Aluminium Heat Sink
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton pc
- Supply Capability:
- 1200 Tons per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Features:
1)Material : 6063 6061 6060 and different aluminium alloy
2)Status:T4 T5 T6 or other special status
3)Surface treatment: mill finish, anodized sliver ,anodized bronze, anodized champagne, anodized black pearl, various power coating color, electrostatic sliver, electrostatic champagne, electrostatic golden, electrostatic titanium , machine polish sliver, machine polish bronze, wooden grain color, and Fluorocarbon spraying.
4)Annual capacity : 120000TON
5)Quality : China Nation Standard GB/T 5237 2004 (advanced class)
6)Use: can be widely using aluminium window, door, curtain wall, hand railing , normal aluminium profile, decorative and industrial aluminium profile
7)Advantage: Famous Brand reasonable&market price, soonest delivery and good after sale- service
8)Type of package:protection foam+heat contracted plastic film. / wooden packing / Metal pallet or depand on clientspecial requirement.
9)Payment term:T/T:30% of total value as deposite should paid by T/T within 3 days when confirmation ,and the remaining sum should be paid by T/T before delivery.L/C: 100% at sight
10)Delivery Day: 15-30days
- Q:How many power illuminator can 5Kva 36V transformer drive?
- By formula: P=UI COSAThat is, the transformer capacity is S=UI=5KVAHow big is the COSA?. Look, what kind of illuminator do you use?. Usually take 0.8-0.9It can be calculated that P is about 4KW-4.5KW (general lighting)
- Q:Power and lighting transformers, lighting quality will be affected much?
- Corresponding to the transformer power supply, in order to save costs and reduce costs, the choice of AC ignition method is better. Pure resistive load, the power factor is 1. The 3 *100W=300W is the capacity of the required transformer
- Q:Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- If the transformer is not calculated, the loss is the same. If the calculation is the latter, save electricity.
- Q:Is the substation separate from the power and illumination transformer?
- The power and lighting power supply in the substation need not be separated. In a large capacity power plant, the lighting can be electrically powered to ensure that the generator is stopped. The lighting source is often separated from the lighting transformer and powered by other power supplies.
- Q:The transformer zero line has broken, has the result to the household illumination circuit?
- No, the zero line of the transformer doesn't go through the zero line of the transformer. It is a star connection, and the center point is zero line
- Q:3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- The bulb is used in the two luminescence tube combined type lamp holder, the calculation process is very complex. Different combinations, the secondary voltage is different. Because it is a DC ignition, but also consider the efficiency of rectification, but the total power is constant.
- Q:Who knows how big transformers and lines the 36V transformer uses in lighting?
- The sectional area of the wire can be calculated according to the electric power formula. The current required by the wire is calculated, and then the reference to the national standard "500 volt copper core insulated wire, long term continuous load allowable ampacity meter" is selected.
- Q:How is the lighting power of the 380V transformer calculated?
- Special transformer power transformer (electric furnace transformer, rectifier transformer, power frequency test transformer, voltage regulator, transformer, audio, mine variable frequency transformers, high frequency transformer, transformer, instrument transformer, impact power transformer, reactor, mutual inductor etc.) circuit with T symbol number. For example: T01, T201 etc.
- Q:What transformer can be used in a safety voltage lighting transformer?
- 220V/36V or 24V isolation transformer. Double winding, high and low voltage coils, not connected.
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- The previous elevator hoistway lighting required the 36V safety voltage, and you can see how many power lamps are required for the hoistway, and select the transformer
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2001 |
Annual Output Value | Above US$100 Million |
Main Markets | South America 0.59% Eastern Europe 0.38% Southeast Asia 0.50% Africa 3.30% Oceania 0.07% Mid East 0.50% Eastern Asia 0.62% Western Europe 0.50% Southern Europe 0.27% South Asia 0.75% Domestic Market 92.52% |
Company Certifications | Guangdong Well-known Brand; Guangdong Famous Trademark Certificate; Tax Payment exxceed 10 million RMB/y; ISO9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Guangzhou |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | |
b)Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range | High and/or Average |
Send your message to us
Aluminium Heat Sink
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Ton pc
- Supply Capability:
- 1200 Tons per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords