TC7135Tower Crane Price Brand New Tower Crane sold on Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane Price Brand New Tower Crane sold on Okorder
Main Features of Tower Crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
FAQ of Tower Crane
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
- Q:I work a few blocks away and my window faces the building, now shrouded in black netting and scaffolding. I cannot comprehend how that crane got up there!!
- Probably a climbing crane. You build a scaffold with your crane, then climb the scaffold with the crane, anchor, then take the scaffold apart re-assemble it above your current position. Repeat until top of building is reached.
- Q:death... by exile!Also, which Batman movie was your favorite and why?Mine was the first because it was cool to see how Wayne started and got all the Batman stuff and the movie was less confusing, haha. Plus I thought the actor Cillian played Scarecrow really great :)
- Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
- Q:I read Maggie: A Girl of the Streets in eleventh grade and I wonder if the author, Stephen Crane, was the same Stephen Crane that married Lana Turner.
- Not according to the iMDB. Here's some other trivia about him: Date of Birth 7 February 1916, Crawfordsville, Indiana, USA Date of Death 6 February 1985, Pauma Valley, California, USA. (anemia) Birth Name Joseph Steven Crane III Spouse Leslie Deeb (1969 - 1978) (divorced) Martine Carol (1948 - 1953) (divorced) Lana Turner (14 March 1943 - 21 August 1944) (divorced) 1 child Lana Turner (17 July 1942 - 4 February 1943) (annulled) Carol Ann Kurtz (31 December 1937 - January 1943) (divorced) Leslie Deeb (? - ?) Helen Demaree (? - ?) (divorced) Helen DeMaree (? - 8 April 1962) (divorced) Trivia Owned a restaurant in Beverly Hills. Became a father to Cheryl Christine Crane on 25 July 1943 by actress wife Lana Turner.
- Q:MP: Do you do any origami?MP: How bored are you at the moment?MP: What do you think of this She Wolf song by Shakira?I can't really form an opinion on it.
- How can I make a paper crane come to life and fly me away to another world? Wish on a paper mache star? MP: Do you do any origami? Randomly yes I do. MP: How bored are you at the moment? Mmmm, I'm a work so yes. MP: What do you think of this She Wolf song by Shakira? I first heard it while viewing the video. I think I probably looked like a deer caught in the headlights. Conundrum.
- Q:Calculate the tower crane gantry crane
- It's a gantry crane, not a tower crane
- Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
- the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
- Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q:I just can't figure this out. They need a crane to assemble tall buildings, but how do they assemble the crane? Especially if the building is over 20 stories high. What crane can build a crane higher than itself?
- a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.
- Q:What special operators should be equipped for the installation and disassembly of tower cranes?
- 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
- Q:Dear Friends, I wish to design a crane mounted industrial truck of overall weight 2 to 3 tons (including the load). I need a Diesel engine, wheel and brake system, drive system, steering system to desii#92;gn a truck. Please suggest me what all the available cheepest automobile spare parts will suitable for my design and whr can i get these parts easily
- You probably meant a truck-mounted crane. There are industries offering ready-made solutions that work. Have you ever designed a truck or a crane before? It's a challenging engineering task and it can't be improvised. Besides, whatever you design and build will have to undergo extensive testing before being authorized to operate on public roads. The solution would cost more than anyone would care to pay for it. Consider buying a used rig instead.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TC7135Tower Crane Price Brand New Tower Crane sold on Okorder
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords