Heavy steel structure for workshop

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Specifications
1) . Easy to install, fire proof, good insulation
2). Certification: ISO9001:2000, SGS Standard.

Steel Structure Warehouse:

1.The steel structure of the connection method: welding connection
2.Steel structure design common norms are as follows: "Steel Design Code" (GB50017-2003) Cold-formed steel structure technical specifications" (GB50018-2002) "Construction Quality Acceptance of Steel" (GB50205-2001) "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002) "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-98)
3.The characteristics of steel Light weight steel structure Higher reliability of steel work Steel anti-vibration (earthquake), impact and good Steel structure for a higher degree of industrialization Steel can be assembled quickly and accurately Large steel interior space Likely to cause sealing structure Steel corrosive Poor fire-resistant steel Recyclable steel shorter duration
4.Commonly used steel grades and performance of steel Carbon
structural steel: Q195, Q215, Q235, Q255, Q275, etc.
High-strength low-alloy structural steel Quality carbon structural steel and alloy structural steel Special purpose steel Product Feature Carport, House, Office, Shop, Toilet, Villa, Warehouse, Workshop, Plant Other Information
Products have been all over the country more than 20 provinces, municipalities and autonomous regions, and have been exported to Europe, North America, the Middle East, Africa, Asia and other countries and regions, the widespread use

Welcome to our factory, we assure that our products will satisfy your needs with designs, competitive performance price ratio and best services.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the advantages of steel structure houses?
With the development of urban construction and the increase of high-rise buildings, the development of steel structure in our country is very fast. As a kind of green environmental protection building, steel structure residence has been listed as the key project by the Ministry of construction. Especially in China's large and medium-sized city, more people and less land resources, and people to the residential density, green environment requirements more and more high, wide range of application of steel structure housing, is China's production of the inevitable result of the development of.
Q:What are the main steel structures in the steel structure and which are the secondary steel structures?
The secondary structure, or should be said that the subsidiary component, refers to the envelope of the purlin, door and window frame, generally attached with the main structure, the stress is simple and clear, the damage also has little effect
Q:What is pre assembled steel structure, what is called steel structure assembly?
In general, the components or components of each plate are assembled into a new component through the welding and riveting process
Q:What is the main component in the steel structure and what is the secondary component?
The main components mainly include steel beam, steel column, column support and roof horizontal support
Q:What documents do steel installers need to have?
Steel erection workers need at least welder certificate, electrician certificate and hoisting certificate.
Q:What is an assembled steel structure?
An assembly structure: a structure that assembles components in a special workshop and assembles the components at the construction site.Therefore, in accordance with this concept, the steel structure is assembly type, all components are processed in the factory, transported to the construction site for lifting
Q:Steel structure brush fire retardant coating per square meter kg?
The amount of fire retardant paint is determined according to the coating thickness of fire-resistant coating, and the indoor thin steel structure fire retardant coating: the fire resistance limit of 2.5 hours per square meter is 6kg. Fire resistance limit of fire resistance limit of fire resistance limit of 2 hours per square meter was 4.5kg for 1.5 hours the amount per square meter 2.5kg 1 hours the amount per square meter 1.5kg indoor ultra-thin fireproof coating for steel structure: the fire resistance limit of fire resistance limit of fire resistance limit of 2 hours of consumption per square meter 3.5kg 1.5 hours per square meter per hour amount 2.9kg 1 the amount of 1.6kg square meters of indoor thick fire retardant coating for steel structure, fire resistance limit of 3 hours per square meter was 23kg. 2..0 hours of fire resistance per square meter dosage of 14kg
Q:What is the difference between single Bangang structure and composite plate of steel structure
Single board is a single color steel plate, composite board in accordance with a variety of insulation materials, rock wool, glass fiber, foam materials, composite board insulation, sound insulation effect is good, the price gap is great,
Q:What is the steel structure XLT?
Is the diagonal brace.English letter steel structure repersentation respectively: WL refers to (roof) purlin; YC knee brace; ZLT refers to the direct XLT cable stays; stays; CG refers to the beam between the poles.
Q:What is meant by a steel structure? What's the explanation for the trouble?
The term "limb" in a steel structure is most commonly used in latticed columns, in which the section, section, or plate is commonly referred to as the "limb". Like the limbs of a man, at the periphery.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range