Concrete Machinery Concrete Pump SP70.10.113D

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. The high quality hydraulic valves and oil pump use Germen REXROTH or Japan Kawasaki products.

2. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.

3. Advanced hydraulic system which change direction hydraulically can run without electrical part.

4. Concrete piston can run back to washing tank, which can easily change the piston and be convenient for maintenance.

5. Tungsten steel glasses shaped plate and cutting ring guarantee long using life.

6. Hydraulic outriggers make easily positioning.

 

ModelUnitSP70.10.113D
Whole performance of pumpMax. theory concrete conveying capacity ( High pressure)m 3 /hr50
Max. concrete pumping pressurebar95
(High pressure)Mpa9.5
Theoretic maximum delivery distancemHorizontalVertical
498142
Main oil pumpml/r112
Distributing valve formApron valve
Main oil cylinder sizemmΦ100Xφ63x1400
(diameter X stroke)
Concrete cylinder sizemmΦ180x1400
(diameter X stroke)
Concrete hopperLX mm550x1300
(volume X charging height)
Outlet diametermmΦ160
PowerEnginePerkins(Model:1006-6T)
systemRated powerkW112
Rated speedr/min2200
HydraulicHydraulic oil way formOpen circuit
systemHydraulic pressureMpa32
Pressure of distributing systemMpa16
Pressure of mixing systemMpa14
Max mixing speedr/min37
Hydraulic oil tank volumeL350
OtherCooling way for hydraulic oilAir cooling or water cooling
dataMax. aggregate sizemmPebble 50,
Crushed stone 40
Outline dimensionmm4250x1600x1650
Total weightKg4360

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of driver's license does the concrete pump need?
Driver's license to use B2 card, qualification certificate can be transported with ordinary goods, no need to use special vehicle qualification certificate.
Q:What is the difference between fine stone concrete pump and tow pump?
Towed concrete pump, referred to as drag pump, is a variety of concrete machinery, for the construction of concrete in the transport and pouring work.
Q:What is the role of concrete pump truck
The pump body installed in the car chassis, and then equipped with retractable or inflected cloth rod, the composition of the pump.
Q:What is the difference between a concrete pump and a concrete pump?
Concrete pump "and" concrete pump "are concrete transport machinery, the same use, but the former need to use the car dragging transport and the need for additional stent pipeline, while the latter is the locomotive body, a free stretch of the boom, no pipe
Q:How high concrete pouring concrete pump can be poured how high?
When the floor height exceeds the applicable height of the car pump, it will use the pump (fixed pump) to pour the concrete, the general height of the pump can reach more than 100 meters to 200 meters.
Q:Concrete tow pump price how much money ??
Professional production and supply of various models of mixer, concrete mixing plant, batching machine, cement warehouse, bulk cement tank.
Q:Whether the concrete pump can pass the height of 3.75 meters
According to the structure is divided into piston type, squeeze type, water pressure diaphragm type.
Q:Will the role of concrete towing pump,concrete raw materials are sand or sand?
At present the highest concrete pump is 72 meters, while the concrete towing pump can reach more than 200 meters above the sky.
Q:What is the lubrication of the concrete pump before it is transported to the concrete?
the second use of concrete with the same name to the mortar mortar lubrication.
Q:What is the method of washing the concrete pump?
1 direct water law 1) check the cutting ring and the eye plate between the wear and tear, which is decided to directly wash the law of the key to success.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range