Tower Crane TC4808 construction machinery Manufacturer
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery of Tower Crane TC4808
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC4808
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC4808 Specifiction
Independent height (m) | 31.5 | ||||||
Max height with attachment (m) | 110 | ||||||
Working range can be adjusted(m) | 38、43、48 | ||||||
Min working range(m) | 2.25 | ||||||
Max lifting capacity(t) | 4 | ||||||
Tip load @ 48m(t) | 0.8 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 1 | 2 | 2 | 2 | 4 | 4 | |
Speed(m/min) | 70 | 35 | 7 | 35 | 17.5 | 3.5 | |
Motor | YZTD225M2-4/8 /32 15/15/3.5KW | ||||||
Trolleying mechanism | Speed(m/min) | 20/40 | |||||
Motor | YDEJ100-4 /8 2.4/1.5KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YD132S-6/8 2.4/1.8KW | ||||||
Climbing speed(m/min) | 0.4 | ||||||
Counterweight(t) | 7.6 | ||||||
Mast section size(L×W×H)m | 1.4×1.4×2m | ||||||
Working temperature | -40-+60℃ | ||||||
Total power (KW) | 23 | ||||||
Power supply requirement (KVA) | 115KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||||
Startup voltage & current | 380V×95%=361V 180A | ||||||
Rated working voltage & current | 380V 65A |
Images of Tower Crane
FAQ of Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
- These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
- Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q:Since a crane has to extend outriggers while performing lifting operation , is it ok to allow a crane to transfer materials by carrying without extending outriggers and lifting and carrying load to different location especially in construction industry for safety reasons?
- It would work but there's the danger of the load swinging damaging the crane or other vehicles or losing it's centre of gravity toppling etc. when it's moving. For most lifts the outriggers are required to stabilise the crane itself - not the load. You're dead right - the on-site safety protocols that are in place these days demand that everything is done absolutely the right way. If anything goes wrong there's be hell to pay for anyone involved even if they've done their best to get things right.
- Q:Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
- Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
- Q:You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- The first crane generally arrives on a trailer or on it's own wheels.
- Q:What is the insulation resistance of tower crane?
- Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
- Q:Just curious... I'm not in construction and always wondered...
- The top sections of the mast beneath the crane are removed one at a time and lowered to the ground. The top section of the crane has hydraulic rams that lower it down one mast section at a time. It is hard to describe without a diagram or photos. See photos at attached link. In some design, the jacking portion is at ground level. The crane jacks itself up so a 20' section of the mast can be unbolted and slide out. Then the jack is lowered so the process can be repeated. See second link for photos and a more detailed explanation.
- Q:What is the name for a group of cranes?
- A herd of cranes n.b. A siege or sedge is actually for herons or bitterns, although cranes are a similar bird so there's no reason those terms wouldn't be acceptable
- Q:Tower cranes sometimes have very long booms, but seem to usually have fixed counter-weights at fixed positions behind the cab. Why doesn't it flip backwards when there is no load, or flip forwards when a load is way at the far outward end of the boom? It seems to be a very large range of moment arms given that the counter-weight has a fixed one.
- I think the counter weights are connected to a pully system that directly interacts with the boom and hook movement. This way it can put more or less pull on the weights according to the amount of weight or position of the weight on the crane.
- Q:my overhead crane refuse to work transvesely
- Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC4808 construction machinery Manufacturer
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords