Single-side Climbing Bracket SCB180:
With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.
Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.
The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.
Characteristics:
◆ Economical and safe anchoring
The M30/D20 climbing cones have been designed especially for single-sided concreting using
SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still
fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.
◆ Stable and cost-effective for high loads
generous bracket spacings allow large-area formwork units with optimal utilization of the bearing
capacity. This leads to extremely economical solutions.
◆ Simple and flexible planning
With SCB180 single-sided climbing formwork, circular structures can also be concreted without
undergoing any large planning process. Even use on inclined walls is feasible without any special
measures because additional concrete loads or lifting forces can be safely transferred into the
structure.
- Q:The template supports how security issues are under the supervision notice
- You 1 1 rectification, and then follow the results of the rectification of the truth. You do not rectification, reply to the supervision will still give you back, or else people will not send a notice. Do a good job to do a good attitude, especially involved in security issues. Since the supervision issued to you is a security notice, that things are more serious. Now you are doing is: one by one in a regular manner in accordance with the requirements of the field rectification, rectification after the end of a written reply to close the notice.
- Q:What is a template for pulling bolts
- Tempered bolts are bolts that support the beam and column stencils for pulling the knot between the inside and outside of the wall. The lateral pressure and other loads of the bolts are supported by the bolts to ensure that the spacing between the inner and outer stencils meets the design requirements and is also the fulcrum of the template and its supporting structure. Therefore, the arrangement of the bolts has an effect on the integrity, stiffness and strength of the template structure Very big.
- Q:More than a certain size of the larger risk of the template works and support system which include
- Always looking at someone else to go to bargain-hunting that is difficult, others are very HIGH when you do not HIGH, the results of the market start, you unconsciously. Baidu search
- Q:What is the meaning of the template bearing surface elevation in the bridge specification?
- There is a pre-camber or pre-elevation between the bridge base elevation and the design elevation, since the template is not stressed before the concrete is poured,
- Q:Reinforced concrete shear wall is supported by the use of prefabricated concrete strips as a support on both sides of the template, the country is allowed to use
- Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.
- Q:Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
- Sweeper: part of the scaffolding project, the sweeping pole is 200mm from the ground, the horizontal bar connecting the base of the pole. Divided into vertical and horizontal sweeping pole, play a stable scaffolding effect. Vertical sweeping rods: sweeping rods arranged longitudinally along the scaffolding; horizontal sweeping rods: sweeping rods arranged horizontally along the scaffolding; lateral sweeping rods are passed under the longitudinal sweeping rods and passed through the lateral sweeps to the base.
- Q:How is the identification of tall template works?
- [2009] No. 87 provides more than 5 meters of the template support project for the more dangerous sub-project, more than 8 meters for more than a certain size of the larger dangerous sub-project.
- Q:Scaffolding structure template support frame type
- Fastener, bowl button and door steel scaffold material can be used to construct the template support frame, and have their own characteristics. According to their structure can be classified as follows: (1) by type of structure 1) pillar support frame (pillar bearing structure);
- Q:In addition, for example, in the 30-meter-high pier body pouring continuous beam 0 # block, beam 0 # block can be used to support the bracket (usually block 0 block will be surrounded by the entire pier), but 30 meters high Of the scaffolding if not connected with the bracket, then what is the way to make the stability of scaffolding requirements? Is it only anchoring? Please master answer.
- Scaffolding specification is JGJ130-2010 "construction of fasteners steel scaffold safety technical specifications." Scaffolding structure, the principle of calculation is self-contained bearing capacity, stable system; template bracket specification is JGJ162-2008 "building construction template safety technical specifications", also self-independent load capacity, stable system.
- Q:How to use template support?
- This picture is marked on the non-adjustable support, and now generally use adjustable height support.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single-Side Climbing Bracket SCB180 formwork system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products