Building Material Drywall Steel Profile ISO Factory

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
11000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Drywall Metal Profile

 Drywall ceiling Channel is galvanized metal structure  used in non-bearing partition systerm .

Drywall steel frame system is a popular way to be used to divide the space,especially using in commercial buildings.

HUILON Drywall Steel Frame System is made of galvanized steel sheet with good rust-Proof function.A variety of frames are ready for customers' demands and designers' choice for different purposes and places. One of our merits is the special hole for channel on C-stud in per 6Ocm which is easy for workers to install the electric lines and water tubes.CH and IH type of studs are the special type we developed to solve the hard work situation in elevator ventilator and offer a better protection of workers' safety.

Our dry wall steel frames are covered with HUILON magnesium fireproof boards and fulfilled with material which is heat insulation and noise-proof mineral wool between two layers of boards. It will create a better living environment than the traditional building materials.

Suspension ceiling structure,Galvanized metal structure which is the vertical metal framework used in non-bearing partition system.

 

Advantage and feature:

 1.Light, good strength, cauterization resistance and water resistance

 2.Matching magnesium fire-proof board, gypsum board and many other walll and ceiling board

 3.Moisture-proof, shock-resistance, environment-friendly and so on.

 4.Easy and fast for install, time-saving

 5.High quality, competitive price and complete sets of style

 6.We can supply you the products based on your specific requirements

 

Specification

Specification for middle east:

Main Channel

38x12 mm

Furring Channel

68x35x22 mm

Wall angle

25x25 mm

C stud

50x35 mm

C Stud

70x35 mm

C stud 

75x35 mm

U track 

52x25 mm

U track 

72x25 mm

U track  

75x25 mm

 

 Specification to Australia:

top cross rail

25x21x0.75 mm

25x21x0.75 mm

Furring Channel

28x38x0.55 mm

16x38x0.55 mm

Furring Channel track

28x20x30x0.55 mm

16x20x30x0.55 mm

Stud

64x33.5x35.5 mm

76x33.5x35.5x0.55 mm

Stud

92x33.5x35.5x0.55 mm

150x33.5x35.5x0.55 mm

Track

51x32x32, 64x32x32x0.55 mm

76x32x32x0.55 mm

Track

92x32x32x0.55 mm

 

Specification to Europe, Russia, UKrain, Georgia. etc

C Stud

60x27 mm

U track

28x27 mm

C stud

50x50 mm

C stud

75x50 mm

C stud

100x50 mm

U track

50x40mm

U track

75x40 mm

U track

100x40 mm

 

Product Overviews 

 

Building Material Drywall Steel Profile ISO Factory

Building Material Drywall Steel Profile ISO Factory

Building Material Drywall Steel Profile ISO Factory

Building Material Drywall Steel Profile ISO Factory

 FAQ

1.Sample: small sample can be offered by free

2.OEM: OEM is accepted

3.MOQ: small order is ok

4.Test: any third party is accepted to test

5.Factory: Can visit factory any time

6.Delivery Time: small order is within 7days or according to your order

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it good for brick walls or light walls?
If you do not have any requirements for noise, you can use light steel keel gypsum board wall, but can not hang things Oh, can not touch, easy to bad. And it's not fire at all. Home in the living room to do a small partition can also be, but used as a large room partition is not desirable
Q:To warm the above has been tiled, with light steel keel to build a wall, how to fix the keel?
With C-beam or two angle steel, LI put two and wall fixed, the keel fixed to the LI. Do not be able to drill on the ground.
Q:Light steel keel partition wall construction process is what
Fixed Border keel: Border keylone along the position of the ball, the edge of the keel should be coincident with the elastic line. The end of the keel should be fixed, fixed point spacing should not be greater than lm, fixed should be solid.
Q:Light steel keel wall circuit how to wear pipe
Install the crossed keel (lower threshold). Fixed with a nail, or first drilling, and with the expansion bolts connected to fixed. Installation should be installed according to the center line and edge, both ends of the top to the structural wall (column) surface, the final fixed point from the structure of the facade should not be greater than 100mm; nail or expansion bolt spacing should not be greater than 800mm. Installation should ensure that the keel level and straightness.
Q:Light steel keel wall waterproof
1. The use of steel coated excellent 1011 metal roof for high-elastic waterproof coating (grass-roots) Used for bonding with the substrate, to achieve 100% continuous sticky. 2. Use 1032 to enhance the polyester cloth Used to enhance the coating of tensile, tear resistance and fatigue resistance. 3. The use of steel coated excellent 1011 metal roof for high-elastic waterproof coating (grass-roots) By enhancing the gap of the mesh structure of the polyester cloth, the intermediate layer and the base coating are fully infiltrated and integrated to effectively enhance the sealing performance of the coating. 4. Use steel coated excellent 1021 metal roof dedicated high-elastic waterproof coating (surface)
Q:With light steel keel gypsum board do partition wall price how to count?
Light steel keel gypsum board to do partition wall artificial about 20 yuan, between 75 --- 120 offer, mainly to see your city and the quality of the material used to decide.
Q:Lightweight wallboard light steel keel how to construction
Damp room and steel plate plaster wall, light partition board keel spacing should not be greater than hundreds of millimeters, the installation of supporting keel, the support card should be installed in the direction of the vertical keel opening, partition wall card should be four hundred To six hundred millimeters, from the keel at both ends of the distance should be twenty to twenty five millimeters, should be fixed according to the location of the ball along the edge, along the keel and border keel, keel line should be coincident with the line.
Q:The room to remove the partition, can not retain the original light steel keel gypsum board ceiling?
The room to remove the partition, you can retain the original light steel keel gypsum board ceiling.
Q:Light steel keel partition wall how to paint
Personal feel that the painting will not affect the load bearing, as the choice of home painting should be bright, festive and music-based content, a symbol of wealth and wealth of peony painting, a symbol of the lotus and koi map, Healthy longevity of the pine and cypress Evergreen and so are more suitable for home furnishings. And should not hang some unexpected things, such as some works but too aloof, only to the collection, on the home as a decoration is not appropriate.
Q:Gypsum board wall is generally done to the height of the original roof or do the height of the ceiling?
First cut off, after the cut off does not matter. Fixed the problem to your decoration workers. No headache. The First cut off, after the ceiling so that when the ceiling of the wall at the top of the site good handling. Cut off the height of more than 3 meters a few centimeters on it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range