4 Way Curved Balde Air Diffusers air conditioner

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016


Data Sheet


 1

Item

HVAC aluminum air conditioner grille

 2

Materials

Extruded Aluminum alloy (6063-T5)

 3

Blade

Blades in 45°from aluminum profile or as customer’s requirements

 4

Bar spacing

30mm as standard or as customer’s requirements

 5

Materials

0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 

 6

Surface Finish

Powder coated, Anodized , PVDF, Mill finish.

 7

Size 

Width x Height, any sizes available

 8

Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.

 9

Color

Refer to RAL colors swatch or customized colors available

 10

Design

Drawings designed according to the customers’ requirements

 11

Payment terms

T/T, L/C, PYAPAL, etc.

 12

Delivery time

Usual 15-20 work days for a 40GP container 

 13

Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 

 14

Mesh

Stainless steel security mesh, Aluminum security mesh

 15

Type

Fixing and adjustable installation

  

Usage of Air Diffuser


· Adjustable aerofoil-designed blades provide users with the flexiblility to cater to their personal needs. Blades are individually adjustable from the face of the grilles.

· From extruded aluminum of minimum 1.0mm thickness. All grilles are manufactured from highly corrosion resistant heavy gauge aluminum.

· Corners reinforced with welded corner pieces for robust handling during installation. 

· Standard powder coated white finish. Painted finish will be enamel coated and oven baked. 

· Anodised finishes and other finishes are also available upon request.


 

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner


Production Line

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner


FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Home coal-fired heating stove and electric heating furnace which is good
Coal, cheap to save money. Electricity, clean and easy to control, expensive
Q:Solar water heating system energy-saving projects in what energy-saving sub-item, heating energy-saving projects Well?
You are registered or heating works basically useless
Q:To warm the system main material and auxiliary materials which include what
1, to warm the main material parts are: wall-hung boilers, heating the main channel, sub-catchment, to warm pipe, such as temperature control. Large houses are also equipped with heating circulating water pump (from the pressurized effect), constant temperature mixing valve (energy saving and good comfort) and so on. These devices are the main part of the warm floor, but also to warm the main supplies, especially the boiler and to warm the tube, the basic occupation of the vast majority of the warmth of the ridge to bogey Yao Xu surprised only super-fee; Some are: reflective film, extruded board (insulation board), steel wire mesh, the border insulation strips, to warm the staples, insulation casing, raw materials, such as ball valve. The price of these auxiliary materials is not high, more varieties, the market is complex, but these accessories are warm to install the important details of the heating system to the energy-saving effect and insulation effect is to warm the auxiliary materials are inseparable.
Q:Pavement should pay attention to what the details,
1. Handling and installation of pipe, the pipe surface shall not be scratched, slightly hurt; The pipe should be laid on the soft and flexible surface, and no hard sharp objects; A folder for the better, and less plug-in connection; The pipe is fixed with plastic tube card is better; 6, has been doing the low temperature to warm, is strictly prohibited on the ground ticking nails, holes or stacking heat 7, after the installation of the geothermal system, at least two to three months and then pave the floor, so that the ground can be completely dry.
Q:What are the advantages of home gas boiler?
The advantages of a large number of home gas boiler, platinum diagram of the boiler as an example, then at least the following advantages: 1, heating, and domestic hot water can supply; 2, heating temperature stability, water temperature can be adjusted; Flexible, simple operation; 4, high thermal efficiency, cost savings, conducive to environmental protection; 5, less land, take up less space 6, high comfort, good heating effect. & Lt; & lt; / RTI & gt; & lt; / RTI & gt; re are a lot more!
Q:Do you have a good geothermal cleaner?
OKorder workers to warm the washing machine is very good operation, the Internet has a video operation. The specific operation steps are as follows: 1. Close the manifold main control valve and also open the sub-valve is also closed. 2. Place the drain on the side of the divider and install the quick connect. 3. The host pulse output, inlet pipe, water separator sewage pipe connected. 4. Check the various parts of the connection is not leaked open cleaning. Cleaning pipe Note: 1. The connection must be tightened to prevent leakage, must be inserted in the end of the tube, when the card must be broken to the end of the ring. 2. The drain end must be inserted into the sewer mouth to prevent contamination of the environment when it is discharged. 3. Before cleaning, be sure to ensure that every road to warm pipe without discount. 4. Cleaning should pay attention to the pump pressure to prevent the pipeline blockage pulse generator can not work properly, to stop the work analysis reasons. 5. The pulse generator found that there is leakage of water leakage phenomenon should stop working troubleshooting. 6. If you encounter the construction environment in the water source can be more distant piping connection.
Q:What is the basic task of heating engineering?
What is the basic task of heating engineering? The heating system is composed of some parts...
Q:Principle of pulsed geothermal cleaning machine
Practice has proved that the method of pulse geothermal cleaning is far from the effect of good projectile, the so-called pulse is a pulse device, the name is the water to form a spiral to play out, and then rotate in the pipeline flow to the flushing pipe wall The role of the general situation are part of the water block part of the blockage is serious, the mouth can not get into the water how will rotate in the wall? I have been engaged in geothermal cleaning has five or six years, the pulse of the basic method is a hammer , The effect is very poor, and always call me this is not hot, obviously not hot, so less than a last resort I will not use the pulse, and only those who can not be demolished, or with the projectile. Since you have been demolished on a demolition in the end chanting, that thing is very simple, the cost of the burden of the child from the nuclear shop as you said it is one or two hundred dollars, only two solenoid valves, and a control of the intensity Small board, purely bluffing stuff
Q:What is the principle of warm What do the fuel
What is the principle of warm What do the fuel...
Q:What is a family independent heating system
Own heating, and has nothing to do with others

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range