HUAXIA TOWER CRANE QTZ160

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
6 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Brief Introduction
QTZ160 Tower Crane is a new type of large tower crane for construction developed through adopting technology by Shandong Huaxia Group in 2000. During designing, general operations like limited meta count of steel structure parts, parameter optimization of entire crane, stability check of entire crane and choice of each mechanism, etc. are completed with computerized tower crane design platform, which has reached international leading level.
Max. hoisting moment of QTZ160 (6516) Tower Crane is 1940kn/m, and each index of performance occupies leading position among domestic products of the same grade. Its advantages are as follows:

  1. Hoisting arm can reach 65m, which largely increases covering area, and its working scope can satisfy constructions of more than two buildings simultaneously.

  2. It has many working modes with largest application range.

Groundwork is poured on the ground without under frame, and tower crane is fixed directly on the groundwork. This method makes tower crane spare groundwork section and crossing girder, and separate working height of tower crane is 46.2m under such condition.
If construction object is high, tower crane can adopt attaching mode, and hoisting height can reach 161-200m. If it is required to be higher under special conditions, please contact our company.
No matter which kind of mode is adopted, hoisting arm has lengths of 55m, 60m and 65m, which can be chosen according to different objects.

  1. It adopts hydraulic hoisting system to increase or reduce standard sections, which makes height of tower crane rise or fall according to height of construction to adapt construction of different buildings.

  2. Working speed is high, timing performance is good, and working efficiency is high.

Hoisting mechanism adopts double speed double pulley winding motor to realize low speed on heavy load and high speed on light load, and max. speed can reach 100m/minute. Start and brake are steady, impact is small, and operation is convenient. Swing mechanism adopts domestically advanced frequency conversion timing project, which makes start and brake become steady and reliable.

  1. Horizontal Arm Frame and Trolley Radius

The tower crane adopts horizontal arm frame, load is hung in hoisting trolley, and radius is realized through horizontal movement of trolley on arm frame. Compared with luffing jib tower crane, working is steady, installation is convenient, and radius application is wide, which can make hoisting performance be fully exerted, enlarge storing range of construction materials, and make disposal of general construction ichnography be convenient.

  1. Safety devices are complete, and there are brakes fixed in each mechanism, which can ensure working safety. There are safety protecting devices like hoisting height restrictor, trolley radius restrictor, moment restrictor, hoisting weight restrictor and swing restrictor, etc. fixed in tower crane.

  2. Driving room is set separately on side with good field of vision and large working space, which create better working environment for operator.

  3. Operation is convenient, and maintaining is simple.

Electric control system adopts domestically advanced PLC control with automatic malfunction judgment, overload and over moment safety chain protection, motor overtime protection, program controller of famous Japan Mitsubishi Company, transducer of Japan Yaskawa Company, relay of OMR Company and contactors manufactured through introducing technology of TE Company, which makes its reliability be much higher than general electric control systems. It is safe and reliable with less malfunctions.
There is no central collector to avoid disadvantages of short circuit and creepage because of damp and make entrance and exit of driver be easy.
More than 2,800 employees and a countrywide production, sale and after service network ensures strategic advantage on production and design of products of Shandong Huaxia Group.
Products of Shandong Huaixa Group are the best choice for selecting construction equipments.
2.Structure Figure

3.Form of Hoisting Performance of QTZ160 (6516) Tower Crane


Scope R
(m)

Hoisting Weight Q (kg)

Arm Length of 55m

Arm Length of 60m

Arm Length of 65m

A = 2

A = 4

A = 2

A = 4

A = 2

A = 4

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 7 5 5
4 4 6 2
4 3 2 7
4 1 9 8
3 9 6 0
3 7 4 3
3 5 4 5
3 3 6 4
3 2 7 8
3 1 9 7
3 0 4 3
2 9 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 9 2 4
4 5 8 6
4 2 8 7
4 0 1 8
3 8 9 4
3 7 7 6
3 5 5 8
3 3 6 0
3 1 7 8
3 0 1 2
2 9 3 4
2 8 5 9
2 7 1 8
2 5 8 8
2 4 6 6
2 3 5 4
2 3 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 6 9 8
4 3 3 0
4 0 0 9
3 7 2 5
3 4 6 6
3 2 4 8
3 1 4 4
3 0 4 5
2 8 6 1
2 6 9 4
2 5 4 2
2 4 0 3
2 3 3 7
2 2 7 4 .
2 1 5 6
2 0 4 6
1 9 4 4
1 8 4 9
1 8 0 4
1 7 6 0
1 6 7 8
1 6 0 0

1 0 0 0 0
8 7 5 3
7 6 7 8
6 8 1 9
6 1 1 9
5 5 3 2
5 0 3 7
4613
4245
3924
3640
3381
3163
3059
2960
2776
2609
2457
2318
2252
2189
2071
1961
1859
1764
1719
1675
1593
1515

4. Main Technical Parameter


Working Level

Hoisting Mechanism

M5

Swing Mechanism

M5

Traction Mechanism

M4

Hoisting Height (m)

Ratio

Separate Fixed Type

Attached Type

a=2

46.2

161-200

a=4

46.2

100

Max. Hoisting Weight (t)

10

Scope

Max. Scope

65

Min. Scope

2.4

Hoisting Speed

Speed

Ratio

a=2

a=4

Hoisting Weight (t)

5

2.5

10

5

Speed (m/min)

50

100

25

50

Stable lowering-speed

Speed(m/min)

3

Motor Model

YZRSW280-4/8

Power (KW)

55

Rotate Speed (r/min)

1440/700

Swing Mechanism

Motor Model

YEJ132S-4B

Power (KW)

5.5×2

Swing Speed (r/min)

0-0.61

Rotate Speed (r/min)

1440

Form of Technical Performance

Traction
Mechanism

Motor Model

YZTDE180-4/8/24

Power (KW)

5/3.7/1.1

Speed (m/min)

58/29/9.5

Rotate Speed (r/min)

1440/690/210

Hoisting
Mechanism

Motor Model

Y132M-4

Power (KW)

7.5

Hoisting Speed (m/min)

0.4

Rotate Speed (r/min)

1440

Working Pressure (Mpa)

25

Crane Weight

Arm Length (m)

55

60

65

Balance Weight (t)

14.9

16.15

18.15

Total power (KW)

62

Working Environment Temperature (℃)

-20-40

5. Form of Main Metal Structure Components


Name

Figure

Main Material and Specification

Remark

Reinforced Section

Main Chord: Angle Iron 140×140×40 with seal board

Size: 1850×1850
Total Height: 2800

Standard Section

Main Chord: Angle Iron 140×140×40

Size: 1850×1850
Total Height: 2800

Hoisting Arm

Upper: Angle Iron 2<100×100×8
2<80×80×8

Space joist frame structure welded with V-iron and angle iron = 10 sections

Lower: Angle Iron 2<120×120×10
2<100×100×10
2<80×80×8

Balance Arm

Angle Iron
125×125×12
90×90×10

Space joist frame structure welded with V-iron and angle iron = 2 sections

Upper Rotating Platform

δ24 Steel Plate

Box Structure

Lower Rotating Platform

δ24 Steel Plate

Box Structure

Cover Frame

Angle Iron
125×125×12

Space joist structure for hoisting

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
I believe that electric trains and subways use series motors when DC motors are used because the series motor has a torque vs. speed curve that provides high torque at low speed and low torque at high speed. Since power is equal to torque times speed, that is essentially a constant power mode of operation. I believe that mode is selected because it results in a smaller and less expensive complement of power delivery equipment and more efficient operation. Although it has been many years since DC motors were used extensively for cranes, I believe that series motors were used more than other types for the same reasons stated above. However, compound or separately excited motors may have been used for better speed and torque control at low speeds. Except for heater fans in vehicles, I don't believe DC motors have ever been used much for fans. Today, permanent magnet DC motors are used for all of the little motors in vehicles including the radiator fan that was formerly belt driven by the engine. A permanent magnet motor is like a separately excited motor or a shunt motor. The optimum DC motor for a fan would probably be a shunt motor because a fan requires increasing torque as speed increases. Today, computers are cooled by brushless DC motors.
Q:when are these crane flys?mosqito hawks guna leave im still scared?
Could you speak in better English please?
Q:Does anyone know where I can order Sugar Crane to grow?
Crane? anyway,, if your store has those little pieces you can buy to eat? or if you know someone with canes,, you strip off the hard outer covering,, this has the seed buds,, plant these in 3 inches of soil and wait,, cane is slow growing!! if you google sugar cane growing or go to wikipedia you will find plenty of info google buy sugar cane seeds you will find sites to order!!
Q:When the tower crane is installed in the fertilizer tank,
When the tower crane is installed in the fertilizer tank, is the elevation of the upper surface of the tower crane foundation flat with the elevation of the bottom of the new building? Or lower than the trough mark
Q:How can we attract Sand Hill Cranes to our bird feeder?
I give them black sunflower oil seeds along with chicken seed as we have chickens and ducks, They have just started to come and I am thrilled as I watched them do their jumping, dance,and expanding their wings Just beautiful. I also gave them bread crumbs which they devoured!!
Q:Captain Kirk, TJ Hooker or Denny Crane?
I would like to have a man with Kirks body around but with a little of Danny Cranes reality personality. I don't know who TJ Hooker is and I don't think Willam Shatner played him. It sucks that shatner has let himself go like that. Such a shame compared to how he once looked.
Q:ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
Yes he is a Crane! It turned out that he is Alistair's son by Liz and not related to Whitney in any way because Liz and Eve are only step-sisters. LOL I do believe they stay in the Crane mansion now. It hasnt been made real clear but they are there quite often, even at bedtime / night time, and she is always there to talk to Teresa whenever the blackmailer scares her. Also, his birthday party last week was at the Crane mansion wasnt it? I think they stay there now that Alistair is no longer there.
Q:who has made a origami crane? how hard was it?
well I made an origami piece of trash, it looks JUST like a piece of screwed up paper that you get in those trash cans!!! It's so realistic. I'm v proud. But no.. no crane.. if I wanted one I'd get a real one thanks :D
Q:Mobile Cranes for Arctic usage?
this is not my area of study but i will give you something to consider. if you are looking for a large capacity crane for use on permafrost, you wont find one. the pressure placed on the permafrost by large weights will cause it to melt. anything that is heavy, like a house, will sink in the tundra just like it will in a swamp. for houses they excavate the foundation a build a giant wooden raft that the hose floats on. in ST Petersburg, Russians preferred a mix of reeds and slave laborers corpses's to build the raft. as long as the ground is not frozen there is somebody how makes what you want. if the ground is frozen, you will only find small machinery. best of luck ps dont look to hard. lots of diesel engines work great at sub-subfreezing temps.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
If an answer of -4 hours is expected, pl. excuse. The practical difficulties of the faster cranes are constraints - the loading to / unloading from any crane is tricky, time consuming are with practical problems. The ship. yard where it is angered, the type of the cargo also decide the swiftness of unloading ; so it is not simple ratio !

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range