HDPE Geomembranes from Manufactory with High Quality

Ref Price:
$2.60 / m²
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
10000 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction of Geotextile

Good flexibility, permeability, filtration, sepatation and easy for construction.

Product Application 

CMAX Geotextile has excellent permeability, acquired, durablity, which can be widely used in railway, highway, movement hall, dams, hydraulic structures, hence hole, coastal shoal,reclamation, environmental protection and other projects.

The main products are Synthetic staple fibers needlepunched non woven geotextiles and slit and split film yarn woven geotextiles.

Product Advantages:

1. High flexibility, high waterproof coefficient

2. Could be used in the temperature of -70 ℃~110 ℃

3.Good stability, anti acid and alkalis,anti-erosion

4.High climate bearing ability, excellent in anti-aging

5.High tensile strength and elongation, can be used in bad geology and climate, especially be used in the soil uneven sedimentation

6.High friction coefficient

Product Specifications:

Weight: 100GSM-1500GSM 

length: 50m-100m 

width:1m-8m 

material:100%PET 

Packaging Details:pp woven bags or at your request

Delivery Detail:15 days

FAQ:

Q: What kind of payments does jenor support?

A: T/T, L/C, Cash are accepted.

Q: Do you charge for the samples? 

A: Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee during the next order. 

Q: Can you produce according to customers' design? 

A: Sure, we are professional manufacturer, OEM and ODM are both welcome.

HDPE Geomembranes from Manufactory with High Quality

HDPE Geomembranes from Manufactory with High Quality

HDPE Geomembranes from Manufactory with High Quality

HDPE Geomembranes from Manufactory with High Quality


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the coated paper cups?
What is the coated paper cups first, you should understand what is called the coated paper cups coating a layer of HDPE on the surface of the paper sprinkling is called the coated paper cups
Q:What are the differences of seepage-proof geomembrane and polypropylene fiber impervious geotextile?
The seepage-proof geomembrane is made of high density polyethylene by flat extrusion or blow molding. The white seepage-proof geomembrane is heated and covered with polypropylene fiber geotextile top and bottom which finally becomes polypropylene fiber impervious geotextile. It has a good extensibility and environmental resistance as well as better anti-seepage effect. The seepage-proof geomembrane is usually black or white HDPE.
Q:Which is better for ceramic film and organic film ?
Ceramic membrane is relatively better.
Q:Preparation of composite geomembrane precautions?
1, laying the ground to be flat, not allowed to have stones, bricks and hard objects, to avoid uneven subsidence, cracks, anti-seepage within the turf, roots have to clear. 2, composite geomembrane laying do not pull too tight, should leave a certain amount of expansion and contraction to adapt to the matrix deformation. 3, composite geomembrane construction can be embedded using embedded: cover thickness should not be less than 30cm, according to different circumstances, can also be used anchor nails fixed. 4, composite geomembrane laying in the filling, should avoid the stones, heavy objects directly hit the composite geomembrane, the best side of the construction, while laying, while covering the protective layer. 5, composite geomembrane lap should avoid the slope, preferably in the flat or embankment at the bottom. 6, composite geomembrane in the laying should avoid dragging, hard pull, to avoid sharp objects stabbed.
Q:Is electrothermal film heater good?
It is safe enough, my biggest worry is the service life of floor. If the room temperature increases in a short time, heat dissipation efficiency is certainly very fast, then the temperature difference will be huge, this is the heat transfer theory.
Q:What are the advantages using foil in construction?
Architectural glass film benefits include: 1, more economical. Both steel and transparent glass or colored glass paste heat reflective film than the replacement of heat-reflective glass to save 50% of the total cost, the remaining cases by analogy, for example: Original ordinary insulating glass were upgraded to a hollow heat-reflective coated glass or hollow Low-E coated glass paste after heat-reflective film or Low-E film. 2, more efficient. the window film is easy to operate, use of time shorter than changing a new window. 3, more environmentally friendly. Replace the window will produce large amounts of construction waste, transport and landfill costs will increase, and the glass film can be used both to heat and safety upgrades. But also to prevent indoor carpet, curtains, fabrics and paint fade, the effective protection of indoor furniture, computers and other office equipment, extending its life. 4, more secure. General insulation film also has some security enhancements, along with the clip (plastic) layer of glass fragments stick holding performance, its safety is better than glass, security professional security film stronger. 5, more healthy. Window film installation gel containing UV (ultraviolet) absorber, can block 98% -99% of UV rays. 6, more light. If you change a hollow glass, plus two glass hollow part of the total weight of the double or more, will greatly increase the building load.
Q:Reservoir, the dam foundation is weak, the dam earth membrane seepage control design, the geotechnical membrane in the dam before the need to extend long? Are there bases?
Geotechnical membrane in the dam before the need to save about 2 meters in order to be used for the use of geotechnical membrane anchorage ditch
Q:How to use geosynthetics impervious device?
1. Set pressure. Press the set button "back" and the button ">" after powering on the device. Press the button “+”and“--”, then set pressure. After that press the button "back" to save it. After setting the lower limit value, press the set button to exit. 2. Clear the time setting. Redo the test and continue pressing the "--" button. The time value will be reset to 0 after 10 seconds. Don't press the button during the working time. 3. Check the time. Press the "--" button. The time value accurate to seconds will be shown on the screen. After 30 seconds, pressure value will be shown on the screen again. 4. Adjust to zero. If the pressure setting can't return to zero when the device is powered on without being applied pressure, you can press the reset button once. If the device is under pressure, release the pressure before pressing the button. 5. Open water injection cover plate. Add pure water until the water tank is full. Apply pressure and open pressure regulating valve to let water flow to chassis of high pressure cabin until the water begins to overflow. 6. Put the sample on the net plane of water collectormanifold smoothly. Let the excess water drain away to ensure that there are no bubbles in sample clamping device. Close the perforated plate and fix the sample evenly.
Q:Is the sunscreen film on the balcony useful?
The curtains are suggested as they are more practical. The curtain is convenient as it can deal with such problems as ventilation and light shading. Although it can shade the light and do not occupy space, the film is not decorative.
Q:Geomembrane, HDPE film in the garbage disposal field when the application of what kind of thickness can choose? How to choose?
Urban construction of 1.5mm or GB of the two 2.0 .. The The The Please select the contact information according to the design see message

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range