Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
MODEL | STANDARD | DX/CX6K | DX/CX 10K | DX/CX6KL | DX/CX10KL | |
CAPACITY | VA/W | 6KVA/4.8KW | 10KVA/8KW | 6KVA/4.8KW | 10KVA/7KW | |
INPUT | Nominal Voltage | 220/230/240VAC | ||||
Voltage Range | 120-275VAC | |||||
Frequency Range | 46-64Hz: 50Hz, 60Hz auto sense | |||||
Phase | Single phase with Ground | |||||
Power Factor | >=0.99 | |||||
OUTPUT | Voltage | 220/230/240*(1±1%)VAC | ||||
Frequency | 50/60Hz(Adjustable)
50Hz AC Mode: Follow AC Mode (AC Range 46~54Hz); Battery Mode: 50Hz(1±0.1%) 60Hz AC Mode: Follow AC Mode (AC Range56~64Hz); Battery Mode: 60Hz(1±0.1%)
| |||||
Wave Form | Pure Sine Wave | |||||
Power Factor | 0.8 | |||||
Harmonic Distortion | =<2% THD (Linear Load), =<6% THD (Non-Linear Load) | |||||
Overload Capacity | Normal when load < 105%; 105%-125% for 1 min, 125%-150% for 30sec | |||||
Current Crest Ratio | 3:1 | |||||
Connections | Terminal block | |||||
Efficiency | To AC Mode | 88% | ||||
To Battery Mode | up to 90% | |||||
Battery | Type | Sealed free maintenance lead acid battery | ||||
Nominal DC voltage | Built in batteries 12v7.2ah*16pcs | 192VDC | 192VDC | |||
Quantity | 16pcs | 16pcs | Depends on requested back-up time | Depends on requested back-up time | ||
Back-up Time (Full load) | >=7 min | >=5 min | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | ||
Recharge Time | 7 hours to 90% | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | |||
Charge current(MAX) | 2.0A | 4.2A or 8A | 4.2A or 8A | |||
Charge voltage | 220Vdc ± 1% | |||||
Bypass | Automatic Transfer | On overload and UPS failure | ||||
Before UPS Power-on | Default "ON" user adjustable to "YES" | |||||
Transfer Time |
| Zero | ||||
Indicators | LCD Display | UPS status, I/P & O/P voltage& frequency, Battery voltage, Battery capacity, Loading, Fault code | ||||
Audible Alarm |
| Bypass, On battery mode, Battery low, Overload, Fault | ||||
Acoustic noise | At 1 meter distance | <55dB | ||||
Communications | Intelligent RS232 serial port | Windows 98/NT/2000/XP/2003, Linux, Sun Solaris, IBM Aix, Compaq True64, SGI IRIX, FreeBSD, HP-UX, and MAC | ||||
SNMP (Optional) | Power management from SNMP manager and web browser | |||||
USB (Optional) | Windows family software and Mac OS | |||||
Environmental | Operating Temperature | 0~40 °C | ||||
Operating Humidity | 20~90% ( Non Condensing) | |||||
Weight | Net weight (kg) | 84 | 93 | 35 | 38 | 35 |
UPS Dimension | L*W*H (mm) | 570*260*717 |
- Q:Power and lighting transformers, lighting quality will be affected much?
- Corresponding to the transformer power supply, in order to save costs and reduce costs, the choice of AC ignition method is better. Pure resistive load, the power factor is 1. The 3 *100W=300W is the capacity of the required transformer
- Q:Why can't autotransformer be used as transformer for safety lighting?
- The transformer of the lighting circuit is a step-down transformer (general input 10kv., 220V). The first coil of the autotransformer is shared and connected together
- Q:Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- If the transformer is not calculated, the loss is the same. If the calculation is the latter, save electricity.
- Q:1000 square meters low voltage.36 volts lighting power supply with multiple transformers and wires
- You must know the quantity and power of the lamp to determine the transformer
- Q:Why should lighting transformers be used in factories and mines?
- There are two cases. One is the general factories and mines, and the low voltage is three-phase four wire system, and the neutral point is directly grounded. Between the phase line and the zero line is 220V, which can be connected with the illumination load.
- Q:Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- The transformer that power supply company manages, it is to supply motive power and illumination generally, namely the lighting transformer that does not have special illumination to illuminate. Units of their own transformers, is generally the case. The utility model has the advantages that the transformer and other equipment can be fully utilized, the efficiency is high, and the external power supply circuit does not need to be divided into power transmission lines and lighting circuits, and is simple and orderly, and the cost is low. As for the price of electricity, it is usually negotiated a power and lighting each percentage of the electricity to calculate and receive.
- Q:How many can you bring with 220V? How many can you bring with 380V? There are 3 terminals on the transformer. There are 220V, 380V, 0, three terminals. 220V is the 220V terminal and the 0 connection. How can the 380V be connected? Is it 380V and 0 or 380V and 220V?
- Connect 220V method, FireWire 220V terminal, zero line 0 terminal, 380V terminal is not connected.Connect 380V method, A phase 380V terminal, B phase 0 terminal, 220V terminal is not connected.
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- The previous elevator hoistway lighting required the 36V safety voltage, and you can see how many power lamps are required for the hoistway, and select the transformer
- Q:The difference between lighting transformers and control transformers
- A control transformer is a low voltage appliance, usually used as a power supply or part of a lighting for the control of electrical equipment such as machine tools. There are usually two different voltage outputs,
- Q:Why the 21 lighting transformer must double winding type safety isolating transformers, prohibited the use of autotransformer.
- A set of coils in a autotransformer having one tap that does not function as a barrier. Or, the two sets of coils are attached.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords