TOWER CRANE TC6013

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(3) the amplitude limiting device shall be equipped with a minimum amplitude limiter and a device for preventing the boom of the boom from rebounding after the luffing of the jib. The trolley must be equipped with a trolley switch and a terminal buffer. (4) rail clamping device and walking limit device; track type tower crane must be equipped with rail clamping device. A walking limit device shall be installed at the same time. (5) a crane with wind point at the root of the boom with a height of more than 50m shall be equipped with an anemometer at the top.
Q:Quotes from Thousand Cranes?
squawk arrrk croak squeee rakkk that pretty much sums it up. the other quotes from the thousand or so cranes are just variations on these
Q:What are the climbing claws on the tower crane?
Climbing is lifting work cylinder claw pole on the standard main limb rod bearing points of the.
Q:inventor of junk yard electromagnetic crane?
If its running fine I really wouldnt worry. Remember cars can withstand water, they do after all have to run while its raining out and belive me water gets up in the engine. What you need to worry about is sucking water into the engine through the intake, but since the engine is running now you didnt do that. The intake is high on the engine and designed to prevent that anyways. I would have the clicking diagnosed by a shop, theres way to many things it could be to even speculate here. You might want to mention to them the noise started after you drove through puddle.
Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
Q:how to make a wired crane robot?
There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
Q:What should I do with my 1000 paper cranes?
Sell them or give them to someone who is going to get married. My nephew gave paper cranes to every guest who came to their wedding. Each guest was to write a line of advice or blessing on their crane. Then the cranes were hung on strings with little clips at the reception. It was beautiful! Folding a crane takes time, patience and understanding. These same qualities are vital for a marriage to last. This is why the symbolism of 1,000 hand-folded cranes decorating a wedding is so powerful.
Q:Tips for the crane machine... D:?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...
Q:Stephen Crane and Willa Cather (talk about your odd couples) met briefly. He died shortly after at 29, I think
Due to my present situation, I have thought about this many hours. Many days. Many months. Time, or the lack of it, is generaly considered the enemy. But there are situations that the less of it can be a blessing. None of us can ever know which we will wish for. Until that time comes.
Q:Crane vessel transport?
Very large capacity crane vessels have propulsion machinery for manoeuvring when on station. The most modern designs of semi-submersible vessel use them to achieve 'dynamic positioning'. Older designs used the propulsion systems to assist when deploying the anchors in the correct pattern. The vessels are towed by tugs when making deep sea passages. First generation crane vessels had much smaller lifting capacities and were either constructed on conventional hulls or were converted from existing ships. These types were capable of making ocean passages using their own propelling machinery.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range