TC5613 8T Crane Mechine with CE ISO Certificate

Ref Price:
$40,000.00 - 80,000.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of TC5613 8T Crane Mechine with CE ISO Certificate

1,  TC5613 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 57m, TC5613tower cranes are famous for their large operating ranges, varied working methods and wide uses.     

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TC5613 8T Crane Mechine with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate

TC5613 8T Crane Mechine with CE ISO Certificate



Tower crane Specifiction

TC5613 8T Crane Mechine with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

 

4: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:All types of jack up cranes. How is the maximum lifting torque converted?
The moment of the tower crane is set up by the factory, and can not be changed. How do you want to convert it?If the nominal torque is converted to kn tons, 1 tons is equal to 9.8 kn.
Q:What are the construction cranes? 50
Tower crane, crane, man goods elevator, lift, there are national standards
Q:How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
With the weight of the tower crane is mainly ordinary tower cap tower crane, tower crane and tower crane type, is made of concrete counterweight pieces of the balance arm, is also useful for iron making, but relatively rare.The tower crane without counterweight is mainly a city quick loading tower crane. It is characterized by the absence of balance arm, and it is impossible to have counterweightThe layman can not tell the can see the appearance, there are long steel structure before and after the weight of the tower body, and no weight of the tower body with only one steel structure (i.e. jib crane, structure)
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.
Q:What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.
Q:What is the difference between a crane and a crane in a tower crane?
Informal: hoisting signal worker: refers to the signal flag!Cable man: rope!
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range