• Construction Cup-Lock Scaffolding System in China System 1
  • Construction Cup-Lock Scaffolding System in China System 2
Construction Cup-Lock Scaffolding System in China

Construction Cup-Lock Scaffolding System in China

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


1. Strength bearing capacity: Stable and reliable structure, strength bearing capacity.

 

2. Safe and reliable: The adapter has the reliable self-locking ability when it is designed with considering the gravity and force of friction.

 

3. Less lost: There is not scattered coupler, it can be reduced the least for the component.

 

4. Less maintenance: It is connected without the bolted, there is no to maintain.

 

5. Easy to manage: Components are neatly stacked and manufactured standard, it’s easy to manage on site and satisfied with civilized construction requirements at same time.



3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering.


5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q:So I'm going to get a scaffold/industrial piercing, and I had a few questions:-does your ear have to be a special quot;shapequot;? Like I mean does you outer ear cartilage rim have to stick more so it can be pierced?My outer cartilage rim is a little flat but it still sticks up -Would this make my piercing reject?Thanks! :)))
You can still get the scaffold done, but it might not take to your body well. You also need to be careful of the piercer that you choose. If your piercer places the bar in the wrong place, it can cause keloids or stress bumps. This might also happen if you don't have the right ear. I got an industrial, and my piercer didn't seem to put the bar exactly where I wanted on one end. Although I took very good care of my piercing, and didn't put any stress on it, I still got a keloid on that side of the ear, and it wouldn't go away. A lot of my friends had beautiful industrials, and I couldn't figure out why mine looked the way I did until I did a little more research, and the keloid appeared because my piercer did not pierce my ear in the correct location. I had to remove the piercing for the keloid to disappear. This might happen to those who don't have ears that are fit for an industrial. If you do decide to get it, please don't mess with it (although it's hard not to). When you sleep, try cupping your hand over your ear so that you don't put pressure on the piercing. :-) If you don't know what side you'd like it on, get it on the side that you sleep on the least. You may get a bit of a stress bump around the piercing, but these tend to disappear once the piercing heals up.
Q:Bowl buckle scaffold can be used to support it
Look at the situation, the ground is not flat
Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
At the beginning of the Market Place chapter..it starts off with The grass plot before the jail, in Prison Lane, ona certain summer morning.... so that one is morning and in the summer and the last one....is probably in mid morning b/c its after a sermon and also..i think in the forest chapter it says something about it being in autumn *.*
Q:the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
When the axial force and bending moment of the corresponding substitution effect of general practical design expression in S, can be calculated using the design (see below). Generally, the effect of load calculation is used in the calculation formula, that is, there is no load partial factor in the formula.
Q:It's for my science assignment and I can't find the answer. Please help!! :)
It is a way of making a bone strong enough to support body weight without having to be solid heavy bone.
Q:Height in the number of scaffolding should be set up scissors
6 cross when the time is 45 degrees, across the 5 span of 50 degrees, across the 4 span of 60 degrees. The length of the connecting rod is required to overlap, the overlap length is not less than 1M, the use of three fasteners is evenly distributed, the end of the fastener is not less than 10CM.
Q:do u think i should, is it safe, will it hurt, how bad will it hurt, and what might happen.
its up to you if you want to do it or not.. its just as safe as a normal cartilage piercing but DO NOT get it done with a gun please as its really unsafe. if you get it numbed it doesn't hurt at all, just a bit of pressure. i had mine done and i didn't believe they'd done it as i didn't feel it. it is quite hard to heal, i've had it done for about 4 months and it still hurts a bit, but i recently got some zinc tablets and its made it loads better! needs to be cleaned regularly too. hope this helps, it'll look gorgeous if you do, make sure you aren't gonna regret it though because you are quite young.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords