Wheel Loader Zl30f 3ton Diesel Engine

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Wheel Loader Zl30f 3ton  Diesel Engine 

Product Details

Basic Info.

Model NO.:Zl30F

 

Type:Large Loader

Usage:Universal Type

 

Scraper Type:Pull Scraper

Transmission:Power Transmission

 

Walking Mode:Wheeled

Load and Unload Method:Front Discharge

 

Certification:CE, ISO9001: 2000, BV SGS etc

Condition:New

 

Color:as Required

Model:Zl30f

 

Bucket Capacity:1.7m3

Rated Load:3000kgs

 

Engine Type:Lr6b3-22

Engine Rated Power:92kw

 

Dumping Height:3050mm

Dumping Distance:974mm

 

Fuel Tank Capacity:150L

Total Weight:9950kg

 

Overall Dimension:7105*2400*3080mm

Export Markets:Global

Additional Info.

Trademark:YU JIE

 

Packing:Nude Packing

Standard:CE, ISO, SGS, BV

 

Origin:Henan, China (Mainland)

HS Code:8429510000

 

Production Capacity:50000 Sets/Year

Product Description

ZL30F 3ton Dongfang Diesel Engine Wheel Loader, Automatic Wheel Loader, Stepless Hydraulic Wheel Loader

Main Features:

This machine uses Dongfanghong diesel engine(LR6B3-22) which features good power, economic fuel and environmental protection.
2. The loader adopts the single-stage 3-element hydraulic torque converter, the fixed-spindle 4F+2R power gearshift transmission box, and both are featured with their reliable performance.
3. The loader adopts the fully hydraulic steering device, which is flexible and easy to operate, small in its turning radius and stable in its performance.
4. The front and rear frames adopt the box-type structure, which is strong in its strength and good in its rigidity.
5. Integral operation platform, streamline design and humanized operation layout is applied, equipped with new type of electronic instrument, which is capable of quickly monitoring the working condition of the whole unit.
6. This may select for and use anti-vibration shelf, scuttle, rocket bucket, wood-fork and several working units under demand for customer and different work statuses.

Remarks:

01- Container Needed: One 40HQ container

02- Payment terms:
- TT 30% in advance, balance 70% by TT before shipment.
- TT 50% in advance, balance 70% against BL copy.
- TT 30% in advance, 70% against LC AT SIGHT

03- Production Lead Time: Around 15 working days upon receipt of advanced payment.

04- Logo and color: As per customer's requirement

05- Documents: Bill of Lading, Commercial Invoice, Packing List and The Certificate of Origin.

06- Production Lead Time: Around 15 working days

07- Certificate: CE European Standard

08- Capacity we can supply: 400kg, 600kg, 800kg, 1000kg, 1200kg, 1500kg, 1600kg, 1800kg, 2000kg, 2500kg, 2600kg, 2800kg, 3000kg, 3600kg, 5000kg, 6000kg.

Bucket capacitym31.7
Rated loadkg3000
Movable arm lifting timesLess than 6.5
Three-item-sum timesLess than 12
Min. turning radiusmm5700
Total weightkg9950
Forward 1-4 gearKm/h6.5-36
Reverse 1-4 gearKm/h7.5-23
Dumping heightmm3050
Dumping distancemm974
Overall dimensionmm7105*2400*3080
Engine model
LR6B3-22
Engine rated powerkw92
Fuel tank capacity150
Fue consumptionLLess than 232

Wheel Loader Zl30f 3ton  Diesel Engine

Wheel Loader Zl30f 3ton  Diesel Engine


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:tank treads?
what about rubber treads, as used on small excavators etc
Q:when do i pay building contractors?
Typically they ask for at least half up front then the rest upon completion. If you were a business they may bill but since you are an individual expect to be asked for at least half to start
Q:need help with my 1st car!!! please help?
Always okorder.com/
Q:Whats one of the best ways to pursue a house flipping career?
Flipping fell apart 2 years ago, due to long DOM and the lagging housing market, make flipping a sketchy proposition at best.
Q:What's the price of the CAT150 excavator?
Solution 1:Last year the situation is bad, 307D cut prices 50 thousand, because Carter 100 years of construction machinery, the price is floating. Now Carter is not 315, beginning with the letter on behalf of the type of machine to correct, so I'm not sure how much money are you going to specific areas in which to buy it, Carter excavator series are at the beginning of 3, it is 313D and 318D, that is to say 3 mining modelsSolution 2:CAT320D is 1 million 180 thousand, the Hitachi 240 is 1 million 230 thousand, 200 is 890 thousand, Komatsu 200 is 910 thousand, 220 is 1 million 30 thousand, 200 is just God 860 thousand, modern 225 is 790 thousand, 225 is 780 thousand Daewoo. These are now more mainstream, (the price of 1-2 million to fluctuate within the normal range. You should say 150 in 400 thousand to 600 thousand!Solution 3:Are you talking about new or second-hand, new almost 50W, second-hand, then you can go online www.sdcmm.cn to see their own reference
Q:What is included in an amalgam tray setup in order from left to right?
Uhm....are you suppose to be studying for a test and want us to give you the answers? :)
Q:Can someone translate this from swedish?
www.okorder.com/
Q:how to bake an excavator cake?
Assembled from a pound cake and Twinkies, this no-bake treat will please the crew at a celebration with a truck or vehicle theme, or at our construction party. Ingredients 9 1/2-by 4-inch pound cake 1 1/2 cups yellow frosting 1/2 cup light-brown frosting (white and chocolate mixed together) Chocolate decorators' frosting 4 mini chocolate-covered doughnuts Blue and green MM's candies Red and yellow gumdrops 4 Twix 2 Twinkies 4 (8-inch) wooden skewers, trimmed into two 4K-inch and two 6-inch pieces 4 yellow Twizzlers Rainbow Twists, cut to the same size as the skewers 12 chocolate cookies (we used Oreo cookies) X Instructions Cut a 2 1/2-inch-long section from one end of the cake. Frost the section's cut end and place it on top of the cake for the cab, as shown. Cover the entire cake with yellow frosting, saving about 1/3 cup for the loader and bucket. Spoon the light-brown frosting into a resealable sandwich bag, snip off a corner, and pipe a window onto each side of the cab. Outline the windows with chocolate decorators' frosting, then press the doughnut tires in place. Add MM's and gumdrops for lights and hubcaps. Use Twix to add a smokestack and loader arms. Frost one of the Twinkies yellow, set it on the loader arms, and add chocolate decorators' frosting details. Cut a 2-inch section from the other Twinkie, place it behind the truck for the bucket, and frost it yellow. Add pieces of yellow gumdrop for teeth. Slide the skewers inside the Twizzlers. Press them into the cake and bucket as shown, using dabs of chocolate decorators' frosting to join them. With a rolling pin or food processor, crush the chocolate cookies into dirt and sprinkle it around the cake. Serves 8.
Q:What equipment do I need to dig up a ton of earth and rock?
GE is right. If you're trying to save money that's the best way. Use a Sharp-Shooter, the skinny shovel, it can bust up rock as long as you hold it tight and keep banging the rocks. For really big rocks they have a thing called a Beaty-Bit, It's basically a manual jack hammer. Where a back-brace.
Q:how long approx to dig 24'x12x8 hole with mini excavator?
If you are a first time operator, you CAN'T make a hole that size, regardless of how you attempt to shore it. Keep your cell phone handy so you can call for help from UNDER the excavator inside the hole.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range