Couplers Rebar Steel from Tianjin China Good Price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Tianjin China Good Price

Couplers Rebar Steel from Tianjin China Good Price

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
Q:Having problems with my scaffold/industrial piercing?
If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!
Q:how do i get rid of the lumps on my ear because of my scaffolding?
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:What is the service life of the mobile scaffolding accessories?
Hot galvanized mobile scaffolding accessories for a period of 10 years or so, the surface does not require maintenance, in use without any restrictions. However, the cost is high, the raw materials needed to be more complex.
Q:What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
depends how many times have i told you to get off?
Q:by scaffolding ?
It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range