CMAX 's Tower Crane H5510 TC5510 high quality 6ton

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: construction

  • Rated Lifting Moment: 63MT

  • Max. Lifting Load: 6T

  • Max. Lifting Height: 140M

  • Span: 55M

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: H5510

Packaging & Delivery

Packaging Details:In Nude/40'HQ/ Wooden case
Delivery Detail:30

 

 

 

 

 

ModelH5510
Jib length(m)55
Max. load capacity(t)6
Tip load(t)1
Base typestationary/under carriage/travelling
Hoisting height(m)Free standing(m)40
Anchoring(m)140
Mast section(m*m*m)1.6*1.6*2.8
Electric power(kw)31.7
Working speedFall24
Hoisting capacity(t)31.563
Hositing speed(m/min)0~400~800~200~40
Slewing speed(r/min)0~0.65
Trolleying speed(m/min)0~58

 

 

Tower Crane Series

H5015, H5510, H5810, H6010, H5515, H5515B, H6015, H6015B, H6024, H7030, H7030B, H7050

 

Topless Crane Series

T6010, T6015, T6015B, T6022, T7527, T7527B, T8040, T8040B

 

Luffing Crane Series

Tower Crane Series

 

H5015, H5510, H5810, H6010, H5515, H5515B, H6015, H6015B, H6024, H7030, H7030B, H7050

 

Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 
 

 

Our Services
 

 Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is boom truck a crane truck? Are they the same or two different kind of truck?
A 'boom' is attached to a flat-bed truck and is used to unload a heavy delivery (usually building supplies and materials) to a specific location. A 'crane' is similar except that it doesn't unload things. It is attached to a truck and is used for moving heavy objects and materials from one place on another on the same property.
Q:what is the 1000 paper crane legend and is it true?
I am not sure if it is true, but There is a myth that if a sick person makes 1000 paper cranes they will get one wish from god. Read the story Sadako and the thousand paper cranes.
Q:How to find the surface area of a paper crane?
Do you remember the formula for determining area? For a flat object (like your paper) the formula is Length X Width = Area. or LW=A So unfold your paper, and measure the length and the width, and simply multiply the two numbers. The resulting number will be your area. Of course, that is the area of the unfolded paper. Your crane in it's folded form will have a much different, and harder to find, surface area value.
Q:what's the cheapest way to rent a crane?
call a crane rental company - rates are pretty standard in the industry for each type of equipment
Q:Blue Heron, Crane, or Egret?
these guys described them pretty well. I get to see these types of birds every day here in south florida. We do have a lot of cattle egrets they follow behind you when you mow your yard picking up bugs.
Q:ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
Yes he is a Crane! It turned out that he is Alistair's son by Liz and not related to Whitney in any way because Liz and Eve are only step-sisters. LOL I do believe they stay in the Crane mansion now. It hasnt been made real clear but they are there quite often, even at bedtime / night time, and she is always there to talk to Teresa whenever the blackmailer scares her. Also, his birthday party last week was at the Crane mansion wasnt it? I think they stay there now that Alistair is no longer there.
Q:Biology Question - whooping cranes?
Well, a bottleneck reduces the number of organisms in a population or species down to a much smaller number than previously existed. In the case of the whooping crane, the species underwent a bottlenck event (although what it is I'm not sure), leaving us with less than 12 individual birds. The more widely accepted number of 6-8 birds has given rise to the several hundred whooping cranes alive today. Since only half a dozen sets of genes were used to create the several hundred, there is not much genetic variability.
Q:would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
wow. im helpful anybody tried it!! why : the recommendations co-ordinates the strikes of the finished physique. fairly the arms and the ft, so once you're turning your appropriate foot in clockwise path, with the help of drawing 6 jointly with your hand, that's an ANTI-CLOCKWISE circulate, the recommendations then makes the foot circulate anti-clockwise. Thats how suitable GOD made us!!
Q:what do you mean by a detente ball in the crane of a revolver?
you're trying to create an appeasement, peace through war/violence
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range