Single-side Climbing Bracket SCB180 formwork and scaffolding system

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Single-side Climbing Bracket SCB180:

With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are

transferred through the brackets by means of V-strongbacks and compression braces into the

scaffold anchors.

Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and

bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket

requires only a minimum of space.


Characteristics:

◆ Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still

fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

◆ Stable and cost-effective for high loads

generous bracket spacings allow large-area formwork units with optimal utilization of the bearing

capacity. This leads to extremely economical solutions.

◆ Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without

undergoing any large planning process. Even use on inclined walls is feasible without any special

measures because additional concrete loads or lifting forces can be safely transferred into the

structure.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The template supports how security issues are under the supervision notice
You 1 1 rectification, and then follow the results of the rectification of the truth. You do not rectification, reply to the supervision will still give you back, or else people will not send a notice. Do a good job to do a good attitude, especially involved in security issues. Since the supervision issued to you is a security notice, that things are more serious. Now you are doing is: one by one in a regular manner in accordance with the requirements of the field rectification, rectification after the end of a written reply to close the notice.
Q:How is the identification of tall template works?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:Foundry boutique building foundation · New type of shear wall template support
As the use of cold rolled steel products, coupled with the surface of the electrophoretic paint treatment (a car primer), greatly extending the service life of the support system, the number of turns in more than 300 times to solve the wooden side of the high cost problem. Cold rolled steel performance is corrosion resistance, flexibility, high pressure. So after wearing a wall screw and cross pad fixed, not like the side of the wood as a result of the thermal expansion and contraction of the weather, directly to ensure the shear wall and the cylinder flatness and safety. The best treatment of the new support system is the corner and the mouth of the deal, yin and yang angle and the design of the card to solve the traditional shear wall support system problems, while ensuring the degree of flute and angle, put an end to the corner leakage Pulp running pulp phenomenon.
Q:How to use template support?
This picture is marked on the non-adjustable support, and now generally use adjustable height support.
Q:Main and vice keel upgrade modification - the new building template support birth opportunity
Deputy keel directly on the main keel, and the use of the same method of wood, easy to operate. The vice keel is designed for opening, reducing the weight, reducing your costs, and facilitating connection to the template when the bearing capacity is allowed
Q:What is the difference between a full-screen stent and a floor-mounted stent?
Full-scale scaffolding can be a template support frame, but the template support frame is not necessarily full of scaffolding. Such as the roof beam template support frame is full of scaffolding, but the pillar of the template support frame may not be full of scaffolding. Full-scale scaffolding can be easy to operate the platform, more for the roof beam template support
Q:How long does the width of the template support more than how much height the beam can not be poured at the same time?
Tool-based template works: including sliding mode, climbing mold, flying mold works. Concrete template support works: erect height of 8m and above; erection span of 18m and above; construction of the total load of 15kN / m2 and above; concentration line load 20kN / m and above.
Q:After the pouring with the template removed and then how to support
Do not remove the template, but in the template design and erection must be considered in the post-pouring stand alone erection in order to facilitate the future beam, board concrete to a certain strength after the other full scaffolding removed, leaving the part of the back with the template and support. (Theoretically requires beams and plates of concrete strength to reach 100% to be removed). So that the support design of the post-pouring zone takes into account that the value of the load must meet the requirements of this part to support the independent composite and take the necessary observation and maintenance measures for the template and support. This approach allows the concrete at the post- The template is disturbed, resulting in adverse damage to the structural requirements of the bad.
Q:Template Support System Safety Control
Strengthen construction management. Including the strengthening of the template support system technology management and security management. Template support system should be designed after the first construction. Strictly in accordance with the template design technical program to operate, are not allowed to change, if there are problems, must be approved by the template designer or by the technical director at the approval of a higher level before proceeding. Steel pipe should be checked before use, excessive deformation and serious wear and tear of the steel pipe shall not be used.
Q:How to calculate the bearing capacity of the template support
(Static load + dynamic load) * safety factor = construction load. A fastener carrying 3 tons.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range