Car Port B4

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Car Port B3


Unser Carport System Park@Sol basiert auf der konsequenten Weiterentwicklung der Schletter-FS-Freil

andMontagesysteme, mit denen bereits viele Projekte im Bereich von mehreren hundert MW realisiert wurden.

Besondere Erfahrungen bestehen hier nicht nur im Bereich der individuellen statischen Optimierung für unterschiedlichste regionale Schnee- und Windverhältnisse, sondern auch in der Befestigung beliebiger Modulbauarten.

Wir konstruieren, planen und fertigen individuell geplante Carports schon ab einem Stellplatz.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:What is the solar stent system?
Solar photovoltaic stent, is a solar photovoltaic power generation system in order to place, install, fix the solar panel design special stent. General materials are aluminum, carbon steel and stainless steel. The main parameters: Installation location: Building roof or curtain wall and ground installation orientation:
Q:How to build an effective teaching stent
So, what is the bracket, teaching design and how to build a bracket? This article to a writing design prototype for the case, how to teach in the design of students for learning and development of stent. First, what is the teaching design Teaching design is the protection of effective teaching, although different scholars on the interpretation of teaching design is not the same
Q:What is a finished stent?
Have shortened construction time, reduce maintenance time and so on. The main applications are mainly used in building water supply
Q:Is the template and stent two or one?
The requirements of the stent support: stable, will not be displaced due to pouring and vibrating, bearing capacity, can support the weight of the board after pouring, and demolition of all the pouring parts on the load, safe, will not collapse, or fall Wounding.
Q:How to remove the climbing bag bracket
A good backpack is a good partner, travelers are very seriously and cherish their own mountain backpack. Mountaineering backpack is used for climbing, and other adventure sports (such as rafting, crossing the desert, etc.) and long journeys are also widely used.
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:What are the benefits of finished stents?
The main applications are mainly used in the construction of water supply and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway stent system and other systems.
Q:Specification for installation of fire pipe support
The most common trench in the fire as an example: DN65 ~ DN150 the stent spacing is generally 4 to 4.5 meters (when the stent spacing set with the beam between the cross, because the bracket is often attached to the beam installation), DN25 ~ DN50 bracket Spacing is generally about 3 to 3.5 meters
Q:What is the full support system
Full-frame construction is a long-term method, construction requires a lot of template stent. The construction of the bracket is to erect the bracket at the bridge, pour the concrete on the bracket, and remove the template and the bracket after the concrete reaches the strength.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range