Couplers Rebar Steel from Tianjin China Good Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Tianjin China Good Price

Couplers Rebar Steel from Tianjin China Good Price

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
I haven't had this piercing but i was thinking of getting one i do have an eyebrow ring and seven earrings in each ear and i use to have a tongue ring, your piercing cartilidge so it is going to sting shouldnt be too bad though for me my most painful piercing was my fourth earring hurt after that it wasnt too bad my seventh was a breeze i knew how to take care of it so that it would heal fast and not get infected. you have to daily sometimes twice a day clean it otherwise it gets infected and its been my exerpience that they get infected easy. the healing time for when you pierce cartilidge is twice that of when you pierce your lobe so about 8-12 weeks give or take as far as i know you have to be 18 to get one if your in the US (or 17 with parental consent) not sure what the age would be over in London as for reputable place most tatto parlors do piercings look for a clean place that sterlizes everything very important (again going on US standards) as for the cost not sure was 10 dollars for ear piercing at wal mart but for this kind of ear piercing i would guess 20-30 dollars cause its at leadt 50 for a eyebrow or tongue ring i know that. i hope this helps good luck
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:Industrial / scaffold piercings - pierced with rings?
Having one bar can definitely put a lot of pressure on the piercing but it's the best way to go about getting an industrial piercing. It can be a difficult piercing to heal is all. If you get two rings it is very likely that one will slightly migrate in angle and that is going to make it impossible to properly fit a bar through the two holes. Plus, 6-8 weeks would be WAY way way too early to change a cartilage piercing. Try 6-12 months. And an industrial will never reject simply because of the bar, it will reject if it was pierced incorrectly or on someone's ear that is not anatomically correct for the piercing. And I promise, from someone who has had helix piercings done with rings and with straight barbells as well as having one single barbell through my industrial your hair can get caught on them all. If the bar fits properly the balls should fit pretty snugly against your ear.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s
Q:Piercing question: How do I know what size industrial/scaffold bar to get?
Scaffold Bar
Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:What are the requirements for the construction of the scaffolding structure?
The scaffold structure is basically in the two-dimensional grid and a substantially two-dimensional outer grid connected grid, each of the included in the expected load conditions of scaffolding structure after long time has a bearing component of relatively stable strength. The anchor is connected with the support arm and has a first leg in the form of a bar or rod. The anchor may be aligned such that the first leg is substantially parallel to the longitudinal axis of the arm, and the distal end of the first leg extends beyond the arm. The structure of the scaffold also comprises one or more platforms, each platform is arranged between the two corresponding bearing bars of the inner and outer grid frames at the same height.
Q:How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range