• Aluminum Formworks for Construction Concrete Buildings With High Load Capacity System 1
  • Aluminum Formworks for Construction Concrete Buildings With High Load Capacity System 2
Aluminum Formworks for Construction Concrete Buildings With High Load Capacity

Aluminum Formworks for Construction Concrete Buildings With High Load Capacity

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
8000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

 

Aluminum Formworks for Construction Concrete Buildings With High Load Capacity

Aluminum Formworks for Construction Concrete Buildings With High Load Capacity


4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m

Aluminum Formworks for Construction Concrete Buildings With High Load CapacityAluminum Formworks for Construction Concrete Buildings With High Load CapacityAluminum Formworks for Construction Concrete Buildings With High Load Capacity 

 

 

5. FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.


Q:What is the change in the aluminum template?
Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
Q:Now the domestic use of aluminum template project more?
1, the construction period is short 2, can be reused many times, the cost of compression costs 3, the construction is convenient, high efficiency, easy to install 4, good stability, high bearing capacity, environmental protection, energy saving,
Q:In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q:What is the development prospect of aluminum template design?
More than the number of turnaround, good economy: aluminum alloy template system can be used up to 300 times, each set of template system in a slight improvement can be re-used in the follow-up of new buildings, resulting in long-term low template sharing costs. Aluminum alloy template waste can be fully recycled.
Q:Whether a shear wall aluminum template and wood template can be mixed
Wood molds are low in strength, poor in stability, low profile, low precision, high water loss, high maintenance requirements when the mold surface is released, the time is fixed, the mold time is late and the load capacity is small.
Q:Aluminum template of the aluminum template advantage characteristics
Good stability, high bearing capacity. Most of the aluminum template system bearing capacity of up to 60KN per square meter, enough to meet the majority of residential buildings supporting capacity of the support capacity. Wide range of applications. Aluminum template for wall, horizontal floor, pillars, beams, stairs, windowsill, floating plate and other locations of the use of the ring beam, structural columns, anti-kan and other secondary structure model is still useful. Patchwork less, high precision, demoulding concrete surface effect is good. After the demolition of aluminum construction template, the concrete surface quality is smooth and smooth, basically can meet the requirements of finishes and water concrete, without the need for batch, can save the bulk of the cost.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords