two pole screw pile

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

fast intallation,suitable for whatever soil texture ,even on the hill top.time saving,cost saving,lessen construction duration.unnecessarily make large-scale field leveling and excavate ground surface,not destroy land vegetation,pollution-free of geological environment.the products could be recyclable or transplant to other region,recovering original landform after power station finishied,which will be easy to do second ploughing.reclamation and re-exploit.


Installation site  Hillside
 Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  Q235B
  Installation height  customization
  Snow load  1.4KN/m2
  Components arrangement   laterally or longitudinally
  International Standards  comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished stent?
Have shortened construction time, reduce maintenance time and so on. The main applications are mainly used in building water supply
Q:What are the characteristics of the hydraulic support hydraulic system?
Hydraulic support is mainly used in coal mining and other underground production site, so the first is to ensure that when used in these places will not appear fire heart, it will not be charged because of friction and amplification, and thus detonated, so first consider the hydraulic
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:Fire spray installation in the anti-swing stent approach?
4 water branch on each pipe section, adjacent to the nozzle between the pipe set of hanger should not be less than one, the hanger spacing should not be greater than 3.6m.
Q:What is the difference between a shock support and a conventional stent?
he lack of horizontal seismic support structure; 2, seismic support hanger mainly bear the horizontal load of the pipeline
Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:Specification for installation of fire pipe support
The most common trench in the fire as an example: DN65 ~ DN150 the stent spacing is generally 4 to 4.5 meters (when the stent spacing set with the beam between the cross, because the bracket is often attached to the beam installation), DN25 ~ DN50 bracket Spacing is generally about 3 to 3.5 meters
Q:What is the support frame at the bottom of the car?
It is a spring spring pin to the front end of the leaf spring and the front of the steel plate spring front bracket connected together, the front end of the ear hole to reduce the wear and tear with a bushing.
Q:How to build an effective teaching stent
Teaching design to reflect the learner as the center, it must be based on the cognitive needs of learners to design the corresponding activities. Students need knowledge of the reserves, the need for background schema activation, demand strategy skills based on the basis, otherwise learning is difficult to carry out. In other words, the teacher in the teaching design should be based on the needs of students for students to learn and develop stent.
Q:What is a high-profile template system?
Erection height of 8m and above; erected span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above for the "more than a certain size of the larger part of the sub-

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range