• Cup Lock Scaffolding For Customers Using System 1
  • Cup Lock Scaffolding For Customers Using System 2
Cup Lock Scaffolding For Customers Using

Cup Lock Scaffolding For Customers Using

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
15000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details:

Place of Origin: Hebei, China (Mainland)

Model Number: Scaffolding System

Size: Standard Size or OEM Size

Material: Steel Q235,Q345

Certificate: SGS/EN12810

Item: Cup Lock Scaffolding System

Produce Technology: Welding by robot

Delivery Time: 30-35 Days After Confirmation

 

Packaging & Delivery:

Packaging Details:

Cuplock Scaffolding Packing: 

1) Normally scaffolding is loaded to containers in bulk in order to load as more as possible and save sea freight 

2) If customer want to unload by forklift in order to save the labor cost, then we will pack the scaffolding in steel pallet or steel case 

3) Other special requirements can be discussed by both party.

 

Delivery Detail:

25-35 Days after Confirmation

 

Details:



Name 

specification

material

Surface finished

top cup 

φ48

ductile iron

painted/galvanized

bottom cup 

φ48

Q235 Steel Stamping

painted/galvanized

Ledger Blade

φ48

Q235 Forging

painted/galvanized

standard 

48*3--3.25

Q235

painted/galvanized

ledger

48*3--3.25

Q235

painted/galvanized


Cup Lock Scaffolding For Customers Using

Cup Lock Scaffolding For Customers Using

 

Q:I would like to ask what is the erection of external wall scaffolding specification? What do you need to pay attention to?
N need to pay attention to several points: 1, scaffolding load shall not be more than 270kg/m2, after the acceptance of the listing can be used before the use of the regular inspection and maintenance. More than 270kg/m2 load, or the form of special scaffolding should be designed. rn2, steel pipe column should be set metal base, on the basis of the soft foundation of the board should be filled with wood or stick. rn3, scaffolding vertical pole should be vertical, vertical deviation shall not exceed the height of 1/200, vertical pole spacing of not more than 2 meters
Q:What is a bowl buckle scaffold? What is the full house scaffolding?
2) in the scaffolding scaffolding in the interior of the building: in the end, each built a layer of the wall, it is transferred to a floor, a new layer of masonry, it can be used for external wall masonry construction and interior decoration. Scaffolding materials used less, but the assembly and disassembly frequently, it requires lightweight and flexible, easy assembly and disassembly. The structure of the folding type, pillar type and door frame, etc..
Q:when must you wear safety harnesses on scaffolding?
When you're on the scaffolding, of course.
Q:What are the requirements for fastener type scaffolding? How to calculate
Scaffolding: generally used for the wall height of not more than 4m of the house. ?In 1, the scaffold used in floor brick and painting construction. Due to the use of the process of the transfer of the construction site, the installation is more frequent, so its structure and size should be light and flexible and easy to install and disassemble. ?2, there are many forms of scaffolding, according to its structure is divided into folding scaffolding and scaffolding scaffolding
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
Q:I got my industrial pierced on august 17th of this year. About 2 weeks ago this little bump formed on the outside of the bottom hole...i was wondering if i took it out to get it cleaned really good since its kinda hard to fully clean it would that affect it in any negative way? Its only been a month so im a little apprehensive about taking it out but it would only be for a couple minutes...please help!!!!!!!!!!
I wouldn't do it. You shouldn't take them out until they're fully healed. It's a type of scarring from the piercing. Do sea salt soaks twice a day, keep it clean, don't touch it, and it'll be fine! I've got my industrial done, that's what I did and it's gone away now.
Q:stands there.?(from the scarlet letter book.)
I would describe her as strong. The woman has convictions, and she's not ashamed of what she's done. Instead of giving in and telling everybody who the father is so she can lessen her sentence, she stands firm in her actions.
Q:im 15 and i really want scaffolding, but i was wondering if it hurts like looooooads... has anyone got it done? did it hurt alot? and also can it get infected real bad?
How much it hurts depends on your pain tolerance...it's different for everyone. I didn't find mine to be that unbearable. The top (second) hole hurt more than the first but aside from that it was just a bit sore while healing just like all cartilage piercings. If you get it done by a reputable piercer and take care of it properly it shouldn't get infected.
Q:how will i clean it as its very tender to touch.. :(
The best thing to use is sea salt soaks: Add 1/4 of a teaspoon of Sea salt (available in supermarkets) to a mug of kettle boiled water, mix and leave to cool slightly before applying it to the piercing. For this particular piercing it may be best to dip and soak your ear in the cup of solution and leave it there until the water cools. After this rinse away any excess salt, dry carefully, with a cotton bud gently remove any crusty bits and avoid touching it at all, especially with dirty hair/shampoo and conditioner etc. Do this twice a day for a few months after which you can cut down to doing it just once a day and just rinse it with the warm water in the shower.
Q:How much is the adjusting range of the scaffold of the bottom
(5) bridging angle with the ground control between 45 and 60 degrees, scissors and the horizontal rod or pole cross point application of rotary fastener steel tube firmly, the length is not enough available when docking fasteners then long; the scissors must be set on the top in the end, bridging between bottom and foundation pad. In order to enhance the ability of scissors under load.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products