Tower Crane 8 Ton Max Capacity China Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
- Option:
- TC5613
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5516(QTZ100)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC5516
Free standing height (m) | 44 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 45、50、55 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 55m(t) | 1.6 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 17.6 | ||||
Mast section size(L×W×H)m | 1.6×1.6×3.0 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
55m jib length:
R m | 3.1—13.5 | 17 | 22 | 27 | 33 | 37 | 45 | 47 | 50 | 52 | 55 | |
a=2 | 4t—24.65m | 3.61 | 3 | 2.61 | 2.38 | 1.95 | 1.8 | 1.72 | 1.6 | |||
a=4 | 8t | 6.2 | 4.62 | 3.41 | 3 | 2.61 | 2.38 | 1.95 | 1.8 | 1.72 | 1.6 | |
50m jib length:
R m | 2.5—15.17 | 19.65 | 22 | 25 | 27.4 | 33 | 38.5 | 42 | 47 | 50 |
a=2 | 4t---27.6m | 3.22 | 3 | 2.71 | 2.37 | 2.2 | ||||
a=4 | 8t | 6.2 | 5.53 | 4.76 | 4 | 3.22 | 3 | 2.71 | 2.37 | 2.2 |
45m jib length:
R m | 2.5—15.17 | 22 | 25 | 27.4 | 29.8 | 33 | 38.5 | 40 | 42 | 45 |
a=2 | 4t | 3.65 | 3.22 | 3 | 2.87 | 2.71 | 2.5 | |||
a=4 | 8t---15.17m | 5.53 | 4.76 | 4.2 | 3.65 | 3.22 | 3 | 2.87 | 2.71 | 2.5 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
- Dr Crane Scarecrow
- Q:cover up? I know he was into pornography and who knows what else!
- Like George Reeves -- who is officially a suicide there are rumors but no convictions.
- Q:Has a gift what im a telling that person.
- the meaning is if you make a thousand crane your wish will come true. and if you give someone a paper crane it symbolizes friendship! :)
- Q:How do I get on the cranes on the Highrise map in MW2?
- watch that video its the easiest way to learn it and not have someone explain through text and what the hell is that first guy saying??
- Q:does anyone have a good slogan for the whooping crane?
- Let the Whooping Crane do what it does best, make Whoopie!!!
- Q:What do you do to become a crane operator, do you go to school and how long is it?
- OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
- Q:How did Romans make columns in roman times Without cranes?
- They simply lay the stone down, chiseled out the column, then stood it up via an A frame, however the Romans did have cranes, (not the massive things of today) but mobile wooden ones with counter weights at the back that operated on a system of pulleys (they even had cranes that operated on water)
- Q:how do you make one of them, put me through sep by step with photos.
- www.okorder /
- Q:I heard on the TV and found it hard to believe. I mean, they are soooo goddamned stupid and dont look like they could muster up the intelligence to bite someone anyway. Also my pet rat catches them and eats them when they blunder into the house and he seems fine! On TV it said they were one of the most poisonous creatures of their species! Should my bullsh1tometer be off the charts?
- How do you equate not biting to sooo gd stupid? You should thank them for eating mosquitoes, moron.
- Q:I was half way through this book and had to stop reading it because school got in the way. I'm back to reading it and I got to the part where Katniss made a noose and tied it around a dummy and showed it to the Gamemakers. And she wrote 'Seneca Crane'. I don't remember who that was. If it was even a person, I guess it was. But can you just explain who or what 'Seneca Crane' is and why Katniss would do that? Thanks.
- He was the previous head gamemaker, and President Snow basically declared that he had Seneca Crane executed. Crane allowed Peeta and Katniss to live and cut off the final moment of the berries, which to Snow was an act of defiance. I think Katniss hanging the doll was just a symbolic act, implying that the gamemakers are really all just puppets under the Capitol.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane 8 Ton Max Capacity China Factory
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
- Option:
- TC5613
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords