two pole screw pile

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

fast intallation,suitable for whatever soil texture ,even on the hill top.time saving,cost saving,lessen construction duration.unnecessarily make large-scale field leveling and excavate ground surface,not destroy land vegetation,pollution-free of geological environment.the products could be recyclable or transplant to other region,recovering original landform after power station finishied,which will be easy to do second ploughing.reclamation and re-exploit.


Installation site  Hillside
 Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  Q235B
  Installation height  customization
  Snow load  1.4KN/m2
  Components arrangement   laterally or longitudinally
  International Standards  comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Mainly used in the construction of the water supply and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway stent system and other systems.
Q:What is the solar stent system?
should be south (tracking system exception) Installation angle: equal to or close to the installation of the local latitude Load requirements: wind load, snow load, earthquake requirements Arrangement and spacing: Combined with the local sunshine conditions Quality requirements: 10 years without corrosion, 20 years of steel does not reduce, 25 years still have a certain
Q:What is a finished stent?
and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway support system and other systems, and so forth.
Q:Is the template and stent two or one?
The template is a model for the new concrete molding. The template system consists of formwork, support and fasteners, which require that the shape and dimensions of the structure and components be accurate. Have sufficient strength, stiffness and stability.
Q:What is the metal material for the RESOLUTE bracket?
drugs need to be lipophilic in order to pass through the fat Cell membrane, to inhibit the role of smooth muscle hyperplasia.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-
Q:Specification for installation of fire pipe support
The diameter of the hole on the bracket is 1 ~ 2mm larger than the diameter of the bolt. The burr on the bracket should be polished in time, and the end of the bracket should be chamfered
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range