Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the template support of the beamboard contain the full red scaffolding under the beam?
Many times it is easy to mix the template support with the scaffolding, the template support is to play a supporting role, scaffolding is the platform for workers to operate, both because of the same material so easy to be confused.
Q:Construction template supporting the use of steel pipe and pull the bolt how much money a ton
Pad wood template should be called I-shaped steel bar, there are several other names of steel "H-beam, T-beam, I-shaped steel, channel, angle" like these large steel market are sold
Q:the country is allowed to use
Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.
Q:After the pouring with the template removed and then how to support
Do not remove the template, but in the template design and erection must be considered in the post-pouring stand alone erection in order to facilitate the future beam, board concrete to a certain strength after the other full scaffolding removed, leaving the part of the back with the template and support. (Theoretically requires beams and plates of concrete strength to reach 100% to be removed). So that the support design of the post-pouring zone takes into account that the value of the load must meet the requirements of this part to support the independent composite and take the necessary observation and maintenance measures for the template and support. This approach allows the concrete at the post- The template is disturbed, resulting in adverse damage to the structural requirements of the bad.
Q:Building template support structure has been widely used
In the current housing construction are required to achieve a certain level of engage in shock, so the general buildings are cast-in-place floor and shear wall structure, so the construction template support structure has been widely used, the national timber increasingly depleted, the domestic north and south are limited Deforestation, steel shear wall template support will become a trend in the future cast-in-place concrete support frame.
Q:How long does the width of the template support more than how much height the beam can not be poured at the same time?
Tool-based template works: including sliding mode, climbing mold, flying mold works. Concrete template support works: erect height of 8m and above; erection span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above.
Q:Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Sweeper: part of the scaffolding project, the sweeping pole is 200mm from the ground, the horizontal bar connecting the base of the pole. Divided into vertical and horizontal sweeping pole, play a stable scaffolding effect. Vertical sweeping rods: sweeping rods arranged longitudinally along the scaffolding; horizontal sweeping rods: sweeping rods arranged horizontally along the scaffolding; lateral sweeping rods are passed under the longitudinal sweeping rods and passed through the lateral sweeps to the base.
Q:Template support product features
High repeatability: 300 times reusable, while traditional wood can only be reused for 5 to 6 times. High degree of safety: This product is completely steel structure, standard parts fastening, tight structure, compact connection, more secure and reliable. Enhance corporate image: beautiful and tidy, clean and generous, the construction site clean and orderly, easier to manage, can greatly enhance the overall image of the project.
Q:What is a template for pulling bolts
The structure of the bolt is used to connect the concrete component template, also called the pull screw!
Q:How does the new building shear wall template support safe operation?
These parts together with each other to form a complete construction support equipment system to protect the building body of the force surface of the uniform, so that all parts of the strength of uniform strength, solid structure, to enhance the quality of concrete pouring, demolding after The smooth and smooth quality of the wall to prevent the second rework, greatly enhance the corporate image of the construction unit, by the industry's praise.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range