Construction Electric Galvanized Cuplock Scaffolding for sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Construction Electric Galvanized Cuplock Scaffolding for sale


Quick Details

Place of Origin:

Tianjin China (Mainland)

Brand Name:

HTMX Cuplock scaffolding

Model Number:

HT-S / HT-SH

Material:

Q235

Certificate:

ISO9001:2008

Standard:

1500mm,1800mm,2000mm

Thickness:

3.0mm or 3.2mm

Surface finish:

Painting,galvanized

Pipe Size:

48mm

Colour:

orange,Silver

Package:

Bulk / Bundle / Pallet

Horizontal:

1000mm,1200mm,1500mm,2000mm

Accessory:

Cross brace






Packaging & Delivery

Packaging Detail:

In carton or in bag

Delivery Detail:

25 days

Construction Electric Galvanized Cuplock Scaffolding for sale

Construction Electric Galvanized Cuplock Scaffolding for sale



Detailed information

1. Material: Q235, Q255, Q345 

2. Surface treament: painting or  hot-dip galvanized  

3. Elements: vertical, ledger, diagonal, top cuo, bottom cup and ledger blade  

4. High strength bearing capacity  

5. OEM service  as available  

6. Inspection: by ourselves or by SGS,or B.V,or others.   

7. Samples are available 


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the cost of scaffolding
The majority of bridges and supporting the use of scaffolding is mostly subject construction of gate type scaffold floor scaffold use scaffolding, scaffolding pole of the vertical distance of 1.2-1.8m rail distance is 0.9-1.5m
Q:a 65 kg painter paints a side of a house while standing on a 5.5m long board w/c rests on a scaffold. the end?
good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!
Q:Can I remove scaffolding off my property?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:JGJ 130-2011 as well as the specification of woodworking scaffolding
Technical code for safety of JGJ 166-2008 construction bowl buckle steel tubular scaffold. Scan version, if you can leave the mailbox number, send you,
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
Do not know if there is no other norms on the bowl, it is this.The values of the carrying capacity are like those provided by the manufacturer.
Q:I want to get and industrial/scaffold, but...?
im think' in it can happen
Q:What are the horizontal spacing, vertical spacing and step distance of the vertical posts of the scaffold?
The pitch is called 'step', 1.2~1.35, 1.8m, no minimum spacing, maximum 1.8m. Vertical rod spacing 1.05, 1.3, 1.55m, no minimum spacing, maximum 1.55m. See JGJ130-2011 "technical code for safety of steel tubular scaffold with couplers in construction".
Q:What is a bowl buckle scaffold? What is the full house scaffolding?
2) in the scaffolding scaffolding in the interior of the building: in the end, each built a layer of the wall, it is transferred to a floor, a new layer of masonry, it can be used for external wall masonry construction and interior decoration. Scaffolding materials used less, but the assembly and disassembly frequently, it requires lightweight and flexible, easy assembly and disassembly. The structure of the folding type, pillar type and door frame, etc..
Q:Scaffold/Industrial piercing & healing?
it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range