Concrete Pump Truck Camc 39m 6*4 Cement
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Camc 39m 6*4 Cement
Product Details
Basic Info.
Model NO.:AH5290THB0L4
Type:Concrete Pump
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Power:Diesel
Emission Standard:Euro II&III&IV
Truck Type:Concrete Pump Truck
Seats:≤5
Tire Certification:ISO
Drive Mode:6
Vertical Reach:39m
Export Markets:Global
Additional Info.
Trademark:CAMC
Packing:by Container/Nude Packing/Roro Ship
Origin:China
Production Capacity:10000 Units/Year
Product Description
Complete vehicle | Performance index | unit | AH5290THB0L4 ( 39m 6*4 ) | |
Max. theo. concrete output (L./H.) | m 3 /h | 170 | ||
Max.concrete pumping pressure | Mpa | 7.5 | ||
Concrete cylinder diameter×stroke | mm | 260×2000 | ||
mm | 2000 | |||
Pumping frequency | /min | 24 | ||
Distribution valve type | S | |||
Overall dimension | mm | 12520*2495*3930 | ||
Total weight | kg | 28805 | ||
Hopper volume | m 3 | 0.6 | ||
Inside diameter of delivering pipe | mm | 125 | ||
Loading height | mm | 1400 | ||
Clean system | Capacity of water tank | L | 600 | |
Water supply | L/min | 10 | ||
Water pressure | Mpa | 4 | ||
Arm sections | Model | C | ||
Maximum height from the ground | m | 38.6 | ||
Maximum horizontal delivery distance | m | 34.6 | ||
Maximum depth | m | 26.8 | ||
Angle of revolution | . | 0~365 | ||
Angle of development angle | 1 | . | 90 | |
2 | . | 180 | ||
3 | . | 180 | ||
4 | . | 235 | ||
5 | . | / | ||
6 | . | / | ||
7 | . | / | ||
Leg span | LONGITUDINAL SPAN | mm | 7976 | |
formal | Front Leg span | mm | 7794 | |
Back Leg span | mm | 7764 | ||
one side | Front Leg span | mm | 5397 | |
Back Leg span | mm | 5382 | ||
Hydraulic system | High pressure | Mpa | 31.5 | |
Low pressure | Mpa | / | ||
Low pressure | / | 24 | ||
High pressure | / | / | ||
Low pressure | m 3 /h | 150 | ||
High pressure | m 3 /h | / | ||
Hydraulic Oil tank | L | 800 | ||
hydraulic pump pressure | Mpa | 35 | ||
Chassis | chassis model | HN5332THBB41E2M4J | ||
Drive mode | 6*4 | |||
Max speed | km/h | 96 | ||
Minimum turning radius | m | 10 | ||
Braking length | m | 30 | ||
Number of axles | 3 | |||
Tyre | mm | 12.00-20,12.00R20 | ||
Oil tank | L | 400 | ||
Engine | Engine | Hino, Cummins ,Sino ,CAMC,Weichai,Hangfa,etc. | ||
output power | kw/(r/min) | 302/(1900) | ||
Displacement | L | 11.81 | ||
Emission | EuroII , III , IV |
- Q: What is the difference between a concrete pump and a valve?
- pump and diesel and two major series, to be specific according to your actual situation
- Q: What are the drawbacks of concrete pump gate valve and S pipe valve?
- The seal of the gate valve is limited by the structure and the sealing pressure is low. In the construction, it is inevitable to use the Y-shaped pipe to connect the double cylinder and the conveying pipe of the concrete pump, and the Y-tube will produce a large pressure loss.
- Q: How to prevent concrete pump blockage
- Concrete or mortar segregation: wet water pipes before the pump, from the lowest point of the pipe pipe joints will be released, the remaining water will be let go, or pump water, pump mortar before, put a sponge ball, the mortar and water separated.
- Q: What is the maintenance method of concrete pump?
- Disassembly Pipeline cleaning should be taken before the anti-pumping method to clear the pressure of the pipeline.
- Q: What is the cause of concrete pump blockage?
- Take over, should first remove the air inside the delivery pipe, and then tighten the pipe end connector.
- Q: Building concrete pump is how to bulk cement (concrete) to the high
- When the hydraulic system pressure oil enters a main cylinder, the piston rod is extended and the other piston rod is retracted by the pressure oil of the sealing circuit connecting the pipe.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Cast concrete is cast at the construction site. Unlike prefabricated concrete, most buildings are constructed using cast-in-place concrete.
- Q: How is the mortar in concrete pumping concrete coexisting and distinguishing in a pump?
- When the pump starts to press the concrete, the speed should be slow, when the concrete is sent to the end of the pipe, the speed can be gradually accelerated, and transferred to the normal degree of pumping.
- Q: What is the difference between the concrete pump and the concrete pump?
- The use of pressure to transport the concrete along the pipeline. By the pump and the composition of the pipeline. According to the structure is divided into piston type,
- Q: What is the purpose of concrete pump truck?
- Adapt to the urban construction, residential quarters, recreation venues, overpasses, airports and other construction of concrete construction.
Send your message to us
Concrete Pump Truck Camc 39m 6*4 Cement
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords