• Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for  Delivery Water System 1
  • Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for  Delivery Water System 2
Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for  Delivery Water

Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for Delivery Water

Ref Price:
get latest price
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
10 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Sampling Cooler/ Enfriador de Muestros/ Cooler for Samples for  Delivery Water

Applications:

Sampling cooler is used for boiler room or soda assay sample cooling

 power station, the water in the boiler and heating system mostly 

higher temperature, and high temperature is not convenient to 

sampling, also not easy to determine, in the sample should be cool,

so let's introduce the sample of sampling point sampling cooler for 

cooling, general requirements to ensure traffic in the 500-700 ml/min, 

the sample can take a 30 to 40 degrees cold, satisfy the People's 

Republic of China power industry standard DL/T 457-457.


Features:

Sampling tubes adopt stainless steel tube, can not use carbon steel or 

brass tube, in order to avoid the sample is in the process of sampling

tube of metal corrosion products pollution.
Sampling cooler is suitable for the high temperature of the liquid and 

gas media such as sampling, has a compact structure, high heat transfer

efficiency, convenient washing, long service life, etc.

Types of sampling

1. Boiler water sampling

2. Feeding Water sampling

3. Delivery water sampling
Water sampling points on general in the exit of the condensate pump,

the condensate pipeline, should not be installed in the entrance of the 

condensate pump, because of the entrance of the condensate pump 

pressure below atmospheric pressure.
4. The hydrophobic sampling
Hydrophobic general sampling in the drain tank.Sampling points are usually 

located in around 300 mm from the bottom of the drain tank.
Samples by sampling cooler, 5 will steam condenses into water.Steam in the sampler 

flow generally for 20 to 30 kg/h.Demand for sample which leads to the catheter and 

cooler, the same as the water sampling.

FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy 

steel,is one of the large-scale professional investment casting production bases in China,

consisting of both casting foundry forging and machining factory. Annually more 

than 8000 tons Precision casting and forging parts are exported to markets in Europe,

America and Japan. OEM casting and forging service available according to customer’s requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link 

from raw material to final product we have strict quality test;We resolutely put an 

end to unqualified products flowing into the market. At the same time, we will provide 

necessary follow-up service assurance.




Q:I'm a physics students and often come up with seemingly stupid questions I can't really find an answer to. If the human body acts as a resistor of around 100 kilo-ohms or more, how is it that I could die by grounding myself with the hot terminal of an electrical outlet?I understand that the average current flowing through me is the product of RMS-voltage over resistancebut this value doesn't seem NEARLY high enough to do any damage much less for me to detect.Thanks!
Mr. C. has an excellent answer. I might also add that as an electrical worker I find it very important to make sure that when I work with electrical circuits and safety equipment that I try and eliminate a flow path from live to ground that can pass through my heart area. We always use safety equipment and follow procedure but at times you have no choice but to get very close to energized exposed circuits. They can and do bite. I have been known to take an extra step and insulate exposed energized areas that are near my legs when I am working with energized circuits above my waist.
Q:can i sell magnetic contactor transformer 24vand where ?
I sell my old, worn out sneakers on OKorder. I try not to think about what the buyers are doing with them. I never touch Craigslist. If I sold something there, I'd expect the buyer to show up, cut my throat and take the item.
Q:I plan on starting college next September to study electrical electronic engineering, it's three years in college then moving onto university. In college I would be B Tech qualified and the awarding body is EAL. Is B Tech qualification good ?What Qualifications will I get out of university ?What's the difference between BEng and MEng ? Could an Electrical Engineer work on oil rigs ?
It all depends on what you mean by electrical engineer. Do you mean someone who is hands on and performs wiring, repairs and installation, etc. or someone who sits mainly at a desk and designs electrical systems. If you mean the latter the the MEng is the golden standard qualification to enter into this career. However systems designers would be office / lab based and would be unlikely to get offshore. If you mean the former then a vocational HNC, preferably done as part of a modern apprenticeship would be the way to go. With this kind of route you could eventually work offshore repairing / maintaining equipment, however you would need to start at the bottom in an onshore industry sector and build up skills and experience before you could work offshore.
Q:An example of something would be one light flashes and another light goes off. Or Lights that are already on, turn off, another one turns on, and lights flash, then the whole process repeats itself again after a while.
A clock driven multi-pole programable time switch. They come in both mechanical and solid state flavors.
Q:At hwy 5 and 380 there is a bunch of large trailers,cars, and production equipment. What is being filmed there?
I am so glad someone was able to get the info. Well I guess no Bill Smith's in the morning. Thanks for the info.
Q:1. what is electrical and wiring system?2. what are the factors to be considered in designing an electrical wiring system in buildings?3. what are the possible ways of saving energy when designing an electrical and wiring system in buildings?i just need the experts opinion about this.thanks!
A building electrical system includes all of the equipment and wiring designed by the electrical engineer. This begins at the utility power connection and includes the service entrance equipment (meter base, current transformer cabinet and main disconnect switch), a main distribution panel (main breaker panel or main switchboard), and branch circuit distribution panels. The electrical system includes all wiring from the connection to utility power to connections to all electrical utilization of equipment. The electrical system also includes building lighting and lighting controls, building premise wiring for computers, computer hub room equipment, security systems, public address/broadcast system, keyless entry system, fire alarm system, and standby and emergency power systems. The main factors to consider is square footage of building, type of occupancy, number of occupants, and applicable local codes, the number of floors in the building, location of exits and stairwells. These considerations are used especially in determining what voltage with which to serve the building and size (ampacity) of service entrance and main distribution panel. These statistics are also important in the design of the fire alarm system. The main ways to save energy is through use of occupancy sensors and daylighting controls for lighting (the latter assumes windows or skylights for introducing daylight). These controls will keep the lights off unless specific areas are occupied, and lighting along with HVAC are the largest electrical loads. Energy costs (both electricity and heating fuel) can often be significantly reduced by incorporating CO2 sensors and variable frequency drives to control air handlers (large fans) rather then running them continuously at a rate to support maximum building occupancy, as is the case in many buildings.
Q:I am doing some work and i just couldn't remember the piece of equipment, that hospitals use to bring people back to life by using an electric shockThey have Pads on them and are often used in films.Thankyou in advance,Babyx
AED : automatic external defibrillator
Q:I haven't worked in this field in the UK, although I am able to diagnose problems, service and repair electrical equipment.
Look in the Phone-Book under 'electricians'. Your problem solving diagnostic skills, that you proclaim, are in serious question as your initiative is.
Q:1. Why is it important to keep this equipment free from excess oils and product build up? Many thanks :)
I can't find out if you don't say what equipment it is.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords