Lattice Tower Type Concrete Placing Boom 38M With 4 R-Stage
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
The placing boom HG38 has a Z and R-shaped booms assembly with three or four foldable sections, which can swing through 360 degrees while luffing, folding/unfolding, thus allowing it to place concrete to form walls, pipes, columns, piles and other vertical structures without confined placement areas.
The boom assembly’s luffing; folding/unfolding and swinging are carried out hydraulically with buttons. The hydraulic and electrical system feature overload protectors, flow controls, alarms, phase sequence protectors and so on, which ensures the placing boom to have reliable performance, easy and smooth operation, and high safety.
Scope of Application of the Equipment
The HG38 concrete placing boom is a concrete placer for combined use with a concrete pump in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.
This equipment can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The equipment is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.
Product Advantages:
OKorder's Concrete placing boom HG38 Channels are durable, strong, and safety.
Main Product Features:
· Premium quality
· Prompt delivery & seaworthy packing (20-40 days after receiving deposit)
Reliable performance
Easy and smooth operation
High safety.
· Professional Service
· Competitive pricing
Product Specifications:
Dimensions and masses of the complete machine and its major components
Model | HG38 | |
Delivery pipe dimension (outside diameter × thickness) (mm × mm) | Φ134×4 | |
Delivery hose dimension (inside diameter × length) (″×mm) | 5″×3000 | |
Radius of placing boom (m) | 38 | |
Stationary height (to the joint between the end of the boom and Swivel table) (m) | 47 | |
Four hydraulic foldable arms | 1st section | 9.55m |
2nd section | 8.27m | |
3rd section | 7.11m | |
4th section | 7.07m | |
Boom articulation | 1st section | -4.2°~+82.5° |
2nd section | 0°~180° | |
3rd section | 0°~180° | |
4th section | 0°~180° | |
Slewing range (°) | 360 | |
Power of motor (kW) | 22 | |
Pressure of hydraulic system (MPa) | 28 | |
Type of hydraulic oil | ESSO NUTO H46 | |
Interval of climbing frame (m)
| Climbing | 3.0~4.2 |
Placing concrete | 6.0~8.4 | |
Resting | ||
Mode of operation | 1. cable remote control 2. radio remote control | |
Power | 380V/50Hz | |
wind speed | Placing concrete | ≤60 km/h |
Climbing | ≤28 km/h | |
working temperature | 0~48℃ |
FAQ:
Q1: How to control the Placing Boom HG38?
A1: The control system has two control modes for the user's selection: wireless remote control, and panel control.
Q2: How do we guarantee the quality of our HG38?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.
Q4: If we can produce some Concrete Placing Boom HG38 according to customers request?
A4: Yes, we can produce Concrete Placing Boom HG38 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q:How to install and use the distributor?
- In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
- Q:How to distinguish tower type distributor and general distributor?
- The steel spreader and the circular pipe distributing machine of the general distributing machine are all simple structures,
- Q:What are the benefits of concrete handling machines?
- The concrete distributing machine saves 3-5 people and improves the construction efficiency by 2 times
- Q:How to fit the cloth rod of the distributor?
- Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
- Q:What do concrete pumps and fabrics mean?
- Cloth machine, cloth form and automobile pump is similar, it is to use conveyor belt in the state without pressure to transport concrete, cloth machine is relatively heavy, slow walking, and the delivery of concrete material falls easily aggregate segregation
- Q:What are the acceptance items of concrete spreader?
- The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
- Q:What's the design plan of the concrete spreader?
- The belt conveyor head sweeper is designed for the special requirement of conveying concrete and cleaning mortar. The scraper is made of hard alloy material, with a rectangular section, and it does not hurt the adhesive tape and the mortar loss is small
- Q:How to maintain the concrete spreader?
- Four screw high precision quantitative cloth is adopted, and the error of cloth quantity is less than 2%. According to the field process, the traveling speed and the cloth speed are stepless flexible adjusted
- Q:what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q:What are the weekly inspection items for concrete spreader?
- Check connection bolts, shaft end plate, pin shaft, lock nut is loose
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Lattice Tower Type Concrete Placing Boom 38M With 4 R-Stage
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords