Inflatable Tarpaulin

Ref Price:
Loading Port:
Wuhan
Payment Terms:
TT or LC
Min Order Qty:
5000 Meter m²
Supply Capability:
20 Container Per Month m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PVC inflatable tarpaulin, as raw material for inflatable airtight pool for games& swimming in differeent size and style, for inflatable tent for tempeory shelter etc, is characterized by high tensile strength, waterproof, anti-UV treatment, flame ristance etc. It's very strong material which could work several years.

 

Specifications of PVC  inflatable tarpaulin:

 Inflatable Tarpaulin


Package of PVC inflatable Tarpaulin: Each roll of  PVC inflatable tarpaulin is wrapped with kraft paper or packed in paper tube.

 

Workshop of PVC inflatable tarpaulin:
 Inflatable Tarpaulin

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you need a cushion for roof waterproofing?
Roofing layer of leveling layer is usually used 20mm thick 1: 2.5 cement mortar. The leveling layer may be made directly on the structural concrete surface, or it may be made on the insulation layer and is provided for the construction of the waterproof material.
Q:Maintenance time of the cushion on the roof of the building
Concrete watering maintenance time: the use of Portland cement, ordinary Portland cement or slag Portland cement mixed with concrete, not less than 7d;
Q:Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q:Roof waterproof mattress should play the number of centimeters appropriate
Roof waterproofing can not use a single waterproof material, must be rigid and flexible combination of construction, flexible waterproof stretch is good, a little bit of settlement or deformation will not damage the waterproof layer. Rigid waterproof (ie mortar waterproofing agent) waterproof at the same time, can play a protective role, waterproof layer is not easy to be destroyed.
Q:What is the relationship between the cushion and the ring beam?
Cushion is plain concrete or asphalt concrete (for groundwater soil corrosive strong site). Is located below the ground, in order to prevent the foundation or the concrete beam pouring when the excessive loss of water caused by defects set. The purpose is to ensure the quality of concrete, increase the durability of underground components
Q:Why do the basics of the cushion waterproofing
The general basis of the foundation, the bar base is not necessary to do, like a raft in the basement, it is necessary to prevent the water from dipping into the basement (so the basement design may have to do anti-floating calculations). Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q:What is the difference between leveling and cushion?
Cushion, the base material is not divided into materials at the same time, the design will be described. Material is the same concrete, the greater than 20CM calculated basis, less than, equal to 20CM calculated cushion. Leveling layer refers to the original structure due to the existence of uneven or slope and the laying of the base layer, is conducive to laying the surface layer or waterproof, insulation layer. The role is to play a leveling, looking for a slope or enhanced function.
Q:Foam concrete for the roof cushion generally do much bulk ah
Foam concrete density grade is generally 300-1800kg / m3, commonly used foam concrete density grade 300-1200 kg / m3,
Q:Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.
Q:The top floor made waterproof playing cushion layer of how to do
2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.

1. Manufacturer Overview

Location Hubei,China
Year Established 1990
Annual Output Value Above US$100 Million
Main Markets
Company Certifications ISO9001 Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Wuhan
Export Percentage 31% - 40%
No.of Employees in Trade Department 15 People
Language Spoken: English;Chinese
b)Factory Information  
Factory Size: 10,000 square meters
No. of Production Lines 5
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range High;Average