Cup lock Scaffolding System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Name:
Cuplock Scaffolding System
Catagory:
Scaffolding System
Material:
Steel Q235/Q345
Surface:
Electro Galvanized/Painted/HDG
Size:
48.3*3.25MM
Process:
Casting, Forged, Pressed, Welding, etc
Component:
Top/Bottom Cup,Ledger Blade, Standard, Ledger, Bracket, etc
Advantage:
Durable, Stable, Skid-proof, Antirust
Application:
Highways/Subways, Bridges, Tunnels
Manufacturer:
OEM Service is Available

Packaging & Delivery

Packaging Detail:As the Requirment of Clients
Delivery Detail:20days

Specifications

Cuplock Scaffolding System
Material:Steel Q235
Surface:HDG/Painted/Galvanzied
Manufacturer
OEM

Product Description

CUP-LOCK is a multi-purpose system scaffold, suitable for access and formwork support in all types of construction of building & civil engineering projects. This complete galvanized system is probably the fastest and most-widely preferred scaffold system.

Name:  Cuplock Scaffolding System

Category: Scaffolding system

Material: Steel (Q235/Q345)

Size: 48.3*3.25mm

Surface: Electro Galvanized/Self Color/Painted/HDG

Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.

Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering

Advantage: Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle

Manufacturer: OEM service is available

Items or goods can be manufactured according to your standards.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for fastener type scaffolding? How to calculate
Scaffolding: generally used for the wall height of not more than 4m of the house.  In 1, the scaffold used in floor brick and painting construction. Due to the use of the process of the transfer of the construction site, the installation is more frequent, so its structure and size should be light and flexible and easy to install and disassemble.  2, there are many forms of scaffolding, according to its structure is divided into folding scaffolding and scaffolding scaffolding
Q:I am traveling to Buenos Aires in August. Are most of the major monuments under scaffolding now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q:He'd talk to all the people from his scaffold ~~~the laws were obsolete, a change they should demand~~~?
what?
Q:What is the difference between the bowl buckle scaffold and the fastener scaffold?
(4) cantilever scaffold: scaffold for installation or repair of cantilever work.(6) formwork support: a frame for supporting a template and a scaffold material.5 divided by the size of occlusion(1) open type scaffold: only with the work of the railing and the foot board, no other shelter facilities scaffolding.(2) partially enclosed scaffolding: Scaffolding with an area of less than 30%.(3) semi closed scaffolding: shield area of 30% to 70% of the scaffolding.(4) fully enclosed scaffold: scaffold with full length and full height along the outer side of the scaffold.(5) open type scaffold: scaffolding provided along the periphery of the building.(6) sealing ring type scaffold: scaffolding along the periphery of the building.
Q:When will the NYC's Guggenheim museum be free of that scaffolding?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:What are the hidden dangers of scaffolding
Collapse is the biggest hidden danger scaffolding. Countermeasures to prevent and prevent the collapse of the scaffold: 1 must not be "empirical" in the daily enterprise construction process, some enterprises use "empiricism", do not carry out specific accounting. Timberman no license, is still "empiricism", scaffolding system does not have a scientific guarantee, the collapse is inevitable. For steel scaffolding, should be in accordance with the "construction of steel tubular scaffold safety technical specifications" (JGJ1302001), for scaffolding, should be in accordance with the cuplok scaffolding component (GB24911-2010) and JGJ 166-2008 construction cuplok Scaffolding Safety Technical specification, the scaffolding should be in accordance with the "construction steel scaffolding safety technology standard" (JGJ 128-2010), other types of scaffolding should also refer to the relevant standard.
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
to check for loose parts/bolts/cables/etc caused by heavy winds and storms. Also, heavy rains can sometimes cause oxidation of certain cables which weaken the scaffolding structure over time
Q:Whom does Hester recognize in the crowd as she stands on the scaffold?
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q:Standard Specification for bowl type scaffold steel pipe diameter
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm
Q:Do scaffold piercings hurt?
Yes. It like someone pinching you for a short period of time

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range