Product Description:

Single-side Climbing Bracket SCB180

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Template support did not stand good, how to remedy the lower floor?
First measured how much sink ah, the plate elevation measured first, and then find the design, such a thing is not you can decide, the design may be looking for experts, if the lower 10 to cm it does not matter. But also the size of the kanban, if you say 4 * 4 little problem.
Q:Why can not the scaffolding stand with the stent?
The use of pier body construction rod hole, so that scaffolding and pier body consolidation, improve stability
Q:Foundry boutique building foundation · New type of shear wall template support
As the use of cold rolled steel products, coupled with the surface of the electrophoretic paint treatment (a car primer), greatly extending the service life of the support system, the number of turns in more than 300 times to solve the wooden side of the high cost problem. Cold rolled steel performance is corrosion resistance, flexibility, high pressure. So after wearing a wall screw and cross pad fixed, not like the side of the wood as a result of the thermal expansion and contraction of the weather, directly to ensure the shear wall and the cylinder flatness and safety. The best treatment of the new support system is the corner and the mouth of the deal, yin and yang angle and the design of the card to solve the traditional shear wall support system problems, while ensuring the degree of flute and angle, put an end to the corner leakage Pulp running pulp phenomenon.
Q:How long does the width of the template support more than how much height the beam can not be poured at the same time?
Tool-based template works: including sliding mode, climbing mold, flying mold works. Concrete template support works: erect height of 8m and above; erection span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above.
Q:Building template support system force calculation?
Newly poured concrete evenly on the plywood, the unit width of the panel can be regarded as beams, times the keel as a beam fulcrum by three consecutive considerations, the beam width of 200mm
Q:Bridge template support bowl button steel pipe scaffolding, need to set sweeping pole?
Scaffolding must be set to vertical and horizontal sweepers. Longitudinal sweeping pole should be fixed at right angles to the base of the epithelium is not greater than 200mm on the pole, the horizontal sweep pole should also be used at right angle fasteners fixed in the vertical under the pole on the pole. When the base of the pole is not at the same height, the height of the longitudinal sweeping pole must be extended to the lower span of the two spans and the pole fixed, the height difference should not be greater than 1M. The distance from the pole shaft above the slope to the slope should not be less than 500mm.
Q:New shear wall template support
The new Shear Wall Templates supports us to provide a full range of services. Before you order, we will customize a reasonable construction plan, product usage, and what products for each wall Amount, will help you count.
Q:How is the identification of tall template works?
[2009] No. 87 provides more than 5 meters of the template support project for the more dangerous sub-project, more than 8 meters for more than a certain size of the larger dangerous sub-project.
Q:Template support product features
Keel tight and flexible connection not only easy to operate, but also a solid structure. The freely stretchable keel allows you to adapt to any size. The clever self-locking of the column and keel is not only simple but also firmer.
Q:How to use template support?
Can be linked to this person. This is Shengchuan building materials manufacturers

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range