2.0-3.6m Tubular steel shoring prop scaffolding for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | QS-p | ||||
Surface finish: | powder coated/galvanized | Raw material: | Q235 | Load Capacity: | 20-25KN |
H.S code: | 73084000 | Delivery time: | 25days |
Packaging & Delivery
Packaging Detail: | 50PCS/PALLET or Loose in container to load more prop in 20or 40GP container |
Delivery Detail: | 25DAYS |
Specifications
2.0-3.6mSteel support prop
1)Reliable manufacturer 13 years
2)ISO9001:2000 certified
3)fast delivery time
Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.
Product Name: Scaffolding Light Duty Shoring Prop Systems
Model Number: QS-L-1000/1700/1900/2000/2200
Feature:
1. Made By 48mm Diameter inner tube
56mm Diameter outer tube
. Made By 40mm Diameter inner tube
48mm Diameter outer tube
2. Size:
1000mm(Min)--1800mm(Max)
1700mm(Min)--3000mm(Max)
1900mm(Min)--3500mm(Max)
2000mm(Min)--3600mm(Max)
3200mm(Min)--4000mm(Max)
3. Surface finish: Powder coated/Cold/Hot galvanized.
4:top/base plate:120*120*4mm or 150*150*6MM
5:outer thread prop sleeve:63.5*3.75*135mm
6.OEM offered ,manufactured as per customer’s requirement.
Load capacity:1.0-2.5Ton
Type inner thread
Material: high strengh pipe
Surface finish:powder coated or galvanized
Available Size:
Type | Adjustable Length | Outer Tube | Inner Tube | Weight | 20ft Container | Surface Treatment |
Spanish Prop | 800-1400 | 48*1.6*765 | 40*1.8*835 | 4.74 | 3500 | Painted, powder coated, electro galvanized or hot dip galvanized |
1600-3000 | 48*1.6*1600 | 40*1.8*1600 | 7.57 | 2200 | ||
2000-3500 | 48*1.6*1710 | 40*1.8*2000 | 8.45 | 2000 | ||
2200-4000 | 48*1.6*2000 | 40*1.8*2200 | 9.32 | 1750 | ||
Italian Prop | 1800-3100 | 56*1.6*1510 | 48*1.8*1800 | 9.36 | 2100 | |
2000-3600 | 56*1.6*1750 | 48*1.8*2000 | 10.29 | 2000 | ||
2200-4000 | 56*1.6*2010 | 48*1.8*2200 | 11.26 | 1750 | ||
Middle East or German Prop | 1400-2700 | 60*2.0*1340 | 48*2.0*1400 | 9.45 | 2300 | |
2000-3500 | 60*2.0*1540 | 48*2.0*2000 | 11.38 | 2000 | ||
2200-4000 | 60*2.0*1840 | 48*2.0*2200 | 12.7 | 1750 | ||
3000-5500 | 60*2.0*2540 | 48*2.0*3000 | 16.51 | 1500(40ft) |
- Q: I want to know the classification of scaffolding in the building
- Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
- Q: What are the main safety problems when dismantling the scaffold
- 5, all construction materials must be set according to the material classification management requirements must be neatly stacked, "work finished, as material, the site is clean before work".6, on-site construction waste in a timely manner to clean up and deal with the designated place.7, scaffolding workers must be trained and qualified, safety examination, hold certificate to posts jiazigong.
- Q: I'm reading the novel by nathaniel hawthorne. There seems to be a lot going on in the scaffold scenes that i kind of not understand. Can someone explain the significance of these scenes? I am not a fan of cliffnotes or sparknotes because i actually READ the books. please someone who has read it tell me, i appreciate it.
- do you mean the part where she's on the scaffold with pearl when she's just born or when the three of them hold hands and then the priest has to leave? Well either way, the scaffold means embarrassment, it's like having to wear the A but being more upfront with people so you don't really have to explain yourself, everyone just knows. That's the reason, i forget his name, the priest that's pearl's father, goes up to the scaffold, because no one knows he secretly wears the A that's why going on the scaffold allows him to free himself of guilt, he wanted everyone to know so he would stop living in hidden pain but when pearl and her mother come, it makes it too real for him, he kind of wakes up, you could say, so he becomes too frightened and decides not to carry out his plan.
- Q: I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
- i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
- Q: also apprx. what chapters is it in?
- On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
- Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
- Because she owes him since she cheated on him.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- Mobile scaffolding in general are on the basis of rent by the day
- Q: Fastener type steel pipe scaffold composed of which components?
- 3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
- Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
- some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Send your message to us
2.0-3.6m Tubular steel shoring prop scaffolding for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords