• Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger System 1
  • Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger System 2
  • Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger System 3
  • Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger System 4
Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger

Sany Sy75c 8ton Crawler Excavator Mini Small Track Digger

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Operating Weight:
7.28 T
Bucket capacity:
0.28 m³

Safe and Comfortable Operating Environment

1. Clean, Quiet and Well-sealed Cab

2. Innovative Large Cab, Air-conditioner with Multiple Air Outlets 

3. Multi-functional controller ensures constantly optimum condition of the system. When the joysticks are not operated for 3.5 seconds, the engine will lower the speed to reduce fuel consumption. 



Specifications of SANY SY75C 

Engine modelIsuzu 4JG1
Rated power40/2100 kW/rpm
Emission standardTier 2
Operating weight7280kg
Std. track shoe width450 mm
Bucket capacity0.28 m³
Boom length3720 mm
Arm length1620 mm







FAQ 

1: What kind terms of payment can be accepted?

A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted

2: What certificates are available in Machinery?

A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,

3: What about the delivery time?

A: 7-20 days after receiving the deposit.

4: What about the warranty time?

A: 12 months after shipment or 2000 working hours, whichever occuts first.

5. What about the Minimum Order Quantity?

A: The MOQ is 1 pcs    


Q:What is the capacity of the 'bucket' or 'backhoe' of a large construction excavator for commercial buildings? What is the capacity of a dump truck that takes the payload from such an excavator? I'm trying to figure out how many dump truck trips and how many scoops of earth it will take to excavate a 40m x 20 m x 4 m hole, for an apartment building construction site.
well that stuff is pretty impressive, but try cubic yds or meters etc, it might help simplify it.
Q:framing for commercial buildings. I'm helping him fine tune his resume and need to describe his education and experience with project management and estimating.
Just put down Project Management, Project cost estimation and scheduling. Time line managemnt, PERT-CPM etc.
Q:It is a cummins engine
Something is cracked here..ask cummins for details...
Q:The county building code for my area specifies that the drain for my sump pump must be 10' from the property line. In order to meet that specification, and because the yard tends to be flat or uphill, I need to basically drain directly where the pipe comes out of my house. My gutter is also in that immediate area.I have an idea of how I want to drain both the gutter and sump pump that will eliminate concerns of ground erosion and avoid the accumulation of water in that immediate area, but I am looking for opinions.I plan to get a water deflector that directs the water 45 degrees opposed to one specificed direction. Then I plan to dig out an area around this spot that is maybe a foot deep and maybe a couple feet wide, put in erosion fabric, and backfill with rock. Is this my best option.I have no where to run a corrigated pipe and no down hill access
As long as your trench runs downhill and ends where the water will not end up back at the house then that sounds good. Careful not to dump it on your neighbor. Try to run it to the street. Use cobble stones over the fabric. If your are in arid climate try to use it to water any vegetation.
Q:How do I get my basement to stop flooding?
The first answer is pretty much on track. You need to dig around the outside of the whole foundation. You need to replace the existing tile around the foundation. If there is no tile, which is the case with older homes, you need to put tile in. After the tile is in place, cover it with gravel, the more gravel the better. The gravel lets water filter down to the tile. Now, I would have to see your problem to diagnose it correctly, but you may need block replaced, if you have a block foundation. after replacing block, plaster the outside with mortar. The next day, go ahead and tar the wall as well. This will water proof the outside and prevent water from penetrating through the porous block and mortar. Like I said, I would really have to see the house to make a correct assessment, but I hope I have helped.
Q:it's currently -30 degrees out, brother in-laws who owns the machine is out of town and cannot find the plug to prewarm the engine,
On the 312c it has a 3064T cat engine that doesn't use a block heater. It uses a circulation heater which is usually installed either on a heater hose, or on the lower radiator hose. Check the hoses to see if there is a cylinder or a box with a plug on it. If it doesn't have one, they are available at most equipment or automotive stores. You would have to know the inside diameter of the hose when you go to purchase a lower rad hose model. If it's going in a heater hose, they are a standard 5/8. Hope this helps you. Keep warm! Rob
Q:how much does a cat 311 excavator weigh?
About 24 400 lbs?
Q:What documents do I need to open the excavator for insurance?
As long as the driver's license is complete, you can do it
Q:How large is the capacity of the 60 crawler excavator?
Excavator bucket excavator digging machine is 60, according to the different brands with bucket capacity is different, like Komatsu PC60 bucket 0.28 and 0.37 two, with 60 of the 0.2 Party's Hitachi 60 is the 0.22 party, the Volvo 60 is the 0.22 party, the 0.2 party is Futian leiwo, Xugong 60 is the 0.23 party what to say is not the same, I was doing the excavator bucket, ripper to understand these, refer to it
Q:Was it his inability to keep the country safe during 911?Or the lying about the WMD's? The Iraq War?His absolute greed with Halliburton?The torture?Or just being totally full of S*H*I*T?What is it that makes all CONS want to suck on his wiener and A*S*S*HOLE non stop?
1) The DEMOCRAT-run 9/11 commission blamed DEMOCRAT policy for preventing us being able to stop 9/11 and acknowledged the Bush administration had already been working on changing it. 2) YOUR favorite news outlet told you HUNDREDS OF TONS of WMDs were seized and removed by coalition forces after the invasion. 3) You are literally 100% certain you have no hope of citing any way Cheney was involved in starting the war. You don't even know what his job was at the time. 4) He let Halliburton DELAY paying what they owed him and spread it out over many years. 5) Dishonestly NAMING what U.S. trainees go-through as torture doesn't actually make it illegal torture. 6) You KNOW you can't cite even one Cheney lie. 7) You also can't cite ANY evidence that he was ever particularly popular among cons, unless you have a completely INSANE definition for that. Pretty impressive that you couldn't think of EVEN ONE POINT you dared be honest about.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches