1. Structure ofSingle Side Climbing Bracket SCB 180
The power of the Auto-climbing Formwork is the hydraulic system, which includes the oil cylinder and two inverting boxes. The inverting boxes can control the climbing of climbing rail and the bracket. The steel rail and the bracket can inter-climbing, so the whole system will climb up steadily. Cranes are not needed during the climbing. It's easy to operate, highly efficient and safe. It's the best choice for the construction of high buildings and large bridges.
There are mainly two types of standard auto-climbing formwork, ACS-50 and ACS-100.
2. Main Features ofSingle Side Climbing Bracket SCB 180
Economical and safe anchoring
Simple and flexible planning
Anchor system
Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.
① Tensile bolt M30/L= 110
② Anchor shoe
③ Bowl-climbing cone M30/D15
④ High-strength rod D15
3.Single Side Climbing Bracket SCB 180images
4.Single Side Climbing Bracket SCB 180 Specifications
The M30/D20 climbing cones have been designed especially for single-sided concreting usingSCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the stillfresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.generous bracket spacings allow large-area formwork units with optimal utilization of the bearingcapacity. This leads to extremely economical solutions.
With SCB180 single-sided climbing formwork, circular structures can also be concreted withoutundergoing any large planning process. Even use on inclined walls is feasible without any specialmeasures because additional concrete loads or lifting forces can be safely transferred into thestructure.
5.FAQ of Single Side Climbing Bracket SCB 180
. Please DO check goods when courier knocks your door and contact us asap if any issues.
1) What can we do for you?
.We can ensure the quality of Single Side Climbing Bracket SCB 180paneland avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
- Q: What are the maintenance and maintenance of hydraulic climbing formwork
- Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
- Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q: Advantages and disadvantages of climbing frame and floor type scaffold
- Advantages and disadvantages of climbing frame and floor type scaffoldPjal | browse 5789Recommended 2016-09-21 09:11:21 best answerClimbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. But it also has the disadvantage of fixed structure.
- Q: The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q: What is an integrated climbing frame? What are the works? What are the advantages
- The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Send your message to us
Auto-climbing Formwork Systems for Building-The Best Choice for High Buildings and Bridges
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords