scaffolding right angle fastener, rotary fastener, butt fastener weight? There are more than one meter steel pipe?Thank you!!!
High efficiency of the installation and removal of only bare handed, greatly improve the efficiency of mobile scaffolding assembly and disassembly than the steel pipe frame 1/2 fast time, faster than bamboo scaffolding 2/3 time. Safe and reliable 1 overall performance is good: equipped with a foot board, parallel frame, buckle wall tube, horizontal and cross bar...
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
Here is a good analysis and summary from Shmoop.
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords