• Matching Mixer Construction Mixing Plant System 1
  • Matching Mixer Construction Mixing Plant System 2
  • Matching Mixer Construction Mixing Plant System 3
Matching Mixer Construction Mixing Plant

Matching Mixer Construction Mixing Plant

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
5000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Matching Mixer Construction Mixing Plant

Matching Mixer Construction Mixing Plant

BRIEF INTRODUCTION

 

Theory productivity 75 m3/h              Matching mixer JS1500

Discharging height  3.8 m                Aggregate metering precision ±2%

Cement weighing precision ±1%         Water weighing precision ±1%           

Additive weighing precision ±1%

Control room 6 m2                        Aggregate hopper volume 15m³×4

Cement silo: 100t   (optional)           Cement screw conveyor: Ф219 (optional)

Floor area 30m×12m                    Total power: about 105 kW(Not including screw conveyor)

Gross weight :33 tons(not including screw conveyor and cement silo)

PART III: TECHNICAL DATA

 

Item

Specification


 

 

 

 

  1

Aggregate Supply System is composed of aggregate bin, frame, weighing hopper, 

aggregate conveyer and sensors.

1、 Aggregate bin

⑴ Volume: 15m3×4

⑵ The feeder: 8

⑶ Cylinder: bore 100 stroke 300 (with solenoid valve)  

8 pieces 

2、 Weighing hopper:

⑴ Volume: 5000L

⑵ Measure mode: measure together

⑶ Sensor: STL-2000 qty: 4  Amcell America

⑷ Measuring precision: ±2%

3、  Belt conveyor with cleaner 

⑴ Belt specification: 650mm  

⑵ Belt speed

4.   Driven drum:CG-φ320*750Z

Electric power: 7.5kW

5.   Vibrator: MVE200/3  Oli-wolong 

Power: 0.15kW      4 sets

2

The elevating system 

1) Electric Windlass:  Power: 22kW

2) Convey capacity: 2400L

3) No Temporary storage hopper

4) Discharging material gas cylinder: 

5)  Windlass engine: XWN39-17-22

3

Mixing System

Model: JS1500/Twin-shafts horizontal forced type

Charging volume: 2400 L

Discharging volume: 1500 L 

Discharging height: 3.8m

Motor power: 30kW×2

Mixing blade、 lining board: wear resistance material

System instruction:

Planetary gear reducer, small volume,high efficiency,high reliability.

Lining board and material of blade are chrome wear-resisting cast iron, reasonable design 

of angle and quality mixing efficiency,quick speed and long service life.

Discharging gate is controlled by hydraulic oil pump. There are three stick points and no noise.

Overweight design and good damping

4

Mixing Platform 

Discharge height  3.8m

Mixing platform 

electromagnetism valve

Stairway, platform, handrails

5

Cement weighing system

Cement weighing system is composed of cement weighing hopper, pneumatic butterfly valve, sensors and so on.

Cement weighing system

Volume: 700L 

Weighing range: 0~700 kg

Weighing precision: ±1%

Sensor: SSB-Ⅲ-500  Qty.: 3 Amcell America 

Pneumatic butterfly valve: BV1F300S 

Vibrator MVE100/3 Oli-wolong

Power: 0.09kW   

6

Water weighing system

Water weighing system is composed of pool (made by 

customer themselves), water pump, pneumatic butterfly valve and so on.

Volume: 500L 

water supply pump:  QY50-18-4kW  

Pipe pneumatic ball valve

Discharging pneumatic butterfly valve

Weighing precision: ±1%

7

Additive weighing system including the box and pipeline

Liquid additive weighing system is composed of additive storage box, additive weighing hopper, 

pneumatic butterfly valve and sensor and so on.

1.Additive supplying pump power: GISG25-125-0.75KW

2. Pneumatic three way ball valve

3. Additive storage box: 2 m3            

4. Weighing precision: ±1% 

5. Weighing hopper pneumatic butterfly  Volume: 40L 

 

  8

Pneumatic system is composed of air compressor, gas cylinder, electromagnetic and pneumatic components. 

1) Air compressor: power: 11kW

2) Electromagnetic:

a) Main tower electromagnetic valve of 

pneumatic control case              

b) Cylinder electromagnetic valve   

c) Cement break electromagnetic valve  quantity is

same as powder storage

3) Air supply disposal components 

9

Control System

1. The operation is integrated with management .It is easy and convenient to operate.

2.The batching system is controlled by the microcomputer. 

3.The operating data of the mixing plant can be saved for more than ten years for the convenience of

setting management.

4.The formula which can reach more then dozens can express by the figures for the convenience of 

distinguishing. 

5. It has the function of error analysis and automatic checking.

6. Under the condition departing from the automatic control .The manual operating system can finish the 

control of the mixing plant such as batching, mixing discharging.

7. The heavy-current part of the system is separated from the weak-current part, so it enhances the ability

 of anti-jamming. Easy to maintain. 

8. Equip with printer

9. Equip with air-condition 

10.Control room: 6m2

System instruction:

The main hardware of this system adopts Germany Siemens  products with advanced performance, high 

reliability and beautiful exterior. Console adopts man-machine engineering design, comfortable operation.

12

Screw conveyor (optional)

1. Model:∮219 

2. Conveying capacity: 45t/h

3. Power: 11KW

4. Quantity: ∮219

13

Cement silo (optional)

1. Model: Piece type easy to load and transport

2. Capacity:  100t

Quantity:1 units

 We have the following services:

 

1. installation, debugging, operators trainning;

2. maintanence:

    A. when trainning your operators, our engineers will give them advice on how to operate the machines correctly;

    B. we will send you the operation manual which can help you operate the machins properly, it can also help you to solve   

   the common problems;

    C. Call us at any time if you have problems about our concrete plants;

    D. If needed, we will send engineers to your site to solve your problems.

3. providing documents needed for your customs clearance, like commercial invoice, packing list, certificate of origin etc;

4. spare parts supply;


FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered byOKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Concrete Machinery according to customersrequest?

A4: Yes, we can produce Concrete Machinery according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 




Q:What is the difference between a concrete mixer and a concrete mixer
Since a lot of people think commodity concrete, concrete stand and commodity concrete mixing floor are production of commodity concrete equipment, then there is no too big difference, most is just a big a small, one high a dwarf. But what's the difference between these two devices? So let's just do a little bit of an introduction. First commercial concrete, concrete stand and mixing building systems: the difference between a bituminous concrete stand composed of five systems, such as material supply system, measuring system, mixing system, electric control system, etc. The stirring building is relatively simple.
Q:What is the concrete of the mixing station?
I am at the work station, the concrete mixing plant is operating goods, use the material such as cement, fly ash, sand, water reducing agent in strict accordance with the provisions of the state standard the ratio of mixing, through concrete truck mixer (commonly known as "car" river) transportation to the construction site, recycled concrete pump for handlebar concrete on the building site. For building products safety, now the big building construction are banned to mix concrete, concrete supply must to the recognition of concrete mixing station to buy, hope to help you.
Q:Does the concrete mixing station name have the name of the businessman concrete
Yes, concrete means artificial stone, which can be understood as the simple writing of concrete, which means concrete for commercial concrete. This is the name of the blender
Q:What type of concrete mixer is needed for each hour of concrete 90 cubic meters?
If it's a theoretical one, it's going to build 90 lines per hour, which is 90 square hours per hour, and if it's actually 90 square, it's going to be at least 120 stations.
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What constitutes the js750 concrete mixing station
The concrete mixing station consists of the mixing system, the aggregate supply system, the measuring system, the control system and the external supporting equipment. The main purpose of the mixing station is to mix concrete, also called concrete mixing station. HZS series products adopt international popular cement concrete mixing station quickly assembled module type structure, high-performance imported agitator, double machine double control way of computer control, prevent noise, prevent dust pollution, environmental design, is the new generation of cement concrete mixing equipment, applicable to urban commodity ready-mixed concrete, road and bridge, water conservancy, airports, ports and other large infrastructure construction project and concrete demand for large sites.
Q:What are the advantages of HZS series of concrete mixing stations
HZS75 concrete batching plant investment amount, less occupied area is small, the use of equipment, maintenance easy, can be equipped with high performance of independent control room, make the equipment operation convenient and safe, and in the batching machine also can produce high quality under the condition of accurate measurement of concrete. This type of mixing station under our positive study also used the green environmental protection design, the construction of a possible pollution under control, rather than the old way of construction and transportation pollution, nature is winning.
Q:What is the special work of the concrete mixing station
The ratio of the concrete particles to the surface area, the shape of particles, the density of the particles and the grading of the particles, etc., are very important to the liquidity of the slurry. Smaller than surface area, the particle shape is closer to the ball, bigger, more filling and more liquid. By optimizing these factors, you can obtain the most appropriate liquidity. In order to design the concrete mix according to the engineering requirement, the characteristics of the aggregate material must be mastered first. The properties of aggregates are determined by factors such as microstructure, prior exposure and processing, and these factors influence the properties of fresh and hardened concrete. The effect of aggregate properties on concrete performance should be considered, and the quality of concrete mixing equipment should be considered. Before installation, check the appearance quality of the equipment again, the platform bolts are not loose, the welding seam is not cracked, the oil leak, the water, the ash (the lump), etc. Clean the assembly of the whole machine and re-spray paint, rust and renovate. Prepare the all kinds of bolts, welding wire, iron plate, etc., to prepare tools and protective equipment, the use of more tools for several sets of parts can use pneumatic wrench, and provide timely acetylene cutting, electric welding equipment; Plan the entry time of the crane.
Q:The mixing time of the concrete mixer is in which standard
Sales missed you do this to see how. If you have any project is continuous uninterrupted production, 24 hours a day, 365 days. As long as there is live, not to stop, of course, is to rest. Want to shift work
Q:How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords