CMAX Tower Crane TC6014 with SASO Certificate

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 60m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC6014      

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

 

 

To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the giant crane for in downtown Pittsburgh?
Get ready for the new tower.
Q:in crane hook which material is used?
Crane Hook Material
Q:how long do i have to work as a yardhand in oilfeild to become a crane operator?
You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
Q:1000 origami cranes?
They can be made of anything, and they can vary in size, so you're okay.
Q:how much does a whooping crane eat per day?
To figure out exactly how much they eat you would have to know the exact weight of the bird, the calories in the food, and the condition of the bird. Which is a very long way of saying that I don't know the answer to your question, but there is a mathematical way to figure it out if you are really interested.
Q:Thousand Cranes by Yasunari Kawabata?
It's been a while, but I believe the story is about a young girl who gets cancer, and sets about making 1,000 paper cranes for good luck, but she never made to completion. Just google to find info, or see if you can download the book.
Q:Origami Cranes, 999 or 1000?
It is susposed to be 1000 cranes. You string them in 10 sets of 10 cranes. [thats how I remember!]Can you send me your way of folding them? I can't find one that works right for me, they always turn out a little wrong. :[
Q:Which U.S. city has the most Tower Cranes working?
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.
Q:Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
the 1st answerer, Irv S, is right. You need to call a craning service. They should be able to give an estimate for crane size based on what you tell them. You will need to know what your Load weighs. How high in the air the crane will have to lift it. ....Putting a swimming pool in the back yard is completely different ....than putting that same swimming pool up on top of a 15 story ....building. How close to the Load can the crane park? Or how far you need the LOAD moved. What a crane can lift, even if it a 100 ton crane is based on how far the crane has to reach to pick up the load and how much the crane has to rotate to place the load. The angle the crane boom goes to, etc. Our 15 ton PH crane can lift 30 thousand pounds at 10 feet from the Turning center. And only a 1,000 pounds or less if the boom is fully extended with the Jib on, that is 125 feet away from the turning center of the crane. Distance is critical! They will probably need to see the work site to give a really accurate answer. Wingman
Q:How crane can hold huge counter weights? Why CG is not changing while adding counter weight on cranes?
Usually the counterweights can move back and forth on an arm. They are moved toward the crane when there is no load and away from the crane when there is a load. If the counterweights can't move, then the crane must be designed to hold (at least) the minimum counterweights in their fixed location. As the crane gets loaded, the net moment decreases, and then increases in the other direction as more and more load gets added. It is still likely that the maximum design moment when loaded far exceeds the moment due to the counterweights on an unloaded crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range