Heavy Equipment Dealer Topkit Tower Crane Parts

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our Heavy Equipment Dealer Topkit Tower Crane Parts:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Heavy Equipment Dealer Topkit Tower Crane Parts:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Heavy Equipment Dealer Topkit Tower Crane Parts:


ItemParameter
Free standing height (m)50.5
Max height with attachment (m)200
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 60m(t)2.4
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYZPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-5.5KW×2
Climbing speed(m/min)0.5
Counterweight(t)48m jib 54m jib60m jib
15.4517.8518.9
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Total power(KW)63
Cable type ( within 35 meters from site power source to lower electric box of tower crane )50mm2(3+2, 5 cores)
Startup voltage & current380V×95%=361V       219A
Rated working voltage & current380V/121A


Heavy Equipment Dealer Topkit Tower Crane PartsHeavy Equipment Dealer Topkit Tower Crane PartsHeavy Equipment Dealer Topkit Tower Crane Parts

Heavy Equipment Dealer Topkit Tower Crane Parts

Heavy Equipment Dealer Topkit Tower Crane Parts


Heavy Equipment Dealer Topkit Tower Crane Parts

FAQ Heavy Equipment Dealer Topkit Tower Crane Parts;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can you use a cymbal stand as a camera jib/crane?
The angle of the cymbal on the stand determines the amount of vibration being transferred to the stand. A cymbal on a boom arm verses a straight stand, a heavy tripod verses a lightweight base sounds drastically different. Boom stands can make some cymbals rumble. When boom cymbals stands are somewhat close to staight stands, arm placed close to 180 degree, the cymbal will rumble less.
Q:How do they get the construction cranes up the sides of buildings as they increase the height of the building?
Sometimes the structure of the crane is built onto using the crane itself, building itself into a box. Then the crane lifts itself to the higher level. This can be done many times.
Q:Stephen Crane?
Crane is noted for his early employment of naturalism, a literary style in which characters face realistically portrayed and often bleak circumstances, but Crane emphasized impressionistic imagery and biblical symbolism rather than graphic realism. Crane's realism, writes William Peden, is often more impressionistic than photographic; his interest in psychological probing, his innovations in technique and style, and his use of imagery, paradox and symbolism give much of his best work a romantic rather than a naturalistic quality. Both realism and symbolism, the two major directions of modern fiction, have their American beginnings in Crane's work.
Q:What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q:How much do you know about construction cranes??
that depends, what do u need to know
Q:Why are the rescue workers in turkey not using cranes to remove the debris of the earthquake? ?
Firstly, it can be damnable hard to move cranes through rubble filled streets, even assuming if such things happen to be readily available. Secondly, as the mess beneath the rubble is bound to be unstable, moving stuff off from the top can cause collapses further down. That danger can be lessened by working more slowly and carefully. I dont belive it is unsafe, if they are meticulous. Your belief is all well and good, but is it based on actual experience?
Q:what are Gantry cranes?
A okorder.com/
Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:How do you cheat on a crane game?
a partial cheat that i use is 1st looking to see which items are at least open enough to get 2nd when i start up i get to the item then to go the left and right of item and adjust which way i go then try to aim for the middle of the item wanted then there is an 80 % chance that i will get the item i am aiming for but some of those crane games are rigged to the point you have to go at least 2 or 3 times depending on what type items are on there because the crane arm looses strength especially if it is far away from the exit hole
Q:Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot.co.uk/20...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range