Product Description:

Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How the engineering quantity of the square wood supporting the template in the construction project is calculated
Square wood do not have to calculate the amount of work, the amount of each type of template area contains a number of m3 square wood to consider, if you are extracted, then you can first calculate the template area, and then set the quota. The number of wood is the amount you want to mention!
Q:400 thick concrete roof template support system need expert demonstration?
No need. Because 400mm thick is very common, the saying goes to stand the top of the jack - are now steel pipe stent, generally do not support the phenomenon can not afford
Q:Unilateral support basement wall waterproof protective layer do not do it?
How to do it on how to do it, brother, you have seen a few do the protective layer of the basement does not leak, huh, huh!
Q:Construction template supporting the use of steel pipe and pull the bolt how much money a ton
Tube is tons of billing, because the wall thickness is different so the price is different, it should be about 6000 it, of course, the pipe is good or bad, the price is different. Bolt site are called fasteners, fasteners, of course, there are weight of the small 1.4 pounds of the general also 1.7 pounds, it should be about 4.0 it
Q:How does the new building shear wall template support safe operation?
Shear wall template support system consists of the following parts: bars, vertical bars, corners, Yang angle, locks, hole card, wall bolts
Q:Does the template support of the beamboard contain the full red scaffolding under the beam?
Of course, according to theory, this full house is not a scaffolding shelf, is the template bracket.
Q:The problems of improper matching of template supporting system and preventive measures
Template support matching improper phenomenon due to the template support system matching and support methods improperly, structural concrete pouring deformation.
Q:Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole. Suzhou Zhicheng Construction Scaffolding Engineering Co., Ltd. is engaged in various: door scaffolding, trapezoidal scaffolding, all kinds of casters, steel pipe fastener channel leasing, construction site scaffolding erection, stage structures, interior and exterior decoration scaffolding
Q:Template Support System Safety Control
Strengthen construction management. Including the strengthening of the template support system technology management and security management. Template support system should be designed after the first construction. Strictly in accordance with the template design technical program to operate, are not allowed to change, if there are problems, must be approved by the template designer or by the technical director at the approval of a higher level before proceeding. Steel pipe should be checked before use, excessive deformation and serious wear and tear of the steel pipe shall not be used.
Q:How to calculate the bearing capacity of the template support
(Static load + dynamic load) * safety factor = construction load. A fastener carrying 3 tons.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range