• CMAX Brand Building Hoist SC300/300 System 1
  • CMAX Brand Building Hoist SC300/300 System 2
  • CMAX Brand Building Hoist SC300/300 System 3
CMAX Brand Building Hoist SC300/300

CMAX Brand Building Hoist SC300/300

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Power Source:
Electricity
Maximum Lifting Weight:
3000
Maximum Lifting Height(M):
150M
Lift Speed:
0-96m/min

Description:


The tie-in is the linking part between guide rail and building, and to keep the stabilization of guide rail and the whole structure. And can adjust some size within a certain range. Install one suit of tie-in each 3-10.5m along the guide rail. But its strength must meet the force F calculated according to formula. We can afford different types of tie-in, such as,a, , b,a. Customer can choose any type according to their needs.

Because of the safety device, the building hoist can load people and materials safely. The hoist is equipped with gear cone drum progressive safety device.

The gear cone drum progressive safety device consists of: gear, centrifugal speed limiting device and cone drum brake. When the cage is over speed, the centrifugal block in the safety device overcomes the spring tension and brings the rotation of cone drum. The screw connected with the block screws and improves the friction of cone and shell. Thus makes the cage stop smoothly on the mast section, cut off the power supply and ensure the safety of person and equipment. The action speed of safety device has been adjusted and sealed when manufactured. Do not disassemble it.

 

Materials about Rack Gear

1.Model: 40*60*1508mm, or 40*60*1483mm or OEM according to drawing or sample

2.Materials: CL60 special rail steel,60# high quality carbon steel(common use)

or other type C55,C50,C45 according to your requirement.

 

Frequency inverter (VF) Type building construction hosit:

Characteristics

Model

Rated Loading

Lifting Speed

Motor Power

 

 

Double Cabin

 

Low-speed

SC200/200D

2×2000kg

0-33m/min

2×(3×11kw)

SC100/100D

2×1000kg

0-33m/min

2×(2×11kw)

Mid-speed

SC200/200Z

2×2000kg

0-55m/min

2×(2×11kw)

SC100/100Z

2×1000kg

0-55m/min

2×(2×11kw)

 

Single

Cabin

Low-speed

SC200D

2000kg

0-33m/min

3×11kw

SC100D

1000kg

0-33m/min

2×11kw

Mid-speed

SC200Z

2000kg

0-55m/min

2×11kw

SC100Z

1000kg

0-55m/min

2×11kw

Salient Features of Our products:

1. Mast section welded by welding Robot ensures reliable quality and elegant appearance.

2. All the steel structures are processed with blasting technology to remove rust. The adhesion of surface painting is outstanding.

3. Suspension cage guarding board adopts figured aluminum plate and numerical control punched aluminum plate. The suspension cage is lightweight and artistic in appearance. 

4. Transmission mechanism supplied by the professional manufacturer has high efficiency, long service life and stability in performance.

5. Complete set of overload protection devices, variety of limiters and mechanical chain devices ensure its reliability.  Anti-falling safety device, which restricts the excessive downward movement of the cage, preventing and eliminating accidents.

6. Frequency conversional construction hoist is safe, stable and comfortable. Starting electricity is smaller than working electricity, energy-saving and high efficient.


Descriptions of our building hoist:

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance, the gering adopts imported bearing, enameled cable, and oil seal, the electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG, the racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers, the surface of the structure can apply paint-spray, Parkerizing baking finish or hot galvanizing processing according to users requirements, the cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Material Hoist 

1. the recommended cage dimension(LXWXH):2.0X1.0X2.5, 2.5X1.0X2.5, 2.5X1.3X2.5, 3.0X1.5X2.5, 3.2X1.5X2.5, 3.8X1.5X2.5, 4.0X1.5X2.5, 4.2X1.5X2.5 etc, we can also manufacture cages of other size according to the user.

2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to your requirements.

3. The mast and the tie-in surface can adopt paint-spray, or hot galvanizeing processing.

 

Advantage of our building hoist:

1. Our own systems of production engineering.

2. Production design from the concept to the engineering details.

3. Technical experts with great experience in the sector.

4. Continuous development of new solutions and products adapted to the requirements of our clients.

5. Methodology and project procedure administration in compliance with current guidelines.

6. Extensive worldwide commercial network

 

CMAX Brand Building Hoist SC300/300


FAQ

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest stateowned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of variouskinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  




Q:Does the building height not exceed 40 meters must install the construction elevator?
There is an elevator quota in the budget quota, but how many floors can be priced?
Q:Why is the construction elevator open on one side and the other on the other
The two-door design is designed for the safety of the operator. In the discharge mouth, if you set up a single door, a large portion of your body will be exposed outside, causing falling damage.
Q:How does the construction elevator add up
With the popularity of construction lifter to use, but knowledge of the user of this kind of special equipment, and makes the construction lifter in use process safety accident frequency is higher and higher, it is necessary to everyone together to discuss how to eliminate the safety hidden trouble as possible. This paper makes a concrete analysis on the use of the construction elevator during the use of the elevator.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
The construction diagram of the elevator appears to be a qualified elevator construction unit
Q:How many guides are in the construction elevator
1 guide frame is 1508cm, the highest can be 400 meters
Q:The construction elevator can not operate during the use of several stages of wind power
11, when the wind speed exceeds 20m/s and the bad weather, such as hail, not use the lift." I'm a construction elevator This is the norm It's about a six-stage wind by 20m/s.
Q:Where is the location of the elevator in the project
The position of construction elevator is usually set in the project to facilitate access to material, material handling and personnel up and down, not affecting the construction process.
Q:The working principle of construction elevator
The construction elevator is a kind of common name, its standard name should be the construction elevator, this is a kind of crane machine equipment. Construction lifter adopts modular structure, because it is used in construction process, the elevator needs to be constantly shift with the construction project, therefore its structure must be easy to disassembly and assembly. For example, after the site is used, the elevator is disintegrated and transported to another site for reassembly of construction elevators. So how does the construction elevator work? The construction elevator mainly carries the structural self-forming system, and the construction dependence is low. It more driven by force, drive devices are installed on the hanging basket, through the gear and rack drive system, the mutual cooperation, so as to realize the rise and fall of the elevator. You may have seen gear and rack in the mechanical clock, the gear is round, the rack is straight, and the two bite together to achieve the motion. The elevator work that is common in our residential and commercial buildings is different from the construction elevator. Most of the elevator parts are fixed in buildings, which are mainly carried by buildings. Its movement is achieved through wire rope.
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Cranes and elevators from very close, may be the reason for the sites or the position is not reasonable, so close to the distance as long as you ensure the tower crane and tower crane arm when rotating to the above the elevator after satisfying the end, must keep more than 2 meters with elevator recent distance. Or you can refer directly to the tower crane safety code, GB5144-2006.
Q:How long does the construction elevator do a crash test
For the safety of the crane, the anti-drop safety device must be certified every 1-2 years.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords