Concrete Pump Truck Camc 8*4 56m Cement
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Camc 8*4 56m Cement
Product Details
Basic Info.
Model NO.:AH5430THB0L4
Type:Concrete Pump
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Power:Diesel
Emission Standard:Euro II&III&IV
Truck Type:Concrete Pump Truck
Seats:≤5
Tire Certification:ISO
Drive Mode:8*4
Vertical Reach:56m
Export Markets:Global
Additional Info.
Trademark:CAMC
Packing:by Container/Nude Packing/Roro Ship
Origin:China
Production Capacity:10000 Units/Year
Product Description
Complete vehicle | Performance index | unit | AH5430THB0L4 ( 56m 8*4 ) | |
Max. theo. concrete output (L./H.) | m 3 /h | 150 | ||
Max.concrete pumping pressure | Mpa | 9 | ||
Concrete cylinder diameter×stroke | mm | 260×2200 | ||
mm | 2200 | |||
Pumping frequency | /min | 22 | ||
Distribution valve type | S | |||
Overall dimension | mm | 14380*2495*3990 | ||
Total weight | kg | 42805 | ||
Hopper volume | m 3 | 0.6 | ||
Inside diameter of delivering pipe | mm | 125 | ||
Loading height | mm | 1400 | ||
Clean system | Capacity of water tank | L | 600 | |
Water supply | L/min | 10 | ||
Water pressure | Mpa | 4 | ||
Arm sections | Model | RZ | ||
Maximum height from the ground | m | 55.6 | ||
Maximum horizontal delivery distance | m | 51.6 | ||
Maximum depth | m | 42.8 | ||
Angle of revolution | . | 0~365 | ||
Angle of development angle | 1 | . | 90 | |
2 | . | 180 | ||
3 | . | 180 | ||
4 | . | 236 | ||
5 | . | 225 | ||
6 | . | 85 | ||
7 | . | / | ||
Leg span | LONGITUDINAL SPAN | mm | 10374 | |
formal | Front Leg span | mm | 9400 | |
Back Leg span | mm | 11780 | ||
one side | Front Leg span | mm | 6200 | |
Back Leg span | mm | 7390 | ||
Hydraulic system | High pressure | Mpa | 32 | |
Low pressure | Mpa | / | ||
Low pressure | / | 22 | ||
High pressure | / | / | ||
Low pressure | m 3 /h | 140 | ||
High pressure | m 3 /h | / | ||
Hydraulic Oil tank | L | 800 | ||
hydraulic pump pressure | Mpa | 400 | ||
Chassis | chassis model | HN5432THBB43D5M4J | ||
Drive mode | 8*4 | |||
Max speed | km/h | 89 | ||
Minimum turning radius | m | 9.6 | ||
Braking length | m | 35 | ||
Number of axles | 4 | |||
Tyre | mm | 12.00-20,12.00R20 | ||
Oil tank | L | 400 | ||
Engine | Engine | |||
output power | kw/(r/min) | 338(1900) | ||
Displacement | L | 11.81 | ||
Emission | EuroII , III , IV |
- Q:What is the price of concrete pump truck?
- The most expensive two or three hundred thousand years, expensive millions.
- Q:How to achieve the concrete pump pendulum for the change?
- 2. Proximity switch or stroke switch is a commutation signal to the sequence valve, and then the first valve to give a commutation signal to the main cylinder to a commutation signal.
- Q:Whether the concrete pump truck is paying the vehicle additional tax
- According to the General Administration of Taxation explained: only with a fixed device, non-transport vehicles can be exempted
- Q:How to install concrete pump
- 2, after the operation of concrete pump, such as high-pressure filter transmitter in a red position, you need to replace the filter.
- Q:What are the precautions for the operation of the concrete pump truck?
- The minimum amount of cement in the pumped concrete is 300 kg / m3.Pumping concrete sand content should be 38% to 45%.
- Q:What is the meaning of cast - in - place concrete secondary grouting?
- Grouting equipment is divided into two kinds of mechanical and manual, the building is more manual, (like the peasant playing the kind of hand pump with pesticide).
- Q:Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q:How to prevent concrete pump blockage
- Concrete or mortar segregation: wet water pipes before the pump, from the lowest point of the pipe pipe joints will be released, the remaining water will be let go, or pump water, pump mortar before, put a sponge ball, the mortar and water separated.
- Q:What parts are concrete pump parts?
- Concrete pump from the hopper, pumping system, hydraulic system, cleaning system, electrical systems, motors, walking chassis and other components.
- Q:Is it easy for small concrete pumps?
- because the equipment manufacturers are now more than 10 years of production experience
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Pump Truck Camc 8*4 56m Cement
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords